Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0035207_Regional Office Physical File Scan Up To 11/8/2022
SPILL RESPONSE PLAN PROJECT: SYNAGRO CENTRAL Permit WQ0035207 IN THE UNLIKELY EVENT OF A SPILL, THE FOLLOWING ACTIONS SHALL BE TAKEN IMMEDIATELY: 1. MANAGEMENT OF SPILL CLEAN-UP ACTIVITIES: The Operations Manager shall take immediate charge and initiate clean-up activities. Synagro labor and equipment is to be utilized. In the event additional labor and equipment is required, assistance may be requested from the Town of Franklin, the NC Department of Transportation, and other private contractors as necessary. . 2. HALT THE SOURCE OF THE SPILL: Such as a ruptured container or damaged transport unit. 3. CONTAIN THE SPILL: Form a barrier. Sufficient quantities of straw shall be used for such purposes. Earthen barriers may be constructed to augment the straw bale containment area of the spill. The Operations Manager or the person in charge on the spill site will advise the clean-up personnel where to get the straw, lime, and other items necessary to complete the clean-up operation, i.e., local farmers, farm supply centers, nurseries, etc. 4. CLEAN-UP: Employ front-end loaders, vacuum equipment, sludge application vehicles, and/or local septic tank service to remove as much of the spilled material as possible. Straw and/or sand should be scattered in the spill area to soak up the remaining material. The straw- and sand -soaked material will be collected and removed to a disposal area approved by representatives of the state regulatory agency. 5. FINAL CLEAN-UP: Employ rotary brush sweeper if needed, and apply lime to the spill area upon the approval of the clean-up efforts by the state regulatory representative. If the event occurs on private property, the clean-up will be completed to the satisfaction of the property owner and state regulatory representatives. The ultimate goal will be to restore the spill area to its original condition if possible. 6. NOTIFICATION: As soon as possible after the spill occurs, the Synagro Operations Manager or assistant will notify the Synagro Central office, and they will then be responsible for notifying other key Synagro personnel. 7. REPORTING: Synagro Central personnel will notify the Asheville regional office of the NCDENR by telephone (828-296-4500) as soon as possible, but not more than 24 hours after, or on the next working day following the occurrence. The Operations Manager shall provide a written report within 48 hours of the spill to the Technical Services Director. The report shall list all relative information and actions taken. Synagro Central personnel will file a written report to the Asheville Regional office of the NCDENR within 5 days of the occurrence. For after hours reporting the Division's emergency number shall be called to report all incidences (800-662-7956 or 800-858-0368 or 919-733-3300) OPERATIONS AND MAINTENANCE PLAN _ SYNAGRO RESIDUALS LAND APPLICATION FOR 1NQ0035207.(Synagro Central)` Inspection Plan Inspections for the land application of residuals will be conducted on a weekly basis at the land application site during the land application activities of this project. The inspection frequency is based on the time frame that it is going to take to complete the project and the amount of dry tons to be land applied from this facility. The inspections will consist of inspecting a current field that is being applied as well as inspecting random fields that have been completed. These inspections will consist of: 1. Verifying that the Pre -Operations Check List has been completed and signed by both Operations and Technical staff. 2. Checking the calculated loads to insure the correct amount of residuals are being land applied. 3. Insure that all manned equipment has a copy of the spill control plan, the permit, and the operations and maintenance plan. 4. Insure that the field has been flagged properly and that all buffers are being adhered to. 5. Insure that the Crop and Landowner Verification form has been filled out. 6. Verifying that the correct number samples of the residuals have been taken and that it meets the criteria for land application. 