Loading...
HomeMy WebLinkAbout20160393 Ver 1_Year 5 - Credit Release Request Form_20221109  3600 Glenwood Avenue, Suite 100 Raleigh, NC 27612 Corporate Headquarters 6575 West Loop South, Suite 300 Bellaire, TX 77401 Main: 713.520.5400   November 9, 2022 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Ryan Medric (rmedric@res.us, 703.424.6313) Through: EBX-EM, LLC We formally request a credit release for the Maple View Farm Nutrient Offset Bank (DWR Project #2016-0393) for completion of Task #7: Monitoring Report #4 and Task #8: Monitoring Report #5 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Task #7 and 8 and are pending review: 1. Year 4 Monitoring Report, Year 5 Monitoring Report 2. Credit Release Schedule (PDF from UMBI), and 3. Approved Credit Table (PDF from MY5 Report) Credits requested for release are detailed below: Credit Type % Release Credit Amount (include Units) Notes/Comments Buffer Restoration Buffer Preservation Buffer Enhancement Generated Nitrogen Nutrient Offset 15 1,260.38 lb-N -0.10 acres from changes to the easement Delivered Nitrogen Nutrient Offset (Jordan sites only) 15 1,121.74 lb-N -193 lb-N from changes to the easement Generated Phosphorus Nutrient Offset 15 83.73 lb-P -0.10 acres from changes to the easement Delivered Phosphorus Nutrient Offset (Jordan sites only) 15 59.45 lb-P -10 lb-P from changes to the easement Signature:   3600 Glenwood Avenue, Suite 100 Raleigh, NC 27612 Corporate Headquarters 6575 West Loop South, Suite 300 Bellaire, TX 77401 Main: 713.520.5400     3600 Glenwood Avenue, Suite 100 Raleigh, NC 27612 Corporate Headquarters 6575 West Loop South, Suite 300 Bellaire, TX 77401 Main: 713.520.5400   As-Built Delivered Credits 8,765 463 MY5 Delivered Credits 8,572 453 Credit Release # % Nitrogen Phosphorus Release Date 1A Modified BPDP Approved by DWR, Conservation Easement Approved by DWR Recorded, Mitigation Site Earthwork completed, Planting and Installation of Monitoring Devices Completed, Monitoring Financial Assurance Posted 3,067.750 162.050 4/24/2017 1B Modified BPDP Approved by DWR, Conservation Easement Approved by DWR Recorded, Mitigation Site Earthwork completed, Planting and Installation of Monitoring Devices Completed, Monitoring Financial Assurance Posted 438.250 23.150 5/19/2017 2 Approval of As-Built Report 10% 876.510 46.300 6/26/2017 3 Monitoring Report #1: Approved by DWR 10% 876.500 46.300 1/16/2018 4A Monitoring Report #2: Approved by DWR 438.250 23.150 10/12/2018 4B Monitoring Report #2: Approved by DWR 438.250 23.150 6/3/2019 5 Monitoring Report #3: Approved by DWR 10% 876.500 46.300 1/27/2020 6 Items J (2a) of Section VI in the UMBI has been completed and approved by DWR 5% 438.250 23.150 4/24/2017 7 Monitoring Report #4: Approved by DWR 5% 428.600 22.650 8 Monitoring Report #5: Approved by DWR and final site visit by DWR has been conducted 10% 693.140 36.800 7,450.260 393.550 Credits Released to Date Nutrient Credit Release Schedule Maple View (DWR Project #2016-0393v1) 40% 10%