HomeMy WebLinkAbout20221559 Ver 1_CAMA Application_20221104DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Jimmie Summerell 2. LOCATION OF PROJECT SITE: located off SR 1213 and Shifting Sands Rd, Lot 1 Bridge Path Estates in Columbia, Tyrrell County, North Carolina Location - 35' 58' 23" N 760 15' 27" W 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 13 October 2021 Was Applicant Present — no 5. PROCESSING PROCEDURE: Application Received — 28 October 2022 Office — Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan -Tyrrell County Land Use Plan Land Classification from LUP — Existing Forrest Land, Future Rural (B) AEC(s) Involved: Public Trust Shoreline, Public Trust Area, Estuarine Waters, Estuarine Shoreline (C) Water Dependent: no (D) Intended Use: Residential (E) Wastewater Treatment: Existing — None Planned - none (F) Type of Structures: Existing — none Planned — none 7. (G) Estimated Annual Rate of Erosion: V-20' (H) Source — applicant HABITAT DESCRIPTION: [AREA] (A) Vegetated Wetlands (404) (B) Non -Vegetated Wetlands 375 ft2 River Bottom riprap (C) Other (Uplands) 5,375 ftz upland covered I I backfill (D) Total Area Disturbed: f5,750ft2 (0.12 acres) (E) Primary Nursery Area: No (F) Water Classification: SB Open: No $. PROJECT SUMMARY: The applicant proposes to place riprap waterward on 75' of shoreline, backfill and maintain ±550' of rip rap stabilized shoreline Jimmie Summerell Lot 1 Bridge Path Estates Columbia, Tyrrell County, NC Project setting Jimmie Summerell has submitted the following application for the installation of an additional 75' of riprap for shoreline stabilization, upland backfill and continued maintenance to his already stabilized 550' of riprapped shoreline. The project site is located off SR 1213 and Shifting Sands Rd on Lot 1 Bridge Path Estates on the Albemarle Sound in Columbia, Tyrrell County, North Carolina. The site involves a 16-acre tract of land adjacent to the Albemarle Sound with an eroded feature that connects to a small pond. The majority of the shoreline in the project area is stabilized with riprap with an existing access driveway/path immediately landward of the stabilized shoreline. Adjacent to the driveway/path are various upland grasses some pine trees and an identified 404 wetland area. Section 404 Wetlands have been delineated on the property in years past, however no wetlands exist in the vicinity of the proposed project. The adjacent upstream (west) property is stabilized with riprap and a large area of wooded wetlands as well as a single-family dwelling. The downstream end of the project area abuts another rip rap stabilized shoreline with an existing culvert, a pier with platform, and future single-family waterfront lots. The site elevation is L5' above normal water level (NWL) along the Albemarle Sound and is classified as SB the project location by the Environmental Management Commission. The area along the Albemarle Sound is coastal fishing waters and there were no SAV's on site at the time of field visit. The applicant has acquired four previous general permits for shoreline stabilization dating back to 2004. Project description The applicant proposes to place 75' of riprap at a 2 to 1 slope not to exceed 5' waterward of existing shoreline and NWL to repair damaged previously stabilized shoreline and backfill upland areas which have been eroded landward of the riprap to enhance and maintain shoreline stabilization along the sound. With a base width of 5' the riprap will have a total footprint of 375 ft2. Anticipated impacts The project as proposed will result in the filling of 375 ft2 of sound bottom associated with the placement of riprap for shoreline stabilization. The project will result in short term localized turbidity as a result of the construction activities associated with shoreline stabilization T. Ashley Grandy — 2 November 2022 NARRATIVE TO: DCM/WASHINGTON DISTRICT OFFICE MR SPRIVEY AND MR GRANDY, I am proposing to rip rap +/- 75' of shoreline to stabilize. The area to be stabilized was previously permitted with general permit 38731-b. In addition 3 other general permits were issued for rip rap.In addition to the new rip rap I am proposing to repair/maintain the existing rip rap and backfill landward of the existing rip rap to re establish what eroded from previous hurricanes. The repair/maintenance will not exceed the existing footprint. VimieScummerell,Owner DOM MP4 APPLICATION for Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Applicant 1: First Name MI Last Name Applicant 2: First Name MI Last Name If additional applicants, please attach an additional pages) with names listed. Mailing Address PO Box City State ZIP Country one No. FAX No. Street Address (if different from above) City State ZIP Email 2. Agent/Contractor Information N)A Business Name Agent/ Contractor 1: First Name MI Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP Phone No. 1 - - ext. Phone No. 2 - - ext. FAX No. Contractor # Street Address (if different from above) City State ZIP Email <Form continues on back> Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address .:5)+1 Ic -r) N & trZ>S Slate Rd. # r t�7 (,�- �3. 