7. The records will be kept in the project files in the respective office for the project. _ S. The Permittee or Inspector shall report by telephone to the Asheville Regional Office by_telephone atg1328 296=4500 as soon as possible but no later than 24 hours after or the next working day following the occurrence or the first knowledge of the occurrence of the following. • Any occurrence with the distribution program resulting in the land application of significant amounts of material that is abnormal in quantity or characteristics. • Any failure of the distribution system that results in the release to surface waters. • Any time that self -monitoring indicates that the facility has gone out of compliance with the permit. • Any process failure that results in the system not adequately treating the residuals. • Any spill or discharge from a vehicle or piping system during residuals transportation. • Any release that requires immediate reporting outside of normal business hours shall be called in to DENR at 1- 800-662-7956,1-800-858-0368, or 1-919-733-3300. These numbers are to be called in the event of a release to surface waters, imminent failure of a storage system when the event occurs outside of normal business hours. • Within 5 days of the first notice of on occurrence a written response in the form of a letter shall be sent to DENR outlining the actions taken or purposed actions taken to ensure that the problem does not recur. Persons _ responsible for inspections on this project are as follows: Marshall,Puryear Technical_ Services Director ot�his designee Marshall Puryear is the designated land application ORC for this project and his designees are the backup ORC's for this project. OPERATIONS AND MAINTENANCE PLAN SYNAGRO RESIDUALS LAND APPLICATION FOR WQ0035207 Sampling Plan Sampling for this project consists of sampling the residuals during the time that land application is occurring. This will result in one round of sampling to occur before land application commences in order to insure that the residuals are suitable for land application. Based on the dry tonnage of this plant this will be one sample for all parameters per year. The residuals shall be sampled annually for the following: (Regulatory level in milligrams per liter in parentheses.) Arsenic (5.0) 1, 4-Dichlorobenzene (7.5) Nitrobenzene (2.0) Barium (100.0) 1, 2-Dichloroethane (0.5) Pentachlorophenol (100.0) Benzene (0.5) 1, 1-Dichloroethylene (0.7) Pyridine (5.0) Cadmium (1.0) 2, 4-Dinitrotoluene (0.13) Selenium (1.0) Carbon tetrachloride (0.5) Endrin (0.02) Silver (5.0) Chlordane (0.03) Hexachlorobenzene (0.13 Tetrachloroethylene (0.7) Chlorobenzene (100.0) Heptachlor (and its hydroxide) (0.008) Toxaphene (0.5) Chloroform (6.0) Hexachloro-1,3-butadiene (0.5) Trichloroethylene (0.5) Chromium (5.0) Hexachlorethane (3.0) 2,4,5-Trichlorophenol (400.0) M-Cresol (200.0) Lead (5.0) 2,4,6-Trichlorophenol (2.0) o-Cresol (200.0) Lindane (0.4) 2,4,5 TP (Silvex) (1.0) p-Cresol (200.0) Mercury (0.2) Vinyl Chloride (0.2) Cresol (200.0) Methoxychlor (10.0) 2,4-D (10.0) Methyl ethyl ketone (200.0) The residuals will also be sampled based on the chart below for the following constituents Dry Tons Generated (short tons per year) Monitoring Frequency (Established in 40 CFR 503 and 15A NCAC 02T.1111) <319 1 time per year =>319-<1,650 1 per Quarter (4 times per year) =>1,650-<16,500 1 every 60 days (6 times per year) =>16,500 1 every month (12 times per year) Aluminum Ammonia -Nitrogen Arsenic Cadmium Calcium Copper Lead Sodium Adsorption Ratio (SAR) Magnesium Mercury Molybdenum Nickel Nitrate -Nitrite Nitrogen Phosphorous Potassium pH Plant Available Nitrogen (calculation) Selenium Sodium Total Solids Total Kjeldahl Nitrogen Zinc In order to meet pathogen and vector requirements the material will be sampled for fecals to prove that the residuals have met the pathogen requirements of the permit. There are no vector requirements for this source since it is water treatment plant, residuals with no domestic waste water contribution to them nor will they be mixed with any other residuals.:The samples will be pulled from the lagoons that are currently holding the residuals. The samples that will be pulled are a TCLP, nutrient and metals sample and a fecal sample to prove that the material is suitable for land application. The nutrient and metal and TCLP sample will be collected randomly and consist of at least 30 individual samples mixed together in order to`get the composite sample for these parameters. This material is very consistent based on the fact that it is residuals from the treatment of drinking water so there should not be any seasonal fluctuations in these residuals. The following people are responsible for sampling: ,Marshall Puryear Technical Services Director or his designee. OPERATIONS AND MAINTENANCE PLAN SYNAGRO RESIDUALS LAND APPLICATION FOR WQ0035207 (S_ynagro Central) Operational Functions The operation function of this project is going to involve mixing the lagoon up with a tractor powered Houle pump to achieve a well mixed and consistent material that is suitable for land application. It is going to be spread at agronomic rates that are determined by the nutrient and metal sample that is current for that monitoring period. It is going to be spread with a liquid applicator that will use pressure to spread the material in such a way to achieve a consistent spread pattern. The material is going to be land applied on fields that have grass growing on them that are going to either be grazed or cut for hay for animal feed. SAFETY MEASURES Synagro believes in operating in a safety conscious manner and is has all employees participate in quarterly online safety course that are designed to help its employees recognize safety issues and take steps to prevent accidents from occurring. In addition all Synagro employees have the authority to stop operations if they think any aspect of the operation is going to cause environmental or personal harm. Maintenance Schedule Synagro will follow the maintenance schedule as recommended by the Synagro fleet manager for the equipment necessary to complete the job. I-!,?