Loading...
HomeMy WebLinkAboutSW1221101_Supplement-EZ Form_20221110SUPPLEMENT-EZ COVER PAGE LOAD SUPPLEMENT FORMS PROJECT INFORMATION 1 Project Name JONAS RIDGE CONVENIENCE CENTER AND PARK PRASE 1 2 Project Area ac _ 25.11 3 Coastal Wetland Area ac 4 ISurface Water Area fact 0.29 Does this project use an off -site :OMPLIANCE WITH 02H .1003(4) _7_ Width of vegetated se�rovided (feet} 30 8 Will the vegetated setback remainvegetated? Yes 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c d ? NIA 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMS: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 1 15 Permeable Pavement 16 ISand Filter 17 Rainwater Harvesting RWH IS Green Roof 19 Level Spreader -Filter Strip LS-FS 20 Disconnected Impervious Surface DIS 21 Treatment Swale 22 Dry Pond 23 StormFllter 24 Silva Cell 25 Bayfilter 26 Filterra LOAD SUPPLEMENT FORMS DESIGNER CERTIFICATION _ 27 Name and Title: David Tu Environmental Certification Statement; I certify, under penalty of law that this Supplement-EZ form and all supponing information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are wnsislent with the information provided here. C.A.Ro 04..�Rsiliscgp Tlr 1542 m Signature of to Zo 1-2- Date DRAINAGE AREAS 1 Is this a hicih density project? Yes 2 If so, number of drainage areaslSGMs 1 3 Does this project have low densi areas? No 4 If so, number of tow density drainage areas D 5 Is aillpart of this project subject to previous rule versions? No CLICK TO LOAD FORM