Loading...
HomeMy WebLinkAbout20181033 Ver 1_Owen Farms Repair Work_20221018Strickland, Bev From: Davis, Erin B Sent: Monday, November 7, 2022 5:32 PM To: Baker, Caroline D Subject: FW: [External] Owen Farms Repair Work Laserfiche Upload: Email DWR#: 20181033 v.1 Doc Date: 10/18/22 Doc Type: Mitigation — Mitigation Information Doc Name: General topic of email title From: Leslie, Andrea J <andrea.leslie@ncwildlife.org> Sent: Tuesday, October 18, 2022 8:56 AM To: Furr, Benjamin <Ben.Furr@davey.com> Cc: Kim Browning <Kimberly.D.Browning@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Alex Digeronimo <AIex.Digeronimo@davey.com>; Wiesner, Paul <paul.wiesner@ncdenr.gov>; Kevin Williams <KWilliams@davey.com>; Tisdale, Jessica <jessica.tisdale@hdrinc.com> Subject: RE: [External] Owen Farms Repair Work Hi Ben, As the site is unstable, we will allow repair work to occur within the trout moratorium between now and December 31, 2022. To lessen impacts to downstream trout reproduction and hellbender habitat, we ask that particular attention be paid to sediment and erosion control. Disturbed areas should be stabilized at the end of each work day, and flows should be diverted around instream work areas. Andrea Andrea Leslie Mountain Habitat Conservation Coordinator NC Wildlife Resources Commission 645 Fish Hatchery Rd., Building B Marion, NC 28752 828-803-6054 (office) 828-400-4223 (cell) www.ncwildlife.org + f nkoo T:U a l Get NC Wildlife Update delivered to your inbox from the N.C. Wildlife Resources Commission. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. From: Furr, Benjamin <Ben.Furr@davey.com> Sent: Wednesday, October 12, 2022 2:57 PM 1 To: Leslie, Andrea J <andrea.leslie@ncwildlife.org> Cc: Kim Browning <Kimberly.D.Browning@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Alex Digeronimo <Alex.Digeronimo@davey.com>; Wiesner, Paul <paul.wiesner@ncdenr.gov>; Kevin Williams <KWilliams@davey.com>; Tisdale, Jessica <jessica.tisdale@hdrinc.com> Subject: [External] Owen Farms Repair Work CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Andrea, We have selected a contractor to complete repairs at the Owen Farms site. As described in my September 16th email, repairs will consist of stream bank stabilization using sod mats and boulder toe protection. Baker Grading & Landscaping, Inc. (Baker) will complete repairs. The equipment operator for Baker is the same operator who built the job originally and completed repairs in 2021 so he is very familiar with the Site and erosion control measures required to minimize impacts to downstream trout reproduction and hellbender habitat. The contractor plans to mobilize by the end of October and complete repairs by Thanksgiving. In order to account for potential weather and/or holiday related delays, I would like to request a waiver to conduct instream work on West Fork French Broad River through December 31, 2022. If you are in agreement with this approach, please respond to this email with your approval. If you have any questions please call me at 919.588.9663. Thank you again for your assistance with this project. Benjamin Furr I Senior Consultant Davey Resource Group, Inc. 3101 Poplarwood Court, Suite 120, Raleigh, NC 27604 P: 919.645.4350 ext. 4354 I M: 919.588.9663 DAVEY Resource Group Visit our local office page 2