Loading...
HomeMy WebLinkAbout20141319 Ver 1_Buffer Determination Request_20141222RECEIVEDMCDENR/DWR -D-E- R p�olit� % ?lina Department of Environment and Natural Resources L Division of Water Qualit Pat McCrory Thomas A. Reeder y Governor Water �� John E. Skvada, III operations Regi Director Secretary Wailhington DWO Use Only: Project # Stream Origin /Buffer Applicability Determination Required Information 1. Owner Information (corporation/individual who is legally responsible for the property and its compliance) 1a. Name(s) on Recorded Deed See attached. 1b. Responsible Party (for LLC) 9001 Glenwood Avenue Raleigh, NC 27617 1c. Mailing Address Be. Name of project td. Telephone Number 5b. County Wayne 1e. Email Address Spring Lake and Lake Wackena 2. Location of Project Site - please include the county, nearest named town and highway number: 5538 US HWY 70 in Goldsboro, We a Coun , North Carolina 3. Has anyone from DWO visited the site? Y / N Staff Name Date of Visit? Additional Requested Information 4. Agent/Consultant Information (f applicable) 4a. Name, Company Cory Darnell, Engineering Consulting Services 4b. Mailing address 9001 Glenwood Avenue Raleigh, NC 27617 4c. Telephone no. 919.861.9910 4d. Email address cdamell @ecslimited com 5. Project and Site Information Be. Name of project Popular Farm 5b. County Wayne 5c. Nearest Named Stream Spring Lake and Lake Wackena 5d. River Basin Nauss Be. Provide a brief description of this project (attach site plan if available): Proposed solar array fans. Please attach a map of the site indicating project boundaries on the USGS 1:24,000 Topo and/or NRCS Soil Survey. If ou are unable to locate either of these ma a lease contact the Re tonal Office for assistance. DWQ Use Only: Is this stream call for the purpose of: _ buffer mitigation _ nutrient offset credit Please return form to: Anthony Scarbraugh 943 Washington Square Mall Washington, NC 27889 Note: Submittals on Friday after 12:00 pm will be stamped as received on the Fax: (252) 946 -9215 next business day. Email: anthonv.scarbrauah @ncdenraov Please contact Anthony Scarbraugh at (252) 946 -6481 if you have any questions. T- �cl I This form aut arises ECS to act as Our agent In stream/weliand matters including U.S. Army Corps of Engineers and North Carolina Division of Water Resources field verification and permit application. Property Address: Owner Information: Name: 1(Al --,z I Address: k e �_ Telephone Number. �/ (G/ — cJ ZZ— --f -d Fax Number: Signature: \ ( ( V , . . 0 / t 1, r]nrn• el / ) � ?d 1W i Com 1 >1 7-**4Yt* ch N • 34.0 r S0 j r -a = 2,OW , LEGEND % j 1 •r Approximate Location of Site Boundary a 0 •I - -"'--' 1 FIGURE 1 United States Geological Survey SITE LOCATION MAP 7.5 - Minute Series Topographic Map: Poplar Solar, LLC La Grange, NC Quadrangle; Created: 1983 5538 US Highway 70 East Southeast Goldsboro, NC Quadrangle; _ _ ___ Goldsboro, Wayne County, NC Created: 2001 Contour Interval = 10 feet _ _ _ _ ECS Project #: 06: 22161 LEGEND Approximate Site Boundary aJ SOURCE: FEMA FIRM North Carolina Floodplain Mapping Program Website Panel: 37203537001; Dated: 12 -2 -2005 Panel: 37203547001; Dated: 12 -2 -2005 Not to Scale' �t FIGURE 4 FEMA FIRM MAP Poplar Solar, LLC 5538 US Highway 70 East Goldsboro, Wayne County, NC ECS Project #: 06: 22161 THE STREAMIWETLAND LOCATIONS SHOWN ON THIS MAP ARE APPROXIMATE. THEY HAVE BEEN DELINEATED BY ECS ON 11/17/2014. THEY HAVE NOT BEEN VERIFIED BY THE USACE OR NCDWR. THEY HAVE NOT BEEN SURVEYED. THIS MAP IS FOR PRELIMINARY PLANNING PURPOSES. JURISDICTIONAL AREAS ARE SUBJECT TO AGENCY VERIFICATION. A 50'-0 STATE BUFFER IS REQUIRED FOR FEATURES LOCATED W THE NEUSE RIVER BASIN. LEGEND ^� Approximate Location of Site Boundary Approximate Location of Perennial Stream 0 Approximate Location of Wetland — — Approximate Location of Jurisdictional Feature Approximate Location of Culvert DP -1 C) Approximate Location of Data Point 4� Approximate Location of 50' State Buffer State Buffer Requirements: 50'-0 Watershed Classification = Class C; NSW Watershed = Neuse River Basin Nearest Water Body = Spring Lake & Lake Wackena Local Buffer Requirements: None d DP -1 SOURCE: Wayne County GIS 2013 Aerial Photograph and ECS Field Notes Not to Scale' FLAG NUMBER /INFO WETLAND /JURISDICTIONAL TRIBUTARY FLAGS= Wetland Bounds STREAWPOND FLAGS = Stream Flags = 0 Pond Flags = 0 Wetland Flags = 0 Total Flags = 0 Off-site Wetlands Not Flagged i z, t FIGURE 5 WETLAND/STREAM FLAGGING LOCATION MAP Poplar Solar, LLC 5538 US Highway 70 East Goldsboro, Wayne County, NC