Loading...
HomeMy WebLinkAbout20110762 Ver 2_Approval Letter_20141218'gV0W;W NCDENR North Carolina Department of Environment and Natu4 Resources Pat McCrory John E. Skvarla, III Governor Secretary December 18, 2014 DWR # 11 -0762 v2 Dare County Navy Mid - Atlantic Region Attn: Ms. Elizabeth Nashold Code N -45, Regional Environmental Group 1510 Gilbert Street Norfolk, VA 23511 Subject: Approval of Individual 401 Water Quality Certification with Additional Conditions Navy Dare County Bombing Range Target Improvements USACE Action ID. No. SAW- 2011 -01571 Dear Ms. Nashold: Attached hereto is a copy of Certification No. 4010 issued to Ms. Elizabeth Nashold and Navy Mid - Atlantic Region, dated December 18, 2014. This certification replaces the previous certification issued on December 14, 2011. Please note that you should get any other federal, state or local permits before proceeding with the subject project, including those required by (but not limited to) Sediment and Erosion Control, Non - Discharge, and Water Supply Watershed regulations. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at l.tP: www.ncoh.cornz or by calling the OAH Clerk's Office at (919) 431 -3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). 401 & Buffer Permitting Unit 1617 Mad Service Center, Raleigh, North Carolina 2 7699 -1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919 - 807 -6300 FAA 919 - 8076494 1 Cushorner Service: 1 -877- 613 -6748 Unternet: waww.nmaterquality.org Navy Mid-Atlantic Region DVVR#1l-O762v2 Individual Certification #4010 Page 2 of 7 The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via UIPostal Service: If sending via delivery service (UPS, FedG,ptd: Office ofAdministrative Hearings Office of Administrative Hearings 67l4 Mail Service Center 171l New Hope Church Road Raleigh, N[J7699-G7l4 Raleigh, NC276O9-6205 One (1) copy of the petition must also be served to DENR: John Evans, General Counsel Department of Environment and Natural Resources l6D1 Mail Service Center Raleigh, NC 27699-1601 Unless such a petition ia filed, this Certification shall be final and binding. This certification completes the review of the Division under section 401 of the Clean Water Act and l5ANCACO2H.O5D0. Contact Anthony Scarbraughat252-948-8924or Or Jennifer 8urdette at929-8O7-63G4or if you have any questions or concerns. cc: Thad McDonald, Naval Facilities Engineering Cornmnand,Code N-45, Regional Environmental Group, l51O Gilbert 5t, Norfolk, VA23511 US4CE Washington Regulatory Field Office Todd Bowers, EPA, Sam Nunn Federal Center, 61 Forsyth Street SW, Atlanta, GA 30303 DVVRVVaRO4O2file DWR 401 & Buffer Permitting Unit file Filename: 110762v20avyDare[oBombin0RengeTarQet|mp(Dare)_401_I[_Mnd.docx Navy Mid-Atlantic Region DWR# 11-0762 v2 Individual Certification #4010 Page 3 of 7 CERTIFICATION #4010 is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to North Carolina's Regulations in 15 NCAC 02H .0500, to Ms. Elizabeth Nashold and Navy Mid-Atlantic Region, who have authorization for the impacts listed below, as described within your application dated September 18, 2014 and received by the N.C. Division of Water Resources (Division) on September 24, 2014, subsequent information on December 5, 2014, and by Public Notice issued by the U. S. Army Corps of Engineers and received by the Division on November 5, 2014. The State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of the Public Laws 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval requires you to follow the conditions listed in the certification below. Conditions of Certification: 1. Impacts Approved The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0506(b)(c)] Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary 404/401 Wetlands -1 4.021 (acres) 0 (acres) The following impacts are hereby approved as previously approved by an Individual Certification issued on December 14, 2011 and revised based on the modification request dated September 18, 2014 and received by the Division on September 24, 2014. [15A NCAC 02B .0506(h)] Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary 404/401 Wetlands 5.252 (acres)' 0 (acres) Amount reduced by 2.182 acres due to removal of previously approved impacts from West Layclown Area and Ammo Dump target pad. 2. Compensatory Mitigation Mitigation must be provided for the proposed impacts as specified in the table below. A receipt from The Great Dismal Swamp RestorationBank Timberlake Mitigation Bank indicates that 7.434 acres of non-riparian wetland credits have been purchased for the project. The Division has received an acceptance letter from The Great Dismal Swamp RestorationBank Timberlake Mitigation Bank to meet the remaining mitigation Navy Mid-Atlantic Region DVVR#I1{}762v2 Individual Certification #4Q1O requirement. Until The Great Dismal Swamp ReStor6tOn8ank Timberlake Mitigation Bank receives and clears your payment, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall Occur. For accounting purposes, this Authorization Certificate authorizes payment toThe Great Dismal Swamp Re6ton8tiODB3nk Timberlake Mitigation Bank to meet the following compensatory mitigation requirement [15A NCAC 02H .0506 (b)(6)]: S. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification for this project. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices shall be performed so that no violations of state water quality standards, statutes, or rules occur. Approved plans and specifications for this project areincorporated by reference and are enforceable parts Of this permit. [15ANCACO2H.0501 and .0502] 4. Sediment and Erosion Control Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices. If applicable, the project must comply with the specific conditions and requirements of the NPDES Construction Stormwater Permit issued to the site and the following requirements [I5ANCACO2H.O5O6(b)(5) and (c)/3\l: a. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal or exceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, inC|udingCQntr8ctor+zvvned or leased borrow pits associated with the project. b. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. c. Reclamation measures and implementation must comply with the reclamation in accordance with the requirements ofthe Sedimentation Pollution Control Act and the Mining Act of 1971. d. Sufficient materials required for stabilization and/Or repair oferosion control measures and 5tnrmnvvater routing and treatment shall bewn site at all times. e. For P0/\, 5A, WS-1, VV|-||, H[}VV, ORVVwaters. The sediment and erosion control designs must comply with the requirements set forth in 15A NCAC 04B.0124 Design Standards /n Sensitive Watersheds. Compensatory River and Sub-basin Mitigation Number Required 404/401 Wetlands 1.921 (acres) Pasquotank/03010205 S. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification for this project. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices shall be performed so that no violations of state water quality standards, statutes, or rules occur. Approved plans and specifications for this project areincorporated by reference and are enforceable parts Of this permit. [15ANCACO2H.0501 and .0502] 4. Sediment and Erosion Control Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices. If applicable, the project must comply with the specific conditions and requirements of the NPDES Construction Stormwater Permit issued to the site and the following requirements [I5ANCACO2H.O5O6(b)(5) and (c)/3\l: a. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal or exceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, inC|udingCQntr8ctor+zvvned or leased borrow pits associated with the project. b. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. c. Reclamation measures and implementation must comply with the reclamation in accordance with the requirements ofthe Sedimentation Pollution Control Act and the Mining Act of 1971. d. Sufficient materials required for stabilization and/Or repair oferosion control measures and 5tnrmnvvater routing and treatment shall bewn site at all times. e. For P0/\, 5A, WS-1, VV|-||, H[}VV, ORVVwaters. The sediment and erosion control designs must comply with the requirements set forth in 15A NCAC 04B.0124 Design Standards /n Sensitive Watersheds. Navy Mid-Atlantic Region DVVR#11f}76ZvZ Individual Certification #4O1O Page 6of7 Sediment and erosion control measures shall not be placed in wetlands orwaters. Exceptions to this condition require application submittal to and written approval by the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, then design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands, stream beds, or banks, adjacent toor upstream and downstream uf the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two /2\ months ofthe date that the Division of Energy, Mineral and Land Resources /[}EK0LR\or locally delegated program has released the specific area within the project. [15ANCACO2H .O5O} and .O5O2] 6. Construction Stormwater Permit NCG010000 An NPDES Construction Stornmxxater Permit is required for construction projects that disturb one (l) or more acres ofland. This Permit allows stmrmnmmtertobe discharged during land disturbing construction activities asstipulated in the conditions of the permit. If your project is covered by this permit, full compliance with permit conditions including the erosion & sedimentation control plan, inspections and maintenance, self-monitoring, record keeping and reporting requirements isrequired. A copy of the general permit (NCGO1 0000), inspection log sheets, and other information may be found at: . 