1 �r� PATH Z Sr 12i •> Subdivision Name City State Zip -� _,tom- rya r✓ s C-cv NC Z-103Z 5 Phone No. Lot No.(s) (if many, attach additional page with list) - - ext I I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Pf L�=` L �. c. Is the ater body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. atural ❑Manmade ❑Unknown V-) e. Is proposed work within city limits or planning jurisdiction? If applicable, list the planning jurisdiction or city limit the proposed ❑Yes *0 I work falls within. WY.� 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sci t.) c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) (If many lot sizes, please attach additional page with a list) ❑NHW or'�(NWL e. Vegetation on tract f. Man-made features and uses no on tract P-) r "r-P ) f �Vc`'J Y`r�r g. Identify and describe the existing land uses adjacent to the proposed project site. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? (Attach zoning compliance certificate, if applicable) �. ❑Yes ❑No [3t< j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes 0146"'❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes QAkI ❑NA National Register listed or eligible property? <Form continues on next page> Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? Yes E)No (ii) Are there coastal wetlands on the site? ❑Yes 24/0 (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes CdNo (Attach documentation, if available) n. Describe existing wastewater treatment facilities. o. Describe existing drinking water supply source. N p. Describe existing storm water management or treatment systems. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Co ercial ❑PubliclGovernment rivate/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. (; ?4C.r--t-V) }`�L1-rrV d. List all development activities you propose. _'I'& ) N ti +- yip.4 C- e-IF ( U\-- -- —1 C,)',� n tu7 R--4 p iz.. F'R-0 � . f cU P-C I-k � + 1- (� © F E RP-O t Pro .4-0 2--A F,LC. LA,',�ILQ,a-Cl O� e. Are the proposed activities maintenance of an existing project, new work, or both? k�-r )A f. What is the approximate total disturbed land area resulting from the proposed project? Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes Ffio ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. L Will wastewater or stormwater be discharged into a wetland? ❑Yes allo ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA j. Is there any mitigation proposed? ❑Yes EKo ❑NA If yes, attach a mitigation proposal, <Form continues on back> Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit B. Additional Information In addition to this completed application fomn, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claim title the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. y6 rrl�, Name i-pr-rib aar2 7- LZ-\6 Phone No. Address 20 P:�> 146 ct>r opk-,C) 2- Name [ }����� �ryrj,, t� L�� Phone No. Address-7O f7j4� Cpt,c� Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) 1 k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. "J.A, 1 7. Certification and Permission to Enter on Land understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date Print Name 1MI - j i t Signature 7e indicate application attachments pertaining to your p oposed project. CM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ❑DCM MP-4 Structures Information Form DCM MP-2 . EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project, Please Include all suppfementaf Information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given In feet. Access Channel Other (NLW or Canal Boat Basfn Boat stamp Rock Groin Rock (excfudfng NWL} Breakwater shoreline Length Width Avg. Existing Depth Final Project Depth I. EXCAVATION a, Amount of material to be excavated from below NHW or NWL in cubic yards. c. (1) Does the area -to be excavated include coastal wetlands/marsh (CW-), submerged, -aquatic vegetation (SAV), shell bottom (SB), or other wetlands (Wl_)? If any boxes are checked, provide the number of square feet affected. 0CW ❑SAV ❑SS ❑Wt. ❑None (ii) Describe the purpose of the excavation in these areas: 2. DISPOSAL OF EXCAVATED MATERIAL {i} Do you claim title to disposal area? ❑Yes ONO [DNA If no, attach a letter granting permission from the owner (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shelf bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑S8 OWL ❑None (ii) Describe the purpose of disposal in these areas: NA NA NA NA b, Type of material to be excavated, d. High -ground excavation in cubic yards. b. Dimensions of disposal area, tabilizatfon section not applicable iawuru.n1��_r r�M d. (1) Will a disposal area be available for future maintenance? Dyes ❑No DMA (ii) If yes, where? f. (i) Does the disposal include any area in the water? ❑Yes ❑No ❑NA (ii} If yes, how much water area is affected? N :'i "4+T•i',•r.i s�'�.+ ?7'.� ;'7 'F`^1: rs. ?: {,�. `i'.'v?•}�i77: ::'Si:---J 73)1 i'1 �i1X ^.._ 2 Q 3, ,SHORELINE STABILIZ4 TION . (If development is a tiNQod groin, use MP-4— Structures) a. Type of shoreline st billzatlon: ❑Bulkhead ( �iprap ❑BreakwateNSill []Other: c. Average distance waterward of NHW or NWL: e. Type of stabilization material: D1L CCL c ff g. Number of square feet of fill'to be placed below water level. Bulkhead backfltl Riprap BreakwatertS81 _ .. Other I. Source of fill material, ❑ This section not applicable b. Length:'r'.'�(_ X I STl NLs' Width: d, Maximum distance waterward. of NHW or NWL: J (1) Has there been shoreline erosion during preceding 12 months? es ❑No ❑NA (li) If yes, state amount of erosion and source of erosion amount information. C7f�Si~�-vnY - 2 a. h. Type of fill material. 4. OTHER FILL ACTIVITIES his section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA b. (1) Will fill material be olaced in coastal wetlandslmarsh (CW). If yes, (ii) Amount of material to be placed in the water (iii) Olmensions of fill area (Iv) Purpose of fill submerged aquatic vegetation (SAV), shell bottom (SIB), or other wetlands (WL)? If any boxes are checked, pray-sde the number of square feet affected. ❑CW ❑SAV ❑SS ❑WL ❑None (ii) describe the purpose of the rill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? C. (i) Will navigational aids be required as a result of the project? ❑Yes []No ❑NA (ii) if yes, explain what type and how they will be implemented. Dale - 1_0�)L� Project Name d, (i) Will wetlands be cr sed in transposing equipment to project site? ❑Yes , O ❑NA (k) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Applicant Name Appt Signature n l c 9/20122, 8:38 AM Coo Ile yaps 160 Shifting Sands Rd 160 Shifting Sands Rd - Google Maps Srx ":y.FEra 9,;' ,C", ayti. Goy gle Map data @2022 2000 ft t-,; --.--: ,A 160 Shifting Sands Rd ooa-oo Directions Save Nearby Send to Share phone 160 Shifting Sands Rd, Columbia, NC 27925 XPCV+P9 Columbia, North Carolina https://www.google-comlm apslpl aceli 60+S hifting+Sands+Rd, +Columbia,+NC+279251@35.9458433,-76.2602263,14z1d ata=! 4m5! 3m411 sOx89a57011... 111 a Be cb S T4 9 }1 W a t Z cc 3Z 1 UdUObd i►�'1Nb1S 1 J.. c� r cz N O. V � � 1-4 Q � o Q vz � oC 7 � o� a Gti• ce ROY COOPER Governor ELIZABETH S. BISER Secretary BRAXTON DAVIS Director MEMORANDUM: NORTH CAROLINA Environmental Quality November 4, 2022 FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) gregq.bodnara-ncdenr.gov SUBJECT: CAMA Major Permit Application Review Applicant: Jimmie Summerell Project Location: SR 1213 and Shifting Sands Lot 1 Bridge Path Est. Columbia Tyrrell County North Carolina Proposed Project: Propose to place riprap waterward on 75' of shoreline, backfill and maintain ±500' of riprap stabilized shoreline Please indicate below your agency's position or viewpoint on the proposed project and return this form to Gregg Bodnar at the address above by November 26, 2022. If you have any questions regarding the proposed project, contact Ashley Grandy (252) 948-3854 when appropriate, in- depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME AGENCY SIGNATURE DATE D EQ �� North Carolina Department of Environmental Quality I Division of Coastal Management Washington Office 1 943 Washington Square Mall I Washington, North Carolina 27889 Department ofEmvonmeme r� /'� 252.946.6481 E Q�� North Carolina Department of Environmental Quality I Division of Coastal Management Washington Office 1 943 Washington Square Mall I Washington, North Carolina 27889 NORTH CAROLINA _ Department mEnvironmental Quari /� 252.946.6481