HomeMy WebLinkAboutNC0077968_authorization to construct_20140514p9DFS find
Mr. Tim Horner
Homer Mobile Home Park
A To C No. 077968A01
August 19, 2013
Engineer's Certification
RECEIVED/DENR/DWR
MAY 1 4 2014
Water Resources
Permitting Section
#ark -Le r , as a duly registered Professional Engineer in
the State of North Carolina, having been authorized to observe (periodically/we)
the construction of the modifications and improvements to the Homer Mobile Home Park
WWTP, located on 3437 Shepard Road in Alamance County for Homer Mobile Home Park,
hereby state that, to the best of my abilities, due care and diligence was used in the observation
of the following construction:
Installation of a UV disinfection system consisting of two (2) UV banks each capable of
treating 90,000 gpd, an aote-Elialer, and awe, and vigibilculangs, in conformity with the project
plans, specifications, and other supporting data subsequently filed and approved by the
Department of Environment and Natural Resources., in conformity with the project plans,
specifications, and other supporting data subsequently filed and approved by the Department of
Environment and Natural Resources.
I certify that the construction of the above referenced project was observed to be built
within substantial compliance and intent of the approved plans and specifications. Par+- (.' e-f4;4 '
noL�-
Signature l�
Date 5' `I-1`l
Mail this Certification to:
7N,
Registration No. i g a 3 8
Ron Berry
DENR/DWR Water Quality Programs
1633 Mail Service Center
Raleigh, NC 27699-1633
OK
atu alley, Williams, carmen & king, inc.
May 9,2014
Engineering Architecture o Land Surveying
Mr. Ron Berry
DENR/DWR Water Quality Programs
North Carolina Department of Transportation,
1633 Mail Service Center
Raleigh, NC, 27699-1633
Subject: Partial Certification
Mr. Tim Horner Horner Mobile Home Park
A to C No. 077968A01
AWCK Project # 13048
RECEIVED/DENRJDWR
MAY 1 4 2014
Water Resources
Permitting Section
Dear Mr. Berry:
On behalf of the Mr. Horner, please find enclosed for your records the partial certification
for the subject project.
Mr. Horner has completed the installation of the UV banks as noted in the permit. He is
continuing construction on the auto dialer and alarms. A final certification will be
submitted once all items have be installed.
Should there be any questions concerning this submittal, please let me know.
Sincerely,
ALLEY, WILLIAMS, CARMEN & KING, INC.
744441,L
C. Mark Averette, P.E.
Enclosures
cc: Tim Homer, Owner
Jenny Graznak, NCDENR Winston-Salem
740 Chapel Hill Road (27215) P.O. Box 1179 • Burlington, North Carolina 27216
Tel. - (336) 226-5534 • Fax - (336) 226-3034 • awck.com
ESTABLISHED o 1960
A
mow®
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Resources
Water Quality Programs
Pat McCrory Thomas A. Reeder
Governor Director
August 19, 2013
Mr. Tim Horner
Homers Mobile Home Park
3073 Beaver Hills Drive
Burlington, North Carolina 27215
SUBJECT: Authorization to Construct
A to C No. 077968A01
Tim Horner
Homers Mobile Home Park
Dear Mr. Tim Horner:
John E. Skvarla, III
Secretary
A letter of request for an Authorization to Construct was received June 24, 2013, by the
Division of Water Resources (Division), and final plans and specifications for the subject project
have been reviewed and found to be satisfactory. Authorization is hereby granted for the
construction of modifications to the existing 0.04 MGD Homers Mobile Home Park WWTP,
with discharge of treated wastewater into the Reedy Fork Creek in the Cape Fear River Basin.
This authorization results in no increase in design or permitted capacity and is awarded
for the construction of the following specific modifications:
Installation of a UV disinfection system consisting of two (2) UV banks each capable of
treating 90,000 gpd, an auto dialer, and audible and visible alarms, in conformity with the
project plans, specifications, and other supporting data subsequently filed and approved
by the Department of Environment and Natural Resources.
The Permittee shall maintain on hand for immediate installation an adequate supply of
spare UV lamps.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of
NPDES Permit No. NC0077968 issued April 20, 2011, and shall be subject to revocation unless
the wastewater treatment facilities are constructed in accordance with the conditions and
limitations specified in Permit No. NC0077968.
The sludge generated from these treatment facilities must be disposed of in accordance
with G.S. 143-215.1 and in a manner approved by the Division.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604
Phone: 919-807-63001 FAX: 919-807-6492
Internet: www.ncwaterquality.org
fig
AUG 2 2 2013.
No thCarolma
Vaturalli
An Equal Opportunity1 Affirmative Action Employer
DENR-WATER QUALrrY
POINT SOURCE BRANCH
Mr. Tim Horner
August 19, 2013
Page 2
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by the Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
The Winston-Salem Regional Office, telephone number (336) 771-5000, shall be notified
at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from a professional engineer certifying that the permitted facility
has been installed in accordance with the NPDES Permit, this Authorization to Construct and the
approved plans and specifications. Mail the Certification to: DENR/DWR, 1617 Mail Service
Center, Raleigh, NC 27699-1617.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at
least equivalent to or greater than the classification assigned to the wastewater treatment
facilities by the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T15A:8G.0202.
A copy of the approved plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
During the construction of the proposed additions/modifications, the permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the project to be constructed in accordance
with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North
Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in complying with these Acts.
Mr. Tim Horner
August 19, 2013
Page 3
Prior to entering into any contract(s) for construction, the recipient must have obtained all
applicable permits from the State.
Failure to abide by the requirements contained in this Authorization to Construct may
subject the Permittee to an enforcement action by the Division in accordance with North
Carolina General Statute 143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed by
other government agencies (local, state, and federal) which have jurisdiction.
One (1) set of approved plans and specifications is being forwarded to you. If you have
any questions or need additional information, please contact Seth Robertson, P.E. at telephone
number (919) 707-9175.
Sincerely,
>f,k2
Thomas A. Reeder
MM:sr
cc: C. Mark Averette, P.E. Alley, Williams, Carmen and King, Inc.
Alamance County Health Department
DWR/WQ Programs Winston-Salem Regional Office, Surface Water Protection
DWR/WQ Programs, Point Source Branch, NPDES Program
Michelle McKay, E.I.
ATC File