Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG060148_DMR_20220713
SEMI-ANNUAL STORMWATER DISCHARGE MONITORING REPORT for North Carolina Division of Water Quality General Permit No. NCG060000 Date submitted CERTIFICATE OF COVERAGE NO. NCG06 0 1 4 8� SAMPLE COLLECTION YEAR 2022_ -- FACILITY NAME ceders-Lance Incorporated FACILITY ACTIVITIES INCLUDE (check all that apply): COUNTY Mecklenburg ❑ use/process meats ❑ use animal fats/byproducts PERSON COLLECTING SAMPLES Russell Everett DISCHARGING TO SALTWATERS? ®YES ®NO LABORATORY PAR Laboratories. Inc. Lab Cert.# 20 PLEASE REMEMBER TO SIGN ON THE REVERSE � Part A:Stormwater Benchmarks and Monitoring Results Total event rain_foll 21.48 or Ej Na discharge this period' Outfall No, Sample Collected, TSS, PM, COD, tail and Grease, Fecal ColiformI, EnterococciI, mo/dd/yr mg/L Standard units mg/L mg/L Colonies Per 100 ml Colonies per 100 ml Benchmark - 100 or 50 Within 6.0-9.0 120 30 1000 500 S DO-001 5/23/22 15 6.58 < 5 < 5.1 NA NA SDO-002 5/23/22 17 .52 5 < 5.1 NA NA SDO-003 5/23/22 12 6.49 12 < 5.0 NA NA SDO-004 5/23/22 13 6.47 < 5 <5.1 NA NA SDO-005 5/23/22 11 6.43 9 < 5.0 NA NA Only applies to facilities that use/process meats. The total precipitation must be recorded using data from an on-site rain gauge. 3 For sampling periods with no discharge at as outfalls.You must still submit this discharge monitoring report with a checkmark here. 4See General Permit text,Table 3,identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month?®yes ❑no {if yes, complete Part B) Part B:vehicle Maintenance Area Monitoring Results:only for facilities averaging>55 gal of new motor oil/month. '' Outfall No. Sample Collected, Oil and Grease, TSS, pH, New Motor Oil Usage, R- E IVE D mo/dd/yr mg/L mg/L Standard units Annual average gal/mo r1 Benchmark 30 100 or 50 6.0 9.0 - AUG 000 2022 SDO-005 5/23/22 < 5.0 6.43 CENTRAL FILES DWR SECTION Only applies to facilities that use/process meats. The total precipitation must be recorded using data from an on-site rain gauge. 3 For sampling periods with no discharge at any outfalls,you must still submit this discharge monitoring report with a checkmark here. See General Permit text,Table 3,identifying the especially sensitive receiving water classifications where the more protective benchmark applies. SWLJ-249 Dist Revised:October 18.2012 Page I of 2 ~FOR PART AAND PART MONITORING RESULTS: * A BENCHMARK EXCEEDAN[E TRIGGERS TIER IREQUIREMENTS, SEE PERMIT PART U SECTION 8. w 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART U SECTION 8. ° T|ER3: HAS YOUR FACILITY HAD 4OR MORE BENCHMARK EXCEEDENC[S FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES F-lNOX |F YES, HAVE YOU CONTACTED THE DVV(l REGIONAL OFFICE? YES n0O Fl REGIONAL OFFICE CONTACT NAME:monitoring period in the case of"No Discharge"reports) Mail an original and one copy of this DMR, including all"No Discharge"reports, within 30 days of receipt of the lob results(or at end of . Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based onrny inquiry ofthe person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best ufmoy knowledge and belief,true, accurate, and complete. | ann aware that there are significant penalties for submitting false info nation, including the possibility of fines and imprisonment forknowing v|o{ahons." �A.e— N jj 1 /3. ig�ature �\ (Date) Additional copies ufthis form may be downloaded at: 8WU-249 I-ast Revised:October 18.2012 SEMI-ANNUAL STAR WATER-DISCHARGE MONITORING REPORT for North Carolina Division of Water Quality General Permit No. NCGO60000 Date submitted CERTIFICATE.OF COVERAGE NO. NCG06 0 1 4 8 SAMPLE COLLECTION YEAR 2022 FACILITY NAME Snyders-Lance Incorporated FACILITY ACTIVITIES INCLUDE:(check all that apply): COUNTY Mecklenburg M use/process meats ❑ use animal fats/byproducts PERSON COLLECTING SAMPLES Russell Everett DISCHARGING TO SALTWATERS? [:]YES ®NO LABORATORY PAR Laboratories, Inc. Lab Cert.# 20 PLEASE REMEMBER TO SIGN ON THE REVERSE 4 Part A:Stormwater Benchmarks and Monitoring Results Total event rainfall 21.48 or [:]No discharge this period 3 04tfall'NOi SdmpWC61l0tfpd; TSS1 PH, COP, Oil and,Greuse, F'cal-.Wiform-11 rnqld0l,,Yr mg/L Standard.unl3s ft/ll. mg/1 01100iles per 100jol Cdtoffles pek,'100 rnl or 5i3 Within 6.0;-9sO y20 34 1006 SDO-006 05/23/22 94 6.34 48 <5.1 NA NA SDO-007 5/23/22 86 6.41 6 <5.1 NA NA SDO-008 5/23/22 27 6.44 1 4 <5.1 NA NA SDO-009 5/23/22' -68 6.40 1 5.0 NA NA SDO-010 5/23/22 -187 6.36 4 <5.0 NA NA I Only applies to facilities that use/process meats. 