25AN[A[02H.O5OG(b)(5\and 7. Work in the Dr All work in or adjacent to stream waters shall be conducted so that the flowing stream does not come in contact with the disturbed area. Approved best management practices from the most current version of the NIC Sediment and Erosion Control Manual, or the NC DOT Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams, and other diversion structures shall be used to minimize excavation in flowing water. [lSA 8. If concrete is used during the construction, then all necessary measures shall be taken to prevent direct contact between uncured or curing concrete and waters of the state. Water that inadvertently contacts uncured concrete shall not be discharged to waters of the state due to the potential for elevated pH and possible aquatic life/fish kills. [15ANCA[02B.0200] 9. All temporary fill and culverts shall be removed and the impacted area returned to natural conditions, within 60 days of the determination that the temporary impact is no longer necessary. The impacted areas shall be restored to original grade, including each stream's original cross sectional dimensions, plan form pattern, and longitudinal bed and bed profile, and the various sites shall be stabilized with natural woody vegetation (except approved maintenance areas) and restored to prevent erosion. [15A NCAC 02H .0506(b)(2) and (c)(2)] Navy Mid-Atlantic Region DVVR#11-O76ZvZ Individual Certification #4Ul0 Page 6of7 10. All temporary pipes/culvertaripr8p pads etc, shall b8 installed in all streams a6 outlined inthe most recent edition of the North Carolina Sediment and Erosion Control Planning and Design Manual 5V as not to restrict stream flow Orcause diS-equilibrium. [I5A NCAC 02H .0506/bV2\ 11. Any hprap required for proper culvert placement, stream stabilization, Or restoration of temporarily disturbed areas shall be restricted tothe area directly impacted by the approved construction activity. All ripr3pshall be buried and/or "keyed in" such that the original stream elevation and streambank contours are restored and maintained. Placement Ofriprap or other approved materials shall not result in cle-stabilization of the stream bed or banks upstream Qr downstream of the area. [15ANCACO2H.0506(b)(2)] 12. Any hpr3p used for stream stabilization shall beOfe size and density to prevent movement b« wave action, Current action, or stream MovvS and CORSiSt of clean rock or masonry material free of debris Or toxic pollutants. Ripr3p shall not be installed in the strearnbed except in specific areas required for velocity control and to ensure integrity Qfbank stabilization measures. [15A NCAC 02H .0506(b)(2)] 13.A one-time apphcatk]nof[erti|iz8rtore-est8bli5hvegptabonisaUovv£dindi5tud]ed areas including riparian buffers, but i6 restricted to no closer than 1O feet from top of bank Of streams. Any fertilizer application must comply with all other Federal, State and Local regulations. |I5ANCACO28.0231l 14. This Certification does not relieve the applicant of the responsibility to obtain all other required Federal, State, or Local approvals. 15. Continuing Compliance Ms. Elizabeth Nashold and Navy Mid-Atlantic Region shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 3O3/d\ofthe Clean Water Act) and any other appropriate requirements ofState and Federal law. [I5ANCACO2B.0200] |f the Division determines that Such standards or laws are not being nn8t (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification. Before modifying the Certification, the Division shall notify K4S. Elizabeth Na6h0|d and Navy Mid-Atlantic Region and the U.S. Army Corps of Engineers, provide public notice in accordance with I5A NCA[O2H .0503 and provide opportunity for public hearing in accordance with 15A NCACO2H .0504. Any new or revised conditions shall be provided to Mg. Elizabeth Nasho|d and Navy Mid-Atlantic Region in writing, shall be provided tVthe U.S. Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions Of the 4O4 Permit for the project. Navy Mid- Atlantic Region DWR# 11 -0762 v2 Individual Certification #4010 Page 7 of 7 16. This approval is for the purpose and design described in your application and as described in the Public Notice. The plans and specifications for this project are incorporated by reference and are an enforceable part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this Certification and is responsible for complying with all conditions. Any new owner must notify the Division and request the Certification be issued in their name. [15A NCAC 02H .0501 and .0502] 17. The applicant and /or authorized agent shall provide a completed Certificate of Completion Form to the DWR 401 & Buffer Permitting Unit within ten days of project completion (available at: i qt orta,N.ncdenr.or,�vve we sw vLs certsand rrrlit a l tc rrjjs). [15A NCAC 02H .0502(f)]Amm� 18. This certification grants permission to the director, an authorized representative of the Director, or DENR staff, upon the presentation of proper credentials, to enter the property during normal business hours. [15A NCAC 02H .0502(e)] This approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. The conditions in effect on the date of issuance shall remain in effect for the life of the project, regardless of the expiration date of this Certification. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H.0506] Non - compliance with or violation of the conditions herein set forth may result in revocation of this Certification and may also result in criminal and /or civil penalties. KAH /jab EM