- CIR RYPA-I;,q fi-Irria nnmz� inrigant Permittee* Permit No., W Facilit y: Co C m/Zq. imadent Ended -Date.- Tftne- %j ls�; incid�entStarted�Date.,,�.,f;-f!7-�,/�S�-Tirne: A � __ �I (A Estimated Volume- � QC Reach Surface Waters? ,:,Ves No; Surface Water Name, Volume Reaching Surfk;L6 Waters- Fish Kill? -Yes- --�"Nc Location-- A L Manhole#- Cause/Reason for'Upset/Spflf/Bypass, Severe Natural Condition; . I&I; _Rocts- Pipe Fai�ure/Break; Grease; PS Equip. Failure; _Debris In Line-, Outage; Other C c afler's Name, DWP,/ARO Staff Reportea *o. Marne) Date: 'S Time: 7 r APA/PM� ( I ;ZPl r4 Price, Bev From: Mitchell, Patrick Sent: Wednesday, November 04, 2015 2:28 PM To: Price, Bev; Larsen, Cory; Schutte, Maria; King, Morella s Subject: Synagro Central Statewide Class A inspection Attachments: WQ0035207 2015 October.pdf All: I am copying you on the inspection letter for the subject facility since there are source facilities within each of your regions that are included in this permit. I wasn't sure if you had a file for this one, but figured I would send it to you just in case you did. Patrick L. Mitchell, REHS, LSS Water Quality Regional Operations Section Division of Water Resources NC Department of Environmental Quality Phone: (336) 776-9698 Mobile: (336) 406-3928 Fax: (336) 776-9797 Winston-Salem Regional Office 450 W Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 <'.=-� Nothing Compares---,,-, -,,-, E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. North Carolina Department of Environmental Quality Pat McCrory -- - Donald R. van der Vaart Governor Secretary November 4, 2015 Mr. Marshall Puryear, Technical Services Director Syna.gro Central, LLC 284 Boger Rd. Mocksville, NC 27028 Subject: Compliance Evaluation Inspection Synagro Central, LLC — Distribution of Class A Residuals Program Permit No. WQ0035207 Statewide Operation Dear Mr. Puryear: On October 21, 2015 staff of the North Carolina Division of Water Resources Winston-Salem Regional Office (DWR) performed a compliance evaluation inspection of the subject residuals program. This inspection was conducted by DWR staff person Patrick Mitchell. The inspection reflects compliance with Permit WQ0035207. Please refer to the enclosed inspection report for additional observations and comments. If you or your staff have questions, please contact Patrick Mitchell or me at (336) 776-9800. Sincerely, Sherri V. Knight, P.E. — Assistant Regional Supervisor Water Quality Regional Operations Division of Water Resources, NC DEQ enc.: Compliance Inspection Report cc: ARO (electronic) MRO (electronic) RRO (electronic) WiRO (electronic) DWR WQ Central Office —Permit File WQ0035207 WSRO Files Winston-Salem Regional Office 450 W Hanes Mill Rd., Suite 300, Winston-Salem, NC 27105 Phone: 336-776-98001 Fax: 336-77IA631 i Customer Service 1.877-623.6748 An Equal Opportunity IAffirmative Action Employer— Made in part by recycled paper © r NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor John E. Skvarla, III Secretary October 17, 2014 Marshall R. Puryear, Technical Services Director Synagro 284 Boger Road Mocksville, NC 27028 SUBJECT: Compliance Evaluation Inspection Town of Franklin WTP Alum Ponds Distribution of Class A Residuals Permit No: WQ0035207 Macon County Dear Mr. Puryear: Enclosed please find a copy of the Compliance Evaluation Inspection Form from the inspection conducted on 9/30/2014. The facility was found to be in compliance with permit WQ0035207. Please refer to the enclosed inspection report for additional observations and comments. The assistance of Mr. Rob Hartsell was greatly appreciated during the inspection. If you or your staff have any questions, please call me at (828) 296-4685. Sincerely, Beverly Price Environmental Specialist Enc. cc: Rob Hartsell, WTP Superintendent, Town of Franklin Water Treatment Plant 437 Industrial Park Road . Franklin NC 28744 WQ Central Files W[Q Ashevil I e idle G:\WR\WQ\Macon\Wastewater\Non-discharge\Town of Franklin WTP\WQ0035207 CEI14.doc Water Quality Regional Operations —Asheville Regional Office 2090 U.S. Highway 70, Swannanoa, North Carolina 28778 Phone: 828-296-4500 FAX: 828-299-7043 Internet: hftp://portal.ncdenr.org/web/wq An Equal Opportunity \ Affirmative Action Employer Compliance Inspection Report Permit: WQ0035207 Effective: 01/06/14 Expiration: 02/28/16 ''Owner: Synagro SOC: Effective: Expiration: ,Facility: Distribution of Class A Residuals County: Randolph Region: Winston-Salem Randleman NC 27317 Contact Person: Marshall R Puryear Title: Technical Services Director . Phone: 336-998-7150 Ext.17 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Certification: Phone: 24 hour contact name Marshall Puryear 336-998-7150 On -site representative Robert E Hartsell 828-369-8998 Related Permits: NC0046345 City of Reidsville - Reidsville WTP NC0084093 Chatham County - Jordan Lake WTP NC0081671 City of Greensboro - Lake Townsend WTP NC0087866 Piedmont Triad Regional Water Authority -Randleman Lake WTP NC0057533 Brunswick County - Hood Creek WTP Inspection Date: 09/30/2014 Entry Time: 09:30AM Exit Time: - 10:OOAM Primary Inspector: Beverly Price Phone: 828-296-4500 Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: Distribution of Residual Solids (503) Facility Status: Compliant Not Compliant Question Areas: Miscellaneous Questions (See attachment summary) Inspection Type: Compliance Evaluation Page: 1 Permit: WO0035207 Owner - Facility: Synagro Inspection Date: 09/30/2014 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Facility Inspection - Both alum ponds were cleand out this year; distribution occurred in August. ' There was no distribution from this facility in 2013. Analytical results will be reviewed when the 2014 Annual Reported is submitted to the regional office. 9 Page: 2 Compliance Inspection Report Permit: WQ0035207 Effective: 03/17/11 Expiration: 02/28/16 Owner: Synagro Central SOC: Effective: Expiration: Facility: Town of Franklin WTP County: Macon 437 Industrial Park Rd Region: Asheville Franklin NC 28744 rnContact, Person: Marshall R Puryear Title: Technical Services Directo Phone: 336-998-7150 Ext.17 Directions to Facility: From Franklin take US64W/Murphy Rd for approx 3 miles to Industrial Park Rd. The facility is approx 1/4 mi on the right. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): P, o b �a 1-4 24 hour contact name Marshall Puryear Phone: 336-998-7150 Related Permits: Inspection Date: t 2&9 Entry Time: 14:99-AM Exit Time: M Primary Inspector: Beverly Price Phone: 828-296-4500 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Distribution of Residual Solids (503 exempt) Facility Status: ■Compliant Q Not Compliant Question Areas: Miscellaneous Questions N Record Keeping ■ Pathogen and Vector Attraction (See attachment summary) �,( ✓� c�.��o �l yi S &A (/-I% "J-K-` c f W Lj 6-k k e v,I-e w es1 U,, AQ Page: 1 Price, Bev From: Hardee, Ed Sent: Monday, June 23, 2014 1:19 PM To: Price, Bev Subject: RE: WQ0035207 - DRS WTP (multi -region) Bev, It probably went to WSRO. I did not see Franklin WTP listed in 2013 annual report. Only these below were listed in annual report as land applying. NC0057533 Hood Creek WTP Brunswick 787.55 dt NC0081671 Lake Townsend WTP Guilford 1,276.04 dt NC0084093 Jordan Lake WTP Chatham 520.16 dt Ed Hardee Division of Water Resources Water Quality Permitting Section, Non -Discharge Permitting Unit 1636 Mail Service Center Raleigh, NC 27699-1636 Phone (919) 807-6319 DISCLAIMER: Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Price, Bev Sent: Friday, June 20, 2014 2:01 PM To: Hardee, Ed Subject: WQ0035207 - DRS WTP (multi -region) Hey Ed, Do you know which region this went to? We did not get a copy here. I don't know if Franklin WTP had a distribution in 2013. Thanks, Bev Bev Price - Bev.Price@ncdenr.gov DENR - Division of Water Resources Water Quality Regional Operations Section Asheville Regional Office 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Notice: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 co plll� Y NCD NR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Dee Freeman Governor Director Secretary April 10, 2012 Marshall R. Puryear, Technical Services Director Synagro Central 284 Boger Road Mocksville, NC 27028 SUBJECT: February 29, 2012 Compliance Evaluation Inspection Synagro Central Town of Franklin WTP Residuals Permit No: WQ0035207 Macon County Dear Mr. Puryear: Enclosed please find a copy of the Compliance Evaluation Inspection Form from the inspection that I conducted on February 29, 2012. The facility was found to be in Compliance with permit WQ0035207. Please refer to the enclosed inspection report (Inspection Summary Page 2) for additional observations and comments. If you or your staff have any questions, please call me at (828) 296-4685. Sincerely, Beverly rice Environmental Specialist Enclosure cc: Robert Hartzel, WTP Superintendent Town of Franklin 437 Industrial Park Road Franklin, NC 28744 APS Central Files .4P—S-Nsf�eviI e i elm AQUIFER PROTECTION SECTION —Asheville Regional Office (ARO) 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211 Phone: 828-296-45001 FAX: 828-299-7043 Intemet: www.ncwaterauality.oro An Equal Opportunity 1 Affirmative Action Employer One NorthCarolina Natura!!tf Compliance Inspection Report Permit: WQ0035207 Effective: 03/17/11 Expiration: 02/28/16 Owner: Synagro Central SOC: Effective: Expiration: Facility: Town of Franklin WTP County: Macon 437 Industrial Park Rd Region: Asheville Franklin NC 28744 Contact Person: Marshall R Puryear Title: Technical Services Directo Phone: 336-998-7150 Ext.17 Directions to Facility: From Franklin take US64W/Murphy Rd for approx 3 miles to Industrial Park Rd. The facility is approx 1/4 mi on the right. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): 24 hour contact name Related Permits: Inspection Date: 02/29/2012 Primary Inspector: Beverly Price Secondary Inspector(s): Marshall Puryear Entry Time: 11:00 AM Exit Time: 11:30 AM Phone: 336-998-7150 Phone: 828-296-4500 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Distribution of Residual Solids (503 exempt) Facility Status: ■Compliant ❑ Not Compliant Question Areas: Miscellaneous Questions 0 Record Keeping Pathogen and Vector Attraction (See attachment summary) Page: 1 Permit: WQ0035207 Owner - Facility: Synagro Central Inspection Date: 02/29/2012 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: The inspection included a review (3/19)of the 2011 Annual Report (AR) and a site visit to the residuals storage ponds. Alum residuals are stored in two earthen basins until time of application. Synagro is the land applier for all residuals for this permit. 2011 AR Review: Land Application Certification Summary Form (ACF) was submitted. The Class A Distribution and Marketing Certification Form should be used for Distribution permits. In the future please use the DMSD Form. Page: 2 Permit: WQ0035207 Owner - Facility: Synagro Central Inspection Date: 02/29/2012 Inspection Type: Compliance Evaluation Reason for Visit: Routine Type Yes No NA NE Land Application Cl Distribution and Marketing ■ Record Keeping Yes No NA NE Is GW monitoring being conducted, if required? ❑ ❑ ■ ❑ Are GW samples from all MWs sampled for all required parameters? ❑, ❑ ■ ❑ .Are there any GW quality violations? ❑ ❑ ■ ❑ Is GW-59A certification form completed for facility? ❑ ❑ ■ ❑ Is a copy of current permit on -site? ❑ ❑ ❑ ■ Are current metals and nutrient analysis available? ■ ❑ ❑ ❑ Are nutrient and metal loading calculating most limiting parameters? ■ ❑ ❑ ❑ a. TCLP analysis? ■ ❑ ❑ ❑ b. SSFA (Standard Soil Fertility Analysis)? ■ ❑ ❑ ❑ Are PAN balances being maintained? ■ ❑ ❑ ❑ Are PAN balances within permit limits? ■ ❑ ❑ ❑ Has land application equipment been calibrated? ❑ ❑ ■ ❑ Are there pH records for alkaline stabilization? ❑ ❑ ■ ❑ Are there pH records for the land application site? ■ ❑ ❑ ❑ Are nutrient/crop removal practices in place? ❑ ❑ ■ ❑ Do lab sheets support data reported on Residual Analysis Summary? ■ ❑ ❑ ❑ Are hauling records available? ■ ❑ ❑ ❑ Are hauling records maintained and up-to-date? ■ ❑ ❑ ❑ # Has permittee been free of public complaints in last 12 months? ■ ❑ ❑ ❑ Has application occurred during Seasonal Restriction window? ❑ ❑ ■ ❑ Comment: Pathogen and Vector Attraction Yes No NA NE a. Fecal coliform SM 9221 E (Class A or B) ■ ❑ ❑ ❑ Class A, all test must be <1000 MPN/dry gram ■ Geometric mean of 7 samples per monitoring period for class B<2.0`10E6 CFU/dry gram ❑ Fecal coliform SM 9222 D (Class B only) ❑ ❑ ■ Cl Page: 3 Permit: WQ0035207 Owner - Facility: Synagro Central Inspection Date: 02/29/2012 Inspection Type: Compliance Evaluation Geometric mean of 7 samples per monitoring period for class B<2.0*10E6 CFU/dry gram b. pH records for alkaline stabilization (Class A) c. pH records for alkaline stabilization (Class B) Temperature corrected d. Salmonella (Class A, all test must be < 3MPN/4 gram day) e. Time/Temp on: Digester (MCRT) Compost Class A lime stabilization f. Volatile Solids Calculations g. Bench -top Aerobic/Anaerobic digestion results Comment: Reason for Visit: Routine n nn■n nn■n n nn■n nn■n n El n nn■n ❑ ❑ ■ Cl Page: 4 �pF W A T�cl y State of North Carolina abua Department of Environment and Natural Resources j Division of Water Quality Aquifer Protection Section Regional Staff Report To: Aquifer Protection Section Central Office Attn: Chonticha McDaniel From: Bev Price Asheville Regional Office I. GENERAL SITE VISIT INFORMATION 1. Was a site visit conducted? ® Yes or ❑ No a. Date of site visit: 2/22/2011 b. Site visit conducted by: Bev Price c. Inspection report attached? ❑ Yes or ® No Application No.: WQ0035207 Regional Login No.: d. Person contacted: Marshall Puryear, Technical Services Manager SYNAGRO and their contact information: (804) 443 - 2170 e. Driving directions: From Franklin take US 64W/Murphy Road for approximately 3 miles to Industrial Park Rd The facility is approximately 1/4 mile on the right. 