2 The total precipitation must be recorded using data from an on-site rain gauge. 3 For sampling periods with no discharge at any outfalls.You must still submit this discharge monitoring report with a checkmark here. 4 See General Permit text,Table 3,identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month?K yes E]no (±Les,complete Part B) Part B.Vehicle Maintenance Area Monitoring Results:only for facifitiesm averaging>55 gal of.new-motor oil/month. rease,� W$ Ne*M6iqr.0IIPsqgej ,0000o.',N Sample G Ilected, Oil'an.d-G Indidd/yr 1,091,L Standard`units: ibo ov5fl .6.04 SDO-006 05/23/22 <5.1 94 6.34 SDO-007 05/23/22 <5.1 86 6.41 Only applies to facilities that use/process meats. 2 The total precipitation.must be.recorded using data from an on-site rain gauge. 3 For sampling periods with no discharge at any outfalls,you must still submit this discharge monitoring report with a checkmark here. 4 See General Permit text,Table 3,identifying the especially sensitive receiving water classifications where the more protective benchmark applies. SWU-249 Last Revised:October 1.8,2012 Page I of 2 *FOR PART AAND PART MONITORING RESULTS: * A BENCHMARK EXCEEDAN[E TRIGGERS TIER 1 REQUIREMENTS SEE PERMIT PART U SECTION 8. � 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART U SECTION B. * T|ER3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES nNOIX |F YES,HAVE YOU CONTACTED THE DVV(l REGIONAL OFFICE? YES [] 00n REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all"No Discharge"'reports, within 30 days of receipt of the lab results(or at end of monitoring period in the case of"'No Discharge"reports)to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "| certify, under penalty oflaw, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based onnoy inquiry ofthe person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, complete.to tl� | arnavva*e that there are significant penalties for subrnittinQfalse i r knowing violations." �g4ature (Date) Additional copies of this form may be downloaded at: SWL-249 Last Revised:October 18.2012 Page 2ofZ SEMI-ANNUAL STORMWATER DISCHARGE MONITORING REPORT for North Carolina Division of Water Quality General Permit No. NCGO60000 Date submitted CERTIFICATE OF COVERAGE NO. NCG06 0 1 4 8 SAMPLE COLLECTION YEAR 2022 FACILITY NAME snyders-Lance Incorporated FACILITY ACTIVITIES INCLUDE(check all that apply): COUNTY Mecklenburg ® use/process meats n use animal fats/byproducts PERSON COLLECTING SAMPLES Russell Everett DISCHARGING TO SALTWATERS2 FJYES ®NO LABORATORY PAR Laboratories, Inc. Lab Cent.# © PLEASE REMEMBER TO SIGN ON THE REVERSE -3 Part A:Stormwater Benchmarks and Monitoring Results Total event rainfall 21.48 or No discharge this period' Outfall No. Sample Collected, TSS, pH, COD, Oil and Grease, Fecal Conform , Enterococc9 , mo/dd/yr mg/L Standard units mg/L mg/L Colonies per 100 mI Colonies per 100 ml Benchmatk - 100 or 50 Within 6.0-9.0 120 30 1000 500 DO-011 5/23/22 17 6.45 8 < 5.1 NA NA Only applies to facilities that use/process meats. The total precipitation must be rWorded,vsing data from an on-site rain gauge. s For sampling periods with no discharge at any outfalls.You must still submit this discharge monitoring report with a checkmark here. `'See General Permit text,Table 3,identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month?®yes ❑no (if yes,complete Part 13) Part-B:Vehicle Maintenance Area Monitoring Results:only for facilities averaging>55 gal of new motor oil/month. Outfall No. Sample Collected, OH and Grease, TSS, pH, New Motor Oil Usage, mo/dd/yr mg/L mg/L Standard units Annual average gal/mo Benchmark 30 100 or 50 6.0-9.0 - Only.applies to facilities that use/process meats. `The total precipitation must be recorded using data from an on-site rain gauge. 3 For sampling periods with no discharge at any outfalls,you must still submit this discharge monitoring report with a checkmark here. 4See General Permit text,Table 3,identifying the especially sensitive receiving water classifications where the more protective benchmark applies. SWLI-249 Last Revise&October 18.2012 Page I of 2 *FOR PART`A AND PART 8 MONITORING RESULTS: * A BENCHMARK EXCEEDAN[E TRIGGERS TIER IMEQU|RE04ENTS. SEE PERMIT PART U SECTION B. w 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART U SECTION 8. w T|ER3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL! YES F-1NO Rfl IF YES, HAVE YOU CONTACTED THE DVVO REGIONAL OFFICE? YES F-lNO[—1 REGIONAL OFFICE CONTACT NAME: monitorina period in the case of"No Discharge"reports)to: Division of Water Quality Attn: DWQ Central Files Mail an original and one copy of this DMR, including all"'No Discharge"rfports, within 30 days of receipt of the lab results(or at end of 1617 Mail Service Center Raleigh, NC 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "| certify, under penalty oflaw, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted, Based onnny inquiry ofthe person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is, complete.to t�e best of my knowledge and belief,true, accurate, and | amn aware that there are significant penalties for submitting false i r knowing violations." 3 ( umeofY`enmittee) (Date) Additional copies of this form may bo downloaded at: SWl}-249 1,ast Revised:October |8'Z0|2 SDO-001 NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form,please visit. httl2://portal.ncdenr.org/webZwqZws/su/npdessw#tab-4 Permit No.: N/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.: N/C/G/ 0/6/0/1 /4/8/ Facility Name: Snyder's-Lance Incorporated • County: Mecklenburg Phone No. 704-554-5560 Inspector: Russell Everett (PAR Laboratories, Inc.) Date of Inspection: 05/23/22 Time of Inspection: 15:30 Total Event Precipitation(inches): 0.89 Was this a"Representative Storm Event"or"Measureable Storm Event"as defined by the permit? (See information below.) V Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event"or"measureable storm event"(requirements vary, depending on the permit). ........ Qualitative monitoring requirements vary.rMost permits require qualitative monitoring to be performed during a"representative storm event"or during a"measureable storm event." However, some permits do not have this requirement.'Please refer to these definitions,if applicable. A"representative storm event"is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours(3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A"measurable storm event"is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local^DWQ Regional Office. By th signature,r#.his=reportccurate and complete to the best of my knowledge: (Sig a ure of Permittee or e Page 1 of 2 SWU-242,Last modified 10/25/2012 ,1. Outfall Description: Outfall'No. SD0-001 Structure(pipe,ditch,etc.) Pipe Receiving stream: Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, &material transfers. All processes & manufacturinc occur inside the facility. 2. Color: Describe the color of the discharge using basic colors(red,brown,blue,etc.)and tint (light,medium,dark)as descriptors: Cloudy with a medium brown tint 3. Odor: Describe any distinct odors that the discharge may have(i.e.,smells strongly of oil, weak chlorine odor,etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is clear and 5-is very cloudy: 1 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids: V/ 2 3 4 5 C. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: 1 AV 3 4 5 7. Is there any foam in the stormwater discharge? Yes we 8. Is there an oil sheen in the stormwater discharge? Yes ve 9. Is there evidence of erosion or deposition at the outfall? Yes �y6 10. Other Obvious Indicators of Stormwater Pollution: List and describe, None Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242,Last modified 10/25/2012 SDO-002 RCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form,please visit. http://12ortal.ncdenr.org/web/wq/ws/su/nl2dessw#tab-4 Permit No.: N/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.: N/c/G/0/ 6/0/ 1/4/ 8/ Facility Name: Snyder's Lance Incorporated County: Mecklenburg Phone No. 704-554-5560 Inspector: Russell Everett (PAR Laboratories, Inc.) Date of Inspection: 05/23/22 Time of Inspection: 15:40 Total Event Precipitation (inches): 0.89 Was this a"Representative Storm Event"or"Measureable Storm Event"as defined by the permit? (See information below.) VYes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event"or'measureable storm event"(requirements vary,depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a"representative storm event"or during a"measureable storm event." However, some permits do not have this requirement. Please refer to these definitions,if applicable. A"representative storm event"is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours(3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A"measurable storm event'is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local DWQ Regional Office. .�......