Loading...
HomeMy WebLinkAboutNC0086665_authorization to construct_20000517Permit No. NC0086665 ATC Number 0086665ACA Page 3 Engineer's Certification (0086665ACA) I S. LYt.E Mo2E/14 as a duly registered Professional Engineer in the State of North Carolina. having been authorized to observe (periodically, wee.1 '. `• ffie) the construction of the project. ii / 4t /O1A/62-- r! ie61.125'411c2.E , tic Project Name Location for the Permittee hereby state that. to the best of my abilities. due care and diligence was used in the observation of the following installations: • Construction of an oil/water separator and bag filter; and • Installation of all necessary piping and appurtenances. 1 certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Date Mail this Certification to the Registration No. d 22 'eV NPDES Unit Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 E44444 9►A���,,� The following modifications/improvements were made to the oil/water separator system since the application was submitted: 1. Trisep Filter discharge pipe was modified to include a vacuum breaker so the tank could not be siphoned. 2. Control was added to keep the pumps off when the Trisep filter is in the backwash mode. 3. Piped the Trisep filter backwash into the oil side of the sump. 4. The evaporative cooler discharge from units 1 — 4 was routed through the O/W separator because of convenience of piping. The O/W system is large enough for the small amount of flow added by the evaporators. 5. The flow through the system is calculated based on the pump curves. There is no flow meter. ti State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director November 19, 1999 Ms. Starla Lacy, Environmental Specialist Rockingham Power LLC 1000 Louisiana, Suite 5800 Houston, Texas 77002-5050 rA NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: 1111111111111111.1111111. Authorization to Construct ammommiamr Combustion Turbine Facility Rockingham County Dear Ms Lacy: The Division received a letter of request for an Authorization to Construct on March 31, 1999 and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for construction activities associated with water management projects at the above referenced facility. Specifically, authorization is granted for the following: • Construction of an oil/water separator with bag filter; and • Installation of all necessary piping and appurtenances. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0086665 issued November 19, 1999, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0086665. Any residuals generated from these treatment facilities must be disposed of in accordance with G.S. 143- 215.1 and in a manner approved by the North Carolina Division of Water Quality. In the event that the facilities fail to perform satisfactorily. including the creation of nuisance conditions. the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Office, telephone number (336) 771-4600. shall be notified at least forty- eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday. excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the NPDES Unit, 1617 Mail Service Center, Raleigh. NC 27699-1617. 1617 Mail Service Center. Raleigh. North Carolina 27699-1617 - Telephone 919-733-5083/FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer - 50% recycled/ 10% post -consumer paper Visit us on the Internet at http://h2o.enr.state.nc.us/NPDES Permit No. NC0086665 ATC Number 0086665ACA Page 2 Upon classification of the facility by the Certification Commission. the Permittee shall employ a certified water pollution control treatment system operator to be in responsible charge (ORC) of the water pollution control treatment system. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the water pollution control treatment system by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8G. .0202. The ORC of the facility must visit each Class 1 facility at least weekly and each Class 11, III, and IV facility at least daily, excluding weekends and holidays. and must properly manage and document daily operation and maintenance of the facility and must comply with all other conditions outlined in Title 15A, Chapter 8G, .0204. Once the facility is classified. the Permittee must submit a letter to the Certification Commission which designates the operator in responsible charge within: (A) Sixty calendar days prior to wastewater being introduced into a new system or (B) within 120 calendar days of the following, (i) after receiving notification of a change in the classification of the system requiring the designation of a new ORC and back-up ORC or (ii) a vacancy in the position of ORC or back-up ORC. The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143-215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143- 215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. The Permittee shall maintain a copy of the approved plans and specifications on file for the life of the facility. If you have any questions or need additional information, please contact Mark McIntire. telephone number (919) 733-5083, extension 553. Sincerely. err T. Stevens cc: Central Files 4101)1Mirt:Fil� Winston-Salem Regional Office, Water Quality Technical Assistance and Certification Unit NCDENR/DIVISION OF WATER QUALITY WATER QUALITY SECTION/NPDES UNIT NOVEMBER 15, 1999 MEMORANDUM TO: PERMIT FILE FROM: MARK MCINTIRE SUBJECT: DYNEGY/ROCKINGHAM POWER LLC — COMBUSTION TURBINE FACILITY Il+iiX i i = iCt 086665? ROCKINGHAM COUNTY As is summarized in other correspondence in the permit file, a request for public hearing was received for the above referenced facility. I forwarded a package summarizing public comment upwards through Division management on September 30, 1999. I received that package back on November 15, 1999. The decision was made not to hold a public meeting. As such, the NPDES permit was prepared with an issuance date of November 19, 1999. The information for the Authorization to Construct was reviewed and found to be satisfactory. As such, the ATC approving installation of an oil/water separator, bag filter, and piping and appurtenances was prepared and dated for November 19, 1999. NOTE: David Russell of the Winston-Salem Regional Office reviewed the draft documents and signed off on the project on August 3, 1999. Cc: Central Files 'I R S j J1 lit File,