From: Tew, Keith <Keith.Tew @raleighnc.gov>
Sent: Tuesday, December 02, 2014 4:01 PM
To: Hy Nguyen
Cc: Du Le; Smith, Cherri L; Alsmeyer, Eric C SAW; Burdette, Jennifer a; Higgins, Thomas;
Ritchie, Kenneth; sienkwiczcontracting @nc.rr.com; Sanchez, Cesar; Massengill, Robert
Subject: RE: Van Hanh Temple, Sewer Stream crossing
Attachments: ATT00001.c; ATT00002.htm
Hy:
Typically in a doghouse MH we require that the invert of inlet pipe match crown of outlet pipe per CORPUD detail S -22. In
this case we allowed the crown of inlet pipe to be lowered to match crown of outlet pipe to maximize depth under the
creek crossing. We are not comfortable lowering the invert any more due to hydraulics associated with major
interceptors.
To clarify the private pump service option:
This was not meant instead of the standard gravity sewer extension requirements to your property, & I am not referring
to a conventional public or private PS / SSFM design that has to be permitted through our office; also the new CORSSE
cannot be used for a private service connection of any sort - as opposed to extending the public main.
I threw this option on the table just in case you found that you were able to extend a gravity sewer main along Forestville
Road to your site, but then perhaps be unable to connect to it via standard gravity service due to natural topography or
grading on your site. In this case you could simply install a small private sump pump & force a service connection to the
last upstream MH in your street frontage - all work falling under the purview of plumbing rather than site utilities. This
whole scenario very well may not apply to your project at all, but at the same time I did not want to rule it out in case the
field survey worked out this way. If you determine that the site can be served in this way (versus a sub - standard aerial
creek crossing), we may reconsider what the sewer extension & easement dedication requirements to adjacent properties
will be - depending on the best information available to us at the time.
Keith
w
Keith A. Tew, PE
From: Hy Nguyen [ mailto :HNguyen @dprassociates.net]
Sent: Tuesday, December 02, 2014 12:17 PM
To: Tew, Keith
Cc: Du Le; Smith, Cherri L; Alsmeyer, Eric C SAW; Burdette, Jennifer a; Higgins, Thomas; Ritchie, Kenneth;
sienkwiczcontracting @ nc.rr.com; Sanchez, Cesar; Massengill, Robert
Subject: RE: Van Hanh Temple, Sewer Stream crossing
EM
Thanks for your email. We have ordered the surveying shots on the existing creek and will overlay it on our current
design to see exactly what has been changed and the exact exposure of the encasing over the creekbed. Will keep you
posted.
i
111:"IR ASSOC A'1'[-ES, IlllN(
landscape architecture, civil engineering, & planning
420 Hawthorne Lane, Charlotte, NC 28204
O. 704.332.1204 Ext. 115 M. 704.340.0641 F. 704.332.1210
www.dprassociates.net
hnauyenOdprassociates.net
40Years'. "MA >n the Land W orl for Yoti"
Any l attached e'lgrtal fNe(s) are supplied by DPR Associates, Inc to the above recq) ent(s) as a deslgnl construction sic' Be advised (fist the attached files) ma,yl or
may not be lhe final record draviiinga, Any l irrformatlon obtalned from th ci d1g1tal files) shall be used for reference onl,y,
From: Tew, Keith [ mailto:Keith.Tew @raleighnc.gov]
Sent: Tuesday, December 02, 2014 10:18 AM
To: Hy Nguyen
Cc: Du Le; Smith, Cherri L; Alsmeyer, Eric C SAW; sienkwicgcontracting @nc.rr.com; Burdette, Jennifer a; Higgins,