_.... . _ ..._... By th signature,Ikcertithat this report is accurate and complete to the best of my knowledge: (Sign4 re of Permittee or ) ee) Pagel of 2 SWU-242,Last modified 10/25/2012 1. Outfall Description: Outfall No. SDO-002 Structure (pipe,ditch,etc.) Pipe Receiving Stream: Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, & material transfers. All processes & manufacturinc occur inside the facility. 2. Color: Describe the color of the discharge using basic colors (red,brown,blue,etc.) and tint (light,medium,dark) as descriptors: Clear with a very light brown tint 3. Odor: Describe any distinct odors that the discharge may have(i.e.,smells strongly of oil, weak chlorine odor,etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is clear and 5 is very cloudy: 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids: 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: V 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes *409 8. Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion or deposition at the outfall? Yes 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Mote: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242;Last modified 10/25/2012 SDO-003 AU�A RCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form,please visit: http//portal.ncdenr.org/web/wq/ws/su/nl2dessw#tab-4 Permit No.: N/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.: Facility Name: Snyder's Lance Incorporated County: Mecklenburg Phone No. 704-5S4-5560 Inspector: Russell Everett (PAR Laboratories, Inc.) Date of Inspection: 05/23/22 Time of Inspection: 1 5:50 Total Event Precipitation (inches): 0.89 Was this a"Representative Storm Event"or"Measureable Storm Event"as defined by the permit? (See information below.) V Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event"or"measureable storm event"(requirements vary, depending on the permit). _.. ......................_ Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a"representative storm event"or during a"measureable storm event." However, ' some permits do not have this requirement. Please refer to these,definitions,if applicable. A"representative storm event'is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours(3 days) in which no storm event measuring greater than r 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A"measurable storm event'is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local.DWQ Regional Office. By is signa r j- ce hat this report is accurate and complete to the best of my knowledge: 1 ( ' ature of Permitteo si Pagel of 2 SWU-242,Last modified 10/25/2012 1. Outfall Description: Outfall No. SDO-003 Structure (pipe,ditch,etc.) Pipe Receiving stream: Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, & material transfers. All processes & manufacturinc occur inside the facility. 2. Color: Describe the color of the discharge using basic colors (red,brown,blue,etc.) and tint (light,medium,dark)as descriptors: Cloudy with a medium brown tint 3. Odor: Describe any distinct odors that the discharge may have(i.e.,smells strongly of oil, weak chlorine odor,etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is clear and 5 is very.cloudy: S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids: 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: 1 *,40 3 4 5 7. Is there any foam in the stormwater discharge? Yes ve 8. Is there an oil sheen in the stormwater discharge? Yes I/ 9. Is there evidence of erosion or deposition at the outfall? Yes 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be indicative.of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242,Last modified 10/25/2012 S DO-004 NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form,please visit. http://portal.ncdenr.org/web/wq/ws/su/nl2dessw#tab-4 Permit No.: N/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.: N/C/G/0/ 6/0/ 1/4/8/ Facility Name: Snyder's Lance Incorporated County: Mecklenburg Phone No. 704-554-5560 Inspector: Fussell Everett (PAR Laboratories, Inc.) Date of Inspection: 05/23/22 Time of Inspection: 16:00 Total Event Precipitation(inches): 0.89 Was this a"Representative Storm Event"or"Measureable Storm Event"as defined by the permit? (See information below.) Yes I] No Please verify whether Qualitative Monitoring must be performed during a "representative storm event"or"measureable storm event"(requirements vary,depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a"representative storm event"or during a"measureable storm event." However, some permits do not have this requirement. Please refer to these definitions,if applicable. A"representative storm event"is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours(3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A"measurable storm event"is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local DWQ Regional Office. B is signature, c tfy that this report is accurate and complete to the best of my knowledge: i ature of Permittee nee) Pagel of 2 SWU-242,Last modified 10/25/2012 1. Outfall Description: Outfall No. SDO-004 Structure (pipe,ditch,etc.) Pipe Receiving stream: Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, & material transfers. All processes & manufacturinc occur inside the facility. 