Loading...
HomeMy WebLinkAboutNC0077968_authorization to construct_20140514p9DFS find Mr. Tim Horner Homer Mobile Home Park A To C No. 077968A01 August 19, 2013 Engineer's Certification RECEIVED/DENR/DWR MAY 1 4 2014 Water Resources Permitting Section #ark -Le r , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/we) the construction of the modifications and improvements to the Homer Mobile Home Park WWTP, located on 3437 Shepard Road in Alamance County for Homer Mobile Home Park, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of a UV disinfection system consisting of two (2) UV banks each capable of treating 90,000 gpd, an aote-Elialer, and awe, and vigibilculangs, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources., in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Par+- (.' e-f4;4 ' noL�- Signature l� Date 5' `I-1`l Mail this Certification to: 7N, Registration No. i g a 3 8 Ron Berry DENR/DWR Water Quality Programs 1633 Mail Service Center Raleigh, NC 27699-1633 OK atu alley, Williams, carmen & king, inc. May 9,2014 Engineering Architecture o Land Surveying Mr. Ron Berry DENR/DWR Water Quality Programs North Carolina Department of Transportation, 1633 Mail Service Center Raleigh, NC, 27699-1633 Subject: Partial Certification Mr. Tim Horner Horner Mobile Home Park A to C No. 077968A01 AWCK Project # 13048 RECEIVED/DENRJDWR MAY 1 4 2014 Water Resources Permitting Section Dear Mr. Berry: On behalf of the Mr. Horner, please find enclosed for your records the partial certification for the subject project. Mr. Horner has completed the installation of the UV banks as noted in the permit. He is continuing construction on the auto dialer and alarms. A final certification will be submitted once all items have be installed. Should there be any questions concerning this submittal, please let me know. Sincerely, ALLEY, WILLIAMS, CARMEN & KING, INC. 744441,L C. Mark Averette, P.E. Enclosures cc: Tim Homer, Owner Jenny Graznak, NCDENR Winston-Salem 740 Chapel Hill Road (27215) P.O. Box 1179 • Burlington, North Carolina 27216 Tel. - (336) 226-5534 • Fax - (336) 226-3034 • awck.com ESTABLISHED o 1960 A mow® NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Water Quality Programs Pat McCrory Thomas A. Reeder Governor Director August 19, 2013 Mr. Tim Horner Homers Mobile Home Park 3073 Beaver Hills Drive Burlington, North Carolina 27215 SUBJECT: Authorization to Construct A to C No. 077968A01 Tim Horner Homers Mobile Home Park Dear Mr. Tim Horner: John E. Skvarla, III Secretary A letter of request for an Authorization to Construct was received June 24, 2013, by the Division of Water Resources (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 0.04 MGD Homers Mobile Home Park WWTP, with discharge of treated wastewater into the Reedy Fork Creek in the Cape Fear River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Installation of a UV disinfection system consisting of two (2) UV banks each capable of treating 90,000 gpd, an auto dialer, and audible and visible alarms, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. The Permittee shall maintain on hand for immediate installation an adequate supply of spare UV lamps. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0077968 issued April 20, 2011, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0077968. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-807-6492 Internet: www.ncwaterquality.org fig AUG 2 2 2013. No thCarolma Vaturalli An Equal Opportunity1 Affirmative Action Employer DENR-WATER QUALrrY POINT SOURCE BRANCH Mr. Tim Horner August 19, 2013 Page 2 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Office, telephone number (336) 771-5000, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: DENR/DWR, 1617 Mail Service Center, Raleigh, NC 27699-1617. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Mr. Tim Horner August 19, 2013 Page 3 Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Seth Robertson, P.E. at telephone number (919) 707-9175. Sincerely, >f,k2 Thomas A. Reeder MM:sr cc: C. Mark Averette, P.E. Alley, Williams, Carmen and King, Inc. Alamance County Health Department DWR/WQ Programs Winston-Salem Regional Office, Surface Water Protection DWR/WQ Programs, Point Source Branch, NPDES Program Michelle McKay, E.I. ATC File