Thomas; Ritchie, Kenneth; sienkwiczcontracting @nc.rr.com; Sanchez, Cesar; Massengill, Robert
Subject: RE: Van Hanh Temple, Stream crossing
Hy:
I have discussed the new stream crossing with Manager of Plans Review group & Assistant Utility Director over all land
development. The original design was less than ideal but we felt the slight exposure was an acceptable risk. However an
aerial crossing below Q25 does not meet min state criteria for gravity sewer & presents us with major concerns regarding
stream blockage & associated ongoing maintenance & repair issues. For now, you are not authorized to construct the new
stream crossing pending a more thorough investigation of all design alternatives - to include the following:
How does this new elevation effect your NCDWR & USACE Permits? CORPUD would like a brief email response
from each agency if they are agreeable to do so
U3,.I,1° Ira "ir..,!rnnY IC I a i a ^.:;a�iyva ^.ir �i °ia�i °i�,l I�VQ,V �flCI Qawl a; "Il�a�i� aw�,ullllily i�." °i� a�i� "� " na ^. ;� I�VQ,V �flCI Ira ^.ir':.irnnu� awa; "e
MylNpv 25 eirn"na(i Ihek)w for the eirn"nail fa)llllao gp t o awlha^.Iltoin Ipg! blls irec uga^s I ��Ilso spoke f-th USACE
(Eirilc Allsirn"na^.ver) and fill fi)I IQdW LID a2afiirt. II fill aSk for eirn"nali ira^.siDOinse froirn'n Ihoth,,
Do yQtlg gflgA 1II"ng p7 [pC7Qtlsed 8 " sQ ".wei SwIo 7g to the IQes o tha in 0 3% a in -tIie II in at hQtlttoirrn invert Qtlf.the 15 "
sewer Irn'na in fiinstead of Irn'natchiil g Ali g gir() ln?..IIt w ouulkl Ilhn^.IIp g Illlttle eve In.thm,igh lrn' gj� ;llbfil g the a corm is a
I:aQ ".ttQ ".IY dQ".sligD since the IIIve sQ "arvn ".IYagge is `Y4 fl, L,
• Consider relaying a portion of the Harris Creek interceptor to obtain the depth necessary to accommodate a
conventional crossing under the creek. Again sufficient field survey data will be required to either affirm or rule
out with absolute certainty
Di)[I" Agagli n "t"e existing 15" DiD sQ ".aF"4Q'„ ".IY was sl,IIlY1/Q".yg°j I II"gsQ J5%a and 0 m'7 %sIQ)pg oin the 2 Iruins
iirnirngdiate y l,llpstIrea it n of [ ()re.�o'�viII e fld flQ;;klylling g �7g!tiioin o o '�"e ein'�Iire I:"'oth �nQ ".a;tIIQtlIY`ns aF"4Qtll,kj not
Ian Q ". .C� .... ., .. .. .. .. .
i)Iease note that ,..tlhe I eirn'np g ar gs !rgg�iilred Icy Q ity non Rgllgiigb Ig a~Igsi °ig!) g!))j IVagiilki this pgb iia; g[gyiicy:
¢ y .. tQirn w i ... alldin g 7Ytl/id..i, in p n.. I a �,r Ir " Ie � ., � r :r�.. :I r �:, .raQlr� n Q1Qd � r n Ie �s I dFQ1QY" Qt.. I s I r Q
it
!
r.
nn'IY'rgao'�IYl,lla;'�I,IIIYa ".
in this Vicinity aF"4aga Irng a qda".gl,llaqia".Ily da".aolig ng"j to aga;a;oir nlYrnQtlda -te aol,lldh I ad this extension.
vdgs ag!)- tila;ll�7aq'�ed in '�"e orll�"�Illm ll 115 "" Ii n'tera;a".�7'�orN'�"e cra"ea <crossing aF"4Qtll,ll d Ib gyg l:�a"ein considered a in��'�he
15" Ir'n"na iilr�.. ouulkl have not I an^.ein Ihuufillt that shanllll )w,,
We a;glr) ir':g1?gsa^...g Iln1ngg! n^na;gsfiing IpII.l ?n^. gnd ....Iaullll I�gg� !be I�(I[g. giit Roca tiiolns froirn'n the IhalN<s oin IVaoth
sides,, I hat wouulkl lhn^.II[? irn'diniilrn'nfiziil g the filrn'nuM ggt oin the Ilh&Nl< We coit,ulla~j Ipin, Irfilp[glp g!) dog non 1Ji g n^. ggsn^d
eincasiinR r ". .,l„IIIr s Q;�"n its Inan't",a,lllrr ll a':Q'�"nn..
glrn�� Q.�', ��nQ. a:IYQ:;.Q.� IYQ.� � '�' "� „IIIYanQ ". QdvQ;? ".IY tIIIYIrnQ;;; "..
Please submit your findings, with the above requested emails, for further review & approval by staff. Thank you.