2. Color: Describe the color of the discharge using basic colors(red,brown,blue,etc.)and tint (light,medium,dark)as,descriptors: Clear with a light brown tint 3., Odor: Describe any distinct odors that the discharge may have(i.e.,smells strongly of oil,. weak chlorine odor,etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is clear and 5 is very cloudy: 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids: Vt 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: 2 3 4 5 7. Is there any foam'in the stormwater discharge? Yes 8. Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion or deposition at the outfall? Yes 10 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2. SWU-242,Last modified 10/25/2012 r SDO-005 I . NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form,please visit: •//nortat ncdenr.org/web/wq/ws/su/npdessw#tab-4 Permit No.: N/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.: N/C/G/0/ 6/0/ 1/4/8/ Faci4ty Name: Snyder's Lance Incorporated county: Mecklenburg Phone No. 704-554-55R0 jnspector: Russell Everett (PAR Laboratories, Inc.) Date bf Inspection: 05/23/22 Time of Inspection: 1 7:55 Total Event Precipitation (inches): 0.89 Was this a"Representative Storm Event"or"Measureable Storm Event"as defined by the permit? (See4nformation below.) Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event"or"measureable storm event"(requirements vary,depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a"representative storm event"or during a"measureable storm event." However, some permits do not have this requirement. Please refer to these definitions,if applicable. A"representative storm event'is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than r 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A"measurable storm event'is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local DWQ Regional Office. ....___. . y. a 'a B t is si natur I r.ify' t 's report is accurate and complete to the best of my knowledge: ( ' n�ture of . rmittee or D ig ee Pagel of 2 SWU-242,Last modified 10/25/2012 1. Outfall Description: Outfall No. SDO-005 Structure (pipe,ditch,etc.) Pipe Receiving Stream: Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area:- Employee parking, truck parking, loading/unloading, & material transfers. All processes & manufacturinc occur inside the facility. 2. Color: Describe the color of the discharge using basic colors(red,brown,blue,etc.)and tint (light,medium,dark)as descriptors: Clear with a light brown tint 3. Odor: Describe any distinct odors that the discharge may have(i.e.,smells strongly of oil, weak chlorine odor,etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is clear and 5 is very cloudy: 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwatef discharge,where 1 is no solids and 5 is the surface covered with floating solids: 2 3 4 5 C. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: 2 3 4 5 7.1 Is there any foam in the stormwater discharge? Yes B. Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion or deposition at the outfall? Yes fib 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242,Last modified 10/25/2012 S DO-006 RCDEN Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form,please visit: hUp:,/,Iportal.ncdenr.org/weblwq/ws/su/npdessw#tab-4 Permit No.: N/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.: N/C/G/0/ 6/0/ 1/4/8/ Facility Name: Snyder's Lance Incorporated County: Mecklenburg Phone No. 704-554-5560 Inspector:. Russell Everett (PAR Laboratories, Inc.) Date of Inspection: 05/23/22 Time of Inspection: 17:40 Total Event Precipitation(inches): 0.89 Was this a"Representative Storm Event"or"Measureable Storm Event"as defined by the permit? (See information below.) S�Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event"or"measureable storm