Loading...
HomeMy WebLinkAboutNCC223776_Site Plan or Location Map_20221108GENERAL CONDITIONS OF APPROVAL 1. ALL THIS SITE IS NOT IN ANY SPECIAL FLOOD HAZARD AREAS OR FUTURE CONDITIONS FLOOD HAZARD AREAS, AS SHOWN ON FIRM PANEL 0737 DATED MAY 2, 2006. 2. 50 FOOT WIDE UNDISTURBED STREAM BUFFER, MEASURED FROM TOP OF BANK, EACH SIDE OF STREAM. NO CLEARING OR GRADING OTHER THAN SELECTIVE THINNING AND ORDINARY MAINTENANCE OF EXISTING VEGETATION PERMITTED, EXCEPT IN ACCORDANCE WITH 15A NCAC 02B.233 (6) VEGETATION MANAGEMENT. NO STRUCTURES OR FEATURES REQUIRING GRADING OR CONSTRUCTION MAY BE BUILT WITHIN THE 10 FOOT STREAM BUFFER SETBACK. ANY USE ALLOWED BY SECTION 8.5.5 OF THE UDO SHALL BE DESIGNED AND CONSTRUCTED TO MINIMIZE THE AMOUNT OF INTRUSION INTO THE STREAM BUFFER AND TO MINIMIZE CLEARING, GRADING, EROSION AND WATER QUALITY DEGRADATION. (UDO SECTION 8.5). 3. STATE AND FEDERAL PERMIT AUTHORIZATION MAY BE REQUIRED FROM THE NC DENR, NC DWQ, AND THE U.S. ARMY CORPS OF ENGINEERS PRIOR TO THE COMMENCEMENT OF ANY LAND DISTURBING ACTIVITIES IN OR NEAR A LAKE, STREAM, CREEK, TRIBUTARY, OR ANY UNNAMED BODY OF WATER AND ITS ADJACENT WETLANDS (UDO SECTION 8.9) 4. 50 FOOT WIDE WETLAND BUFFER TO REMAIN IN NATURAL, UNDISTURBED VEGETATION. WETLAND BUFFERS MAY BE USED FOR PASSIVE RECREATIONAL ACTIVITIES, SUCH AS WALKING AND BICYCLING TRAILS, PROVIDED THAT SERVICE FACILITIES FOR SUCH ACTIVITIES, INCLUDING BUT NOT LIMITED TO PARKING, PICNICKING AND SANITARY FACILITIES, ARE LOCATED OUTSIDE OF THE WETLAND BUFFER. ANY USE ALLOWED BY THIS SECTION SHALL BE DESIGNED AND CONSTRUCTED TO MINIMIZE THE AMOUNT OF INTRUSION INTO THE WETLAND BUFFER AND TO MINIMIZE CLEARING, GRADING, EROSION AND WATER QUALITY DEGRADATION. (UDO SECTIONS 8.9) 5. PINE STRAW SHALL NOT BE USED AS MULCH OR GROUNDCOVER WITHIN TEN FEET OF ANY STRUCTURES CONSISTING OF EXTERIOR COMBUSTIBLE CONSTRUCTION AS SPECIFIED BY DURHAM CITY CODE SECTION 46-87. 6. ALL SITE IMPROVEMENTS, INCLUDING LANDSCAPING, MUST BE IN PLACE PRIOR TO THE ISSUANCE OF A CERTIFICATE OