Loading...
HomeMy WebLinkAbout20221369 Ver 1_USACE Permit_20221104CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. <mailto:report.spam@nc.gov> All, This is a provisional notification that your proposed work may be authorized by the above referenced general permit provided a 401 Certification is issued or waived. Once a 401 Certification is issued or waived, the Corps will provide you with a final general permit verification. Your proposed work shall not commence until after the 401 Certification has been issued or waived and until a final general permit verification has been provided to you. Additional special conditions may be added to the final general permit verification, including the following: 1. Enhanced erosion and sediment control measures (double silt fence and double stone outlets) must be installed at all crossings, due to their relatively close proximity to occupied habitat for Roanoke logperch. 2. Temporary discharge of excavated or fill material into streams will be for the absolute minimum period of time necessary to accomplish the work, and such authorized crossings will be constructed, restored, and seeded per details on Drawing Numbers D9 and D10. 3. Aside from the stream crossings specifically authorized as described above, and shown on Drawing Numbers 14-C1, 15-C2, 15-C4, 15-C8, no additional impacts to wetlands, streams, and other potential waters of the US are authorized for the City of Eden Phase 14 and 15 – Junction Street Basin Sewer Replacement and Rehabilitation project and Smith River Siphon Replacement project. As stated above, this is a provisional notification. This email does NOT provide Department of the Army (DA) authorization. You are cautioned that commencement of the proposed activity(ies) requested prior to receiving a written DA authorization would constitute a violation of Federal laws and subject you to further enforcement action. Receipt of a permit from the state (e.g., NCDWR) does not preclude the requirement for obtaining DA authorization (e.g., an NWP verification letter) prior to commencing the work. It appears that an Individual 401 Water Quality Certification (WQC) is required from the North Carolina Division of Water Resources (NCDWR) for this project. For NCDWR: After review of the submitted PCN for the above referenced project, and NWP 58 Water Quality General Certification No. 4276, dated 12/18/2020 (https://saw-reg.usace.army.mil/NWP2021/NWP58 _StateWQC.pdf <https://urldefense.com/v3/__https://saw-reg.usace.army.mil/NWP2021/NWP58_StateWQC.pdf__;!!HYmSToo!c_v5nPlR5Tjxn3eSO0Fn7vhqs3_JM1KTLwAxjMAqj_Lr8IHbTQNeEyrZlWcuJ8D31fg7-AKWwO6cNucNyDgvMK V_9chjw22hx_MpLQ$> ), it appears an Individual 401 Water Quality Certification (WQC) is required from the NCDWR for the proposed activities. The PCN received by our office provided the 9 required elements for an individual WQC and constitutes the Corps initial receipt of the WQC application. The reasonable period of time (RPOT) for you to act on this WQC request will begin is 120 calendar days from the date of the complete WQC request. Unless NCDWR is granted a time review extension, the date upon which a waiver of the WQC will occur if you do not act on the certification is 1/31/2023. Please contact me if you have any questions regarding this provisional verification or the Corps of Engineers regulatory program. Sincerely, Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: (919) 817-2436 Email: David.E.Bailey2@usace.army.mil <mailto:David.E.Bailey2@usace.army.mil> We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ <https://urldefense.com/v3/__https://regulatory.ops.usace.army.mil/customer-service-survey/__;!!HYmSToo!c_v5nPlR5Tjxn3eSO0Fn7vhqs3_JM1KTLwAxjMAqj_Lr8IHbTQNeEyrZlWcuJ8D31fg7-AKWwO6cNucNyDgvMKV_9chjw2 0NncbFgg$> Thank you for taking the time to visit this site and complete the survey. From: RaleighNCREG <RaleighNCREG@usace.army.mil> Sent: Thursday, October 6, 2022 10:17 AM To: dzurlo@wkdickson.com Cc: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Subject: SAW-2019-01088 (City of Eden / Junction Basin sewer remediation / Smith River Siphon / Rockingham County / municipal) Good morning, We have received your Pre-Construction Notification (PCN) NWP request for the above project and forwarded it to Dave Bailey for further processing. Thank you, Josephine Schaffer From: laserfiche@ncdenr.gov <mailto:laserfiche@ncdenr.gov> <laserfiche@ncdenr.gov <mailto:laserfiche@ncdenr.gov> > Sent: Monday, October 3, 2022 5:26 PM To: RaleighNCREG <RaleighNCREG@usace.army.mil <mailto:RaleighNCREG@usace.army.mil> > Cc: SAW-PCN-RG <SAW-PCN-RG@usace.army.mil <mailto:SAW-PCN-RG@usace.army.mil> > Subject: [Non-DoD Source] PCN - Rockingham - Non-DOT A new project has been received on 10/3/2022 5:23 PM for City of Eden Sewer Replacement and Rehabilitation Project Phase 14 - Junction Street Basin Replacement and Rehabilitation & Phase 15 - Smith River Siphon Rehabilitation and Siphon Replacement - Resubmittal. The link below will take you to the project folder. https://edocs.deq.nc.gov/Laserfiche/index.aspx?db=WaterResources#id=2518206;view=browse This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren’t monitored. Please contact me if you have any questions regarding this provisional verification or the Corps of Engineers regulatory program. Sincerely, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: (919) 817-2436 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. From: RaleighNCREG <RaleighNCREG@usace.army.mil> Sent: Thursday, October 6, 2022 10:17 AM To: dzurlo@wkdickson.com Cc: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil> Subject: SAW-2019-01088 (City of Eden / Junction Basin sewer remediation / Smith River Siphon / Rockingham County / municipal) Good morning, We have received your Pre -Construction Notification (PCN) NWP request for the above project and forwarded it to Dave Bailey for further processing. Thank you, Josephine Schaffer From: laserfiche@ncdenr.gov <laserfiche@ncdenr.gov> Sent: Monday, October 3, 2022 5:26 PM To: RaleighNCREG <RaleighNCREG@usace.army.mil> Cc: SAW-PCN-RG <SAW-PCN-RG@usace.army.mil> Subject: [Non-DoD Source] PCN - Rockingham - Non -DOT A new project has been received on 10/3/2022 5:23 PM for City of Eden Sewer Replacement and Rehabilitation Project Phase 14 -Junction Street Basin Replacement and Rehabilitation & Phase 15 - Smith River Siphon Rehabilitation and Siphon Replacement - Resubmittal. The link below will take you to the project folder. https://edocs.deq.nc.gov/Laserfiche/index.aspx?db=WaterResources#id=2518206;view=browse This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren't monitored. 2