event"(requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a"representative storm event"or during a"measureable storm event." However, some permits do not have this requirement. Please refer to these definitions,if applicable. A"representative storm event'is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours(3 days) in which no storm event measuring greater than r 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A"measurable storm event'is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local DWQ Regional Office. i B his signat. e,I if that this report is accurate and complete to the best of my knowledge: E ig ature of Permittee ignee) Pagel of 2 SWU-242,Last modified 10/25/2012 1. Outfall Description: Outfall No. SDO-006 Structure (pipe,ditch,etc.) Pipe Receiving stream: Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, & material transfers. All processes & manufacturinc occur inside the facility. 2. Color: Describe the color of the discharge using basic colors (red,brown,blue,etc.)and tint (light,medium,dark)as descriptors: Cloudy with a light brown tint 3. Odor: Describe any distinct odors that the discharge may have (i.e.,smells strongly of oil, weak chlorine odor,etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is clear and 5 is very cloudy: 1 3 4 .5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids: V 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: 1 3 4 5 7. Is there any foam in the stormwater discharge? Yes Ve 0. Is there an oil sheen in the stormwater discharge? Yes 46 9. Is there evidence of erosion or deposition at the outfall? Yes 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242,Last modified 10/25/2012 SDO-007 K.*A'r RCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form,please visit. http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 Permit No.: N/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.: N/C/G/0/ 6/0/ 1/4/ 8/ Facility Name: Snyder's Lance Incorporated County: Mecklenburg Phone No. 704-554-5560 Inspector: Russell Everett (PAR Laboratories, Inc.) Date of Inspection: 05/23/22 Time of Inspection: 17:30 Total Event Precipitation (inches): 0.89 Was this a"Representative Storm Event"or"Measureable Storm Event"as defined by the permit? (See information below.) Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event"or"measureable storm event"(requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a"representative storm event"or during a"measureable storm event." However, some permits do not have this requirement. Please refer to these definitions,if applicable. A"representative storm event"is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A"measurable storm event'is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local DWQ Regional Office. By i signatu a 's report and complete to the best of my knowledge: j� ,1. (Siena, re of Per ittee or De ' Pagel of 2 SWU-242,Last modified 10/2S/2012 1. Outfall Description: Outfall No. SDO-007 Structure(pipe,ditch,etc.) Pipe Receiving Stream: Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, & material transfers. All processes & manufacturinc occur inside the facility. 2. Color: Describe the color of the discharge using basic colors (red,brown,blue,etc.) and tint (light,medium,dark) as descriptors: Clear with a light brown tint 3. Odor: Describe any distinct odors that the discharge may have (i.e.,smells strongly of oil, weak chlorine odor,etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is clear and 5 is very cloudy: 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids: Ne 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: 1 ti� 3 4 5 7. Is there any foam in the stormwater discharge? Yes 0. Is there an oil sheen in the stormwater discharge? Yes l� 9. Is there evidence of erosion or deposition at the outfall? Yes 1� 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242,Last modified 10/25/2012 SDO-008 ARA NCDENK Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form,please visit. http://12ortal.ncdenr.org/web/wq/ws/su/n_pdessw#tab-4 Permit No.: N/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.: N/C/G/0/ 6/O/ 1/4/8/ Facility Name: Snyder's Lance Incorporated County: Mecklenburg Phone No. 704-554-.1i560 Inspector: Russell Everett (PAR Laboratories, Inc.) Date of Inspection: 05/23/22 Time of Inspection: 17:25 Total Event Precipitation(inches): 0.89 Was this a"Representative Storm Event"or"Measureable Storm Event"as defined by the permit? (See information below.) Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event"or"measureable storm event"(requirements vary,depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a"representative storm event"or during a"measureable storm event." However, some permits do not have this requirement. Please refer to these definitions,if applicable. A"representative storm event"is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours(3 days) in which no storm event measuring greater than ► 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A"measurable storm event'is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local DWQ Regional Office. By LsignaturItthalthis report is accurate and complete to the best of my knowledge: (Signature of Permittee or e) Pagel of 2 SWU-242,Last modified 10/25/2012 1. Outfall Description: Outfall No. SDO-008 Structure(pipe,ditch,etc.).., Pipe Receiving stream: Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, & material transfers. All processes & manufacturinc occur inside the facility. 2. Color: Describe the color of the discharge using basic colors (red,brown,blue,etc.) and tint (light,medium,dark) as descriptors: Clear with a very light brown tint 3. Odor: Describe any distinct odors that the discharge may have (i.e.,smells strongly of oil, weak chlorine odor,etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is clear and 5 is very cloudy: - V/ 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids: 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy- 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes 8. Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion or deposition at t) e outfall? Yes >/ 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242,Last modified 10/25/2012 SDO-009 NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form,please visit. http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 Permit No.: N/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.: N/C/G/0/ 6/0/ 1/4/8/ Facility Name: Snyder's Lance Incorporated County: Mecklenburg Phone No. 704-554-55Fi0 Inspector: Russell Everett (PAR Laboratories, Inc.) Date of Inspection: 05/23/22 Time of Inspection: 17:15 Total Event Precipitation (inches): 0.89 Was this a"Representative Storm Event"or"Measureable Storm Event"as defined by the permit? (See information below.) gYes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event"or"measureable storm event"(requirements vary,depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a"representative storm event"or during a"measureable storm event." However, some permits do not have this requirement. Please refer to these definitions,if applicable. A"representative storm event'is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours(3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A"measurable storm event'is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local DWQ Regional Office. B his sig a I fy that this report is accurate and complete to the best of my knowledge: ( 'gn ture of Permitte or Designee) Pagel of 2 SWU-242,Last modified 10/25/2012 1. Outfall Description: Outfall No. SDO-009 Structure (pipe,ditch,etc.) Pipe Receiving stream: Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, & material transfers. All processes & manufacturing occur inside the facility. 2. Color: Describe the color of the discharge using basic colors (red,brown,blue,etc.) and tint (light,medium,dark)as descriptors: Clear with a very light brown tint 3. Odor: Describe any distinct odors that the discharge may have(i.e.;smells strongly of oil, weak chlorine odor,etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is clear and 5 is very cloudy: V 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids: V 2 3 4 5 C. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: V 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes ve 8. Is there an oil sheen in the stormwater discharge? Yes V 9. Is there evidence of erosion or deposition at the outfall? Yes N/ 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242,Last modified 10/25/2012 SDO-010 rN NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form,please visit. http://12ortal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 Permit No.: N/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.: N/C/G/0/ 6/O/ 1/4/ 8/ Facility Name: Snyder's Lance Incorporated County: Mecklenburg Phone No. 704-554-55SO Inspector: Russell Everett (PAR Laboratories, Inc.) Date of Inspection: 05/23/22 Time of Inspection: 17:00 Total Event Precipitation (inches): 0.89 Was this a"Representative Storm Event"or"Measureable Storm Event"as defined by the permit? (See information below.) g Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event"or",neasureable storm Pvent"(requirements vary,depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a"representative storm event"or during a"measureable storm event." However, some permits do not have this requirement. Please refer to these definitions,if applicable. A"representative storm event'is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours(3 days) in which no storm event measuring greater than r 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A"measurable storm event'is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local DWQ Regional Office. By is ign r I ertify that this report is accurate and complete to the best of my knowledge: (S nature of Per i e r Designee) Pagel of 2 SW J-242,Last modified 10/25/2012 r 1. Outfall Description: Outfall No. SDO-010 Structure (pipe,ditch,etc.) Pipe Receiving stream: . Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, & material transfers. All processes & manufacturing occur inside the facility. 2. Color: Describe the color of the discharge using basic colors(red,brown,blue,etc.)and tint (light,medium,dark)as descriptors: Cloudy with a very light brown tint 3. Odor: Describe any distinct odors that the discharge may have(i.e.,smells strongly of oil, weak chlorine odor,etc.): None 4: Clarity: Choose the number which best describes the clarity of the discharge,where 1 is clear and 5 is very cloudy: 2 3 4 5 S. . Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids: 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes we 8. Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion or deposition at the outfall? Yes 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242,Last modified 10/25/2012 SDO-011 AAA NCQENR Stormwater Discharge Outfall (SDO) .Qualitative Monitoring Report Forguidance on filling out:this form,please visit: http:////partal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 Permit No.: N/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.: N/C/G/0/ 6/ Facility Name: Snyder's Lance Incorporated County: Mecklenburg Phone No. 704-554-5560 Inspector: Russell Everett (PAR Laboratories, Inc.) Date of Inspection: 05/23/22 Time of.Inspection: 1 6:40 Total Event Precipitation (inches): 0.89 Was this a"Representative Storm Event"or"Measureable Storm Event"as defined by the permit? (See information below.) Yes ❑ No Xlease verify,whether Qualitative Monitoring must be performed during a "representative storm event"or"measureable storm event"(requirements vary,depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a"representative storm event"or during a"measureable storm event." However, some permits do not have this requirement. Please refer to these definitions,if applicable. A"representative storm event"is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours(3 days) in which no storm event measuring greater than r 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. r A"measurable storm event"is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local DWQ Regional Office. B t is signatur I kiktt at this report is accurate and complete to the best of my knowledge: ---__ Signature of Permittee or e Pagel of 2 SWU-242,Last modified 10/25/2012 1. Outfall Description: Outfall No. SDO-011 Structure(pipe,ditch,etc.) Pipe Receiving Stream: Kings Branch in the Catawba River Basin Describe the industrial activities that occur within the outfall drainage area: Employee parking, truck parking, loading/unloading, & material transfers. All processes &.manufacturinc occur inside the facility. 2. Color: Describe the color of the discharge using basic colors(red,brown,blue,etc.)and tint (light,medium,dark)as descriptors: Clear 3. Odor: Describe any distinct odors that the discharge may have(i.e.,smells strongly of oil, weak chlorine odor,etc.): None 4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is clear and 5 is very cloudy: _l 7 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids: V� 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: Vt 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes Ve 8. Is there an oil sheen in the stormwater discharge? Yes l� 9. Is there evidence of erosion or deposition at the outfall? Yes 10. Other Obvious Indicators of Stormwater Pollution: List and describe None Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242,Last modified 10/25/2012