From: Davis, Erin B
Sent: Monday, November 7, 2022 5:35 PM
To: Baker, Caroline D
Subject: FW: [External] RES Neu -Con UMBI, Poplar Creek (SAW-2016-01985) Year 3
Monitoring Report and Credit Release Request
Laserfiche Upload: Email
DWR#: 20160979 v.1
Doc Date: 10/13/22
Doc Type: Mitigation — Mitigation Information
Doc Name: General topic of email title
From: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>
Sent: Thursday, October 13, 2022 3:40 PM
To: Tugwell, Todd J CIV USARMY CESAW (US)<Todd.J.Tugwell@usace.army.mil>; Kim Browning
<Kimberly.D.Browning@usace.army.mil>; Haywood, Casey M CIV USARMY CEMVP (USA)
<Casey.M.Haywood@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W.
<travis.wilson@ncwildlife.org>; Bowers, Todd <bowers.todd@epa.gov>
Subject: [External] RES Neu -Con UMBI, Poplar Creek (SAW-2016-01985) Year 3 Monitoring Report and Credit Release
Request
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good afternoon,
*Please Note — at this time, I am not planning an IRT site visit for Year 3, so please let me know if you would like to
conduct an on -site visit.
The below reference bank Sponsor has submitted an Annual Monitoring Report for NCIRT review, and is requesting a
release of credits. The Annual Monitoring Report has been posted to the RIBITS Cyber Repository for the bank site (see
link and instructions provided below). If you are unable to access the document or prefer to have a hard copy mailed to
you, please let me know as soon as possible, and I will arrange to get you a copy of the report.
This review will follow the process outline for Credit Release Approval in the 2008 Mitigation Rule (Section 332.8(o)(9)),
which requires an IRT review period of 15 calendar days from the date of this email notification. Please provide any
comments by 5 PM on the 15-day comment deadline shown below. Comments provided after the 15-day comment
deadline may not be considered. If you would like to request a site visit prior to submitting comments, please notify me
as soon as possible but prior to the 15-day comment due date. If a site visit is required, the due date for IRT comments
will be extended to 15 days after the date of site visit. Once I have received a request for a site visit, I will coordinate
with the IRT and Sponsor to arrange for the on -site meeting; however, please note that due to workload it may take a
month or longer to arrange the meeting. Within 30 days of the conclusion of the IRT review period (comment deadline),
a copy of all comments will be provided to the bank Sponsor and the IRT along with District Engineer's intent to approve
or disapprove this credit release.
Sponsor: EBX-Neuse I, LLC
Bank Name: Neu -Con UMBI / Poplar Creek Mitigation Site
1
USACE ID: SAW-2016-01985
River Basin: Neuse
HUC: 03020201
County: Johnston
Requested Credit Release: Year 3 Annual Monitoring
10% of the total stream restoration and/or enhancement credits: 392.65 warm water stream credits
15-Day Comment Start Date: October 13, 2022
15-Day Comment Deadline: October 28, 2022
45-Day Credit Release Approval Deadline: November 27, 2022
NOTE: Deadlines will be extended if an on -site meeting is requested.
Please be sure to log on to RIBITS before following the link below. Once in the Cyber Repository, select the arrow beside
appropriate folder to view and/or download the documents.
Cyber Repository
Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:116831070013:::RP,278:P278 BANK ID:4416
Thank you and please contact me with any questions,
Sam Dailey