Keith
iW
Keith A. Tew, PE
From: Hy Nguyen [ma i Ito: HNguyen dprassociates.net]
Sent: Tuesday, November 25, 2014 2:16 PM
To: Tew, Keith
Cc: Du Le; Smith, Cherri L; Alsmeyer, Eric C SAW; sienkwicgcontracting a)nc.rr.com; Burdette, Jennifer a; Higgins,
Thomas; Ritchie, Kenneth; sienkwiczcontractinaCa)nc.rr.com
Subject: RE: Van Hanh Temple, Stream crossing
EM
3
The construction is underway with the doghouse MH. No crossing yet. The contractor is Sienkwicz Contracting; he's
copied here. I don't have the inspector contact.
I don't have the new survey of the creek profile, but based on the contactor's field staking working back from the
I've advised the contractor to stay put for now. Please advise.
Thanks.
i
1'; Ilf °° "III A OC A ni]EE , iiflN(
landscape architecture, civil engineering, & planning
420 Hawthorne Lane, Charlotte, NC 28204
O. 704.332.1204 Ext. 115 M. 704.340.0641 F. 704.332.1210
www.dprassociates.net
hnauyenOdprassociates.net
40Years'. "MAing 1he Land Worl� for Yoti"
Any l attached e'lgrtal fNe(s) are supplied by DPR Associates, Inc to the above recq) ent(s) as a e'eslgnl construction sic' Be advised (fist the attached files) ma,yl or
may not be lhe final record draviiinga, Any l irrformatlon obtalned from th ci d1g1tal files) shall be used for reference onl,y,
From: Tew, Keith [ mailto:Keith.Tew @raleighnc.gov]
Sent: Tuesday, November 25, 2014 1:59 PM
To: Hy Nguyen
Cc: Du Le; Smith, Cherri L; Alsmeyer, Eric C SAW; sienkwicgcontracting @nc.rr.com; Burdette, Jennifer a;
shelton.sullivan @ncdenr.gov; Higgins, Thomas; Ritchie, Kenneth
Subject: RE: Van Hanh Temple, Stream crossing
Hy, this change could change the status of your utility approval.
Typically for creek crossings we require the invert of steel casing to be 1.0' above Q25 - or the crown of DIP carrier pipe
to be 1.0' under the creek bed. We allowed a slight exposure of the casing in the previous approval given the depth of
sewer you are trying to connect to. Now the crossing is entirely (but barely) aerial, & without pier foundations - which is a
huge concern to the city with regard to stream clogging & associated maintenance / repairs.
Can you provide an overlay (profile exhibit) of the approved design with new field survey cross section? What is the
status of construction & who is your inspector? I am not saying that your approval will necessarily be rescinded, but I am
saying that I need to discuss this change with staff for a consensus on what we can & cannot live with. Meantime I'd
suggest that your contractor please stop work until this issue is resolved - thanks.
Keith
rs
g,
Keith A. Tew, PE
From: Hy Nguyen
Sent: Tuesday, November 25,2O1412:2OPM
To: Bun1ette,]ennifera;
Cm: Tew, Keith; Du Le; Smith Cherh i; Alsmeyer, Eric CSAW;
Subject: RE: Van Hanh Temple, Stream crossing NCDENR 401 Permit 14-0719
Thanks for taking my call today regarding the sewer crossing for Van Hanh Temple, Stream crossing NCIDENR 401 Permit
14-O719.
You have agreed to the above approach and stated that this email would suffice for the project records. (Let usknow
your decision on the rip-rap.)
Please let me know if you have any comments or if I've misstated anything otherwise.
I've copied Cherh Smith per your request. Keith Tevvof Raleigh Engineering, Eric A|smeyerof Corps, Temple Rep, and
their contractor are copied here as well.
ma�i�
111:"IR ASSOC N(
landscape architecture, civil engineering, & planning
420 Hawthorne Lane, Charlotte, NC 28204
O. 704.332.1204 Ext. 115 M. 704.340.0641 F. 704.332.1210
www.dprassociates.net
hna uven OdDrassociates. net
40Years'. "Making 1he Land Work for Yoti"
An; l attached d1g1tal ffle(s) are supplied by DP R Associates, Inc to the above recq) ent(s) as a design/ construction ald Be advised that the attached flfe(s) mayl or
may not be the final record draollngs An; l Informatlon obtalned from thc� d1g1tal flfe(s) shall be used for reference only,