437 Industrial Park Road II. PROPOSED FACILITIES FOR NEW AND MODIFICATION APPLICATIONS 1. Facility Classification: This will be a Class A permit; there is no classification for Class A residuals. (Please attach completed rating sheet to be attached to issued permit) 2. Are the new treatment facilities adequate for the type of waste and disposal system? ® Yes or ❑ No If no, explain: 3. Are site conditions (soils, depth to water table, etc) consistent with the submitted reports? ❑ Yes ❑ No ® N/A If no, please explain: 4. Do the plans and site map represent the actual site (property lines, wells, etc.)? ❑ Yes ❑ No ® N/A If no, please explain: 5. Is the proposed residuals management plan adequate? ® Yes ❑ No ❑ N/A If no, please explain: 6. Are the proposed application rates (e.g., hydraulic, nutrient) acceptable? ❑ Yes ❑ No Z N/A If no, please explain: 7. Are there any setback conflicts for proposed treatment, storage and disposal sites? 0 Yes or ❑ No If yes, attach a map showing conflict areas. The alum ponds are within 50 feet of the creek but the ponds were placed there when the plant was built. 8. Is the proposed or existing groundwater monitoring program adequate? ❑ Yes ❑ No ® N/A If no, explain and recommend any changes to the groundwater monitoring program: 9. For residuals, will seasonal or other restrictions be required? ❑ Yes ® No ❑ N/A If yes, attach list of sites with restrictions (Certification B) FORM: APSRSR 04-10 Page 1 of 3 III. EXISTING FACILITIES FOR iv1UDIFICATION AND RENEWAL APPI kTIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ❑ Yes ❑ No ❑ N/A ORC: Certificate #: Backup ORC: Certificate #: 2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? ❑ Yes or ❑ No If no, please explain: 3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately assimilating the waste? ❑ Yes or ❑ No If no, please explain: 4. Has the site changed in any way that may affect the permit (e.g.,.drainage added, new wells inside the compliance boundary, new development, etc.)? ❑ Yes or ❑ No If yes, please explain: 5. Is the residuals management plan adequate? ❑ Yes or ❑ No If no, please explain: 6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ❑ Yes or ❑ No If no, please explain: 7. Is the existing groundwater monitoring program adequate? ❑ Yes ❑ No ❑ N/A If no, explain and recommend any changes to the groundwater monitoring program: 8. Are there any setback conflicts for existing treatment, storage and disposal sites? ❑ Yes or ❑ No If yes, attach a map showing conflict areas. 9. Is the description of the facilities as written in the existing permit correct? ❑ Yes or ❑ No If no, please explain: 10. Were monitoring wells properly constructed and located? ❑ Yes ❑ No ❑ N/A If no, please explain: 11. Are the monitoring well coordinates correct in BIMS? ❑ Yes ❑ No ❑ N/A If no, please complete the following (expand table if necessary): Monitoring Well Latitude Longitude 0 If 0 , It 0 ,/ 0 , // 0 0 0 , „ 0 0 0 12. Has a review of all self -monitoring data been conducted (e.g., NDMR, NDAR, GW)? ❑ Yes or ❑ No Please summarize any findings resulting from this review: 13. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ❑ No If yes, please explain: 14. Check all that apply: ❑ No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC ❑ Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.) 15. Have all compliance dates/conditions in the existing permit been satisfied? ❑ Yes ❑ No ❑ N/A If no, please explain: 16. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? ❑ Yes ❑No❑N/A If yes, please explain: FORM: APSRSR 04-10 Page 2 of 3 IV. REGIONAL OFFICE RECO1._._ENDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ® No If yes, please explain: 2. List any items that you would like APS Central Office to obtain through an additional information request: Item Reason Engineer's Certification/Recommendation The dam on the ponds is covered with mature trees. I'm not sure it would be wise to cut them since there are so many and due to the size, but that is what we usually require unless we get a certification from an engineer indicating that the trees are not a problem. I will e-mail a photo of the dam. The trees haven't been a problem so far so I'm not sure if we need to make it an issue at this point. You can call me to discuss. 3. List specific permit conditions recommended to be removed from the permit when issued: Condition Reason 4. List specific special conditions or compliance schedules recommended to be included in the permit when issued: Condition Reason 5. Recommendation: ❑ Hold, pending receipt and review of additional information by regional office ❑ Hold, pending review of draft permit by regional office ❑ Issue upon receipt of needed additional information ® Issue ❑ Deny (Please state rea ns: ) 6. Signature of report preparer: Signature of APS regional supervisor: Date: �12 �1.4tr V. ADDITIONAL REGIONAL STAFF REVIEW ITEMS FORM: APSRSR 04-10 Page 3 of 3 To: Aquifer Protection Section Central Office Attn: From: Choose an item. Regional Office State of North Carolina Department of Environment and Natural Resources Division of Water Quality Aquifer Protection Section Regional Staff Report Application No.: WQ00 Regional Login No.: ja,k-e LLS (0q L(J IrAvAl Tor a, S mNO-5 40 I. GENERAL SITE VISIT INFORMATION 1. Was a site visit conducted? Yes or ❑ No av' k a. Date of site visit:4alit b. Site visit conducted by: TA y_P, c. Inspection report attached? ❑ Yes or [ 4 No d. Person contacted. and their contact information: (_) - ekt. ta�w P �`!'��o�t,., ►� • .'� 3 ti0 vh � l�s �l-o end, Pa�(� /�1. 61 t�-� e. Driving directions: -RW, 000© 11 MTP b a H. PROPOSED FACILITIES FOR NEW AND MODIFICATION APPLICATIONS 0 1. Facility Classification: (Please attach completed rating sheet to be attached to issued permit) 2. Are the new treatment facilities adequate for the type of waste and disposal system? Yes or ❑ No If no, explain: 3. Are site conditions (soils, depth to water table, etc) consistent with the submitted reports? ❑ Yes ❑ No N/A If no, please explain: ` 4. Do the plans and site map represent the actual site (property lines, wells, etc.)? M Yes ❑ No ❑ N/A If no, please explain: 5. Is the proposed residuals management plan adequate?] Yes ❑ No ❑ N/A If no, please explain: 6. Are the proposed application rates (e.g., hydraulic, nutrient) acceptable? ❑ Yes ❑ No E N/A If no, please explain: 7. Are there any setback conflicts for proposed treatment, storage and disposal sites? ❑ Yes or ❑ No If yes, attach a map showing conflict areas. 8. Is the proposed or existing groundwater monitoring program adequate? ❑ Yes ❑ No [k N/A If no, explain and recommend any changes to the groundwater monitoring program: 9. For residuals, will seasonal or other restrictions be required? ❑ Yes ❑ No N/A If yes, attach list of sites with restrictions (Certification B) " �0.0 J fV"CL't0r't_ Pon 4a P, PO SAS FORM: APSRSR04-10 �7a��Ziti�SG�. �;ti� — ���,,,� �2S,1 ��� j' Page 1 of III. EXISTING FACILITIES FOR iviODIFICATION AND RENEWAL APPLICATIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ❑ Yes ❑ No ❑ N/A QRC: Certificate #: Backup ORC: - - Certificate #: 2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? ❑ Yes or ❑ No If no, please explain: 3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately assimilating the waste? ❑ Yes or ❑ No If no, please explain: 4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance boundary, new development, etc.)? ❑ Yes or ❑ No If yes, please explain: 5. Is the residuals management plan adequate? ❑ Yes or ❑ No If no, please explain: 6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ❑ Yes or ❑ No If no, please explain: 7. Is the existing groundwater monitoring program adequate? ❑ Yes ❑ No ❑ N/A If no, explain and recommend any changes to the groundwater monitoring program: 8. Are there any setback conflicts for existing treatment, storage and disposal sites? ❑ Yes or ❑ No If yes, attach a map showing conflict areas. 9. Is the description of the facilities as written in the existing permit correct? ❑ Yes or ❑ No If no, please explain: 10. Were monitoring wells properly constructed and located? ❑ Yes ❑ No ❑ N/A If no, please explain: 11. Are the monitoring well coordinates correct in BIMS? ❑ Yes ❑ No ❑ N/A If no, please complete the following (expand table if necessary): Monitoring Well Latitude Longitude O II O , O O , O , „ O O , „ O , O O 12. Has a review of all self -monitoring data been conducted (e.g.; NDMR, NDAR, GW)? ❑ Yes or ON o Please summarize any findings resulting from this review: 13. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ❑ No If yes, please explain: 14. Check all that apply: ❑ No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC ❑ Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.) 15. Have all compliance dates/conditions in the existing permit been satisfied? ❑ Yes ❑ No ❑ N/A If no, please explain: 16. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? ❑ Yes ❑ No ❑ N/A If yes, please explain: FORM: APSRSR 04-10 Page 2 of 3 i. REGIONAL OFFICE RECOMI dDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ❑ No If yes, please explain: 2. List any items that you would like APS Central Office to obtain through an additional information request: Item Reason 3. List specific permit conditions recommended to be removed from the permit when issued: Condition Reason 4. List specific special conditions or compliance schedules recommended to be included in the permit when issued: Condition Reason 5. Recommendation: ❑ Hold, pending receipt and review of additional information by regional office ❑ Hold, pending review of draft permit by regional office ❑ Issue upon receipt of needed additional information ❑ Issue ❑ Deny (Please state reasons: ) 6. Signature of report preparer: Signature of APS regional supervisor: Date: V. ADDITIONAL REGIONAL STAFF REVIEW ITEMS FORM: APSRSR 04-10 Page 3 of 3 Price, Bev From: Price, Bev Sent: Thursday, February 24, 2011 10:40 AM To: Mcdaniel, Chonticha Subject: Town of Franklin DRS Permit WQ0035207 Attachments: DSCN2700.JPG Chonticha, I've attached these photos of the dam on the alum ponds at the Town of Franklin. I referenced the tree issue in my staff report which will go out today. Call me if you have questions. Bev Bev Price - Bev. Price@ncdenr.pov North Carolina Dept. of Environment and Natural Resources Asheville Regional Office Division of Water Quality - Aquifer Protection Section 2090 U.S. 70 Highway Swannanoa, NC 28778 Tel: 828-296-4500 Fax: 828-299-7043 Notice: E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. lt,,P 6--6 3 Sa,0 17 Synagro Distribution of Residuals Permit No. WQ0035207 2012 Annual Report RECENEDIDERROp MAY 2 Aquiferpmt bnS ANNUAL LAND APPLICATION CERTIFICATION FORM WQ Permit #: W00035207 County Macon Year 2012 Facility Name (as shown on permit) Town of Franklin WTP NPDES No. PWS 01-57-010 Land Application Operator Synagro Phone# (336) 998-7150 Land application of residuals as allowed by the above permit occurred during the past calendar year? _YES X NO. If NO, skip Part A, and Part B and proceed to Part C. Also, if residuals were generated but not land applied, please attach an explanation on how the residuals were handled. Part A — Residuals Application Summ=: Total number of application fields in the permit: Total number of fields utilized for land application during the year: Total amount of dry tons applied during the year for all application sites: Total number of acres utilized for land application during the year: Part B — Annual Compliance Statement: Facility was com liant during calend ar 2 with all conditi �f the land a p ' ate permit (includin ut not limited to items 1- be]ow) issu by i ter ro w r , ec ax e 42 Only residuals approved for this permit were applied to the permitted sites. 2. Soil pH was adjusted as specified in the permit and lime was applied (if needed) to achieve a soil pH of at least 6.0 or the limit specified in the permit. 3. Annual soils analysis was performed on each site receiving residuals during the past calendar year and three (3) copies of laboratory results are attached. 4. Annual TCLP analysis (if required) was performed and three (3) copies of certified laboratory results are attached. 5. All other monitoring was performed in accordance with the permit and reported during the year as required and three (3) copies of certified laboratory results are attached. 6. The facility did not exceed any of the Pollutant Concentration Limits in 15A NCAC 02T .1105(a) or the Pollutant Loading Rates in 15A NCAC 02T . 1105(b) (Applicable to 40 CFR Part 503 regulated facilities). 7. All general requirements as specified in the Land Application Permit were complied with (applicable to 40 CFR Part 503 regulated facilities). 8. All monitoring and reporting requirements in 15A NCAC 02T .1111 were complied with (applicable to 40 CFR Part 503 regulated facilities). 9. All operations and maintenance requirements in the permit were complied with or, in the case of a deviation, prior authorization was received from the Division of Water Quality. 10. No contravention of Ground Water Quality Standards occurred at a monitoring well or explanations of violations are attached to include appropriate actions and remediations. IL Vegetative cover was maintained and proper crop management was performed on each site receiving residuals, as specified in the permit. 12. No runoff of residuals from the application sites onto adjacent property or nearby surface waters has occurred. 13. All buffer requirements as specified on the permit were maintained during each application of residuals. Part C — Certification: "I certify, under penalty of law,that the above information is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Marshall Purrvear, Technical Service Director Permittee Name and Title (type or print) Signature of #ermittd Date Signature of Preparer* Date Signature of Land Applier Date (if different from Permittee) (if different from Permittee and Preparer) *Preparer is defined in 40 CFR Part 503.9(r) and 15A NCAC 02T .1102 (26) DENR FORM ACF (12/2006) Residuals Handling in Calendar Year 2012 Town of Franklin, NC Permit No. WQ0035207 No residuals fiom the Town of Franldin's water .treatment plant (PWS 01-57-010) in Franldin, NC were land applied in 2012. The facility has been retaining the biosolids within available onsite storage vessels at the treatment facility location. 2012 ANNUAL REPORT PROJECT: Town Of Franklin WTP Franklin NC FACILITY: Town of Franklin WTP 437 Industrial Park Road Franklin, NC 28744 (828)-369-8998 WTP NPDES: RESPONSIBLE OFFICIAL: FACILITY OPERATOR: PWS 01-57-010 Marshall Puryear TSD 284 Boger Road Mocksville, NC 27028 (336) 998-7450 Robert Hartzel, WTP Superintendent Town Of Franklin WTP 437 Industrial Park Road Franklin, NC 28744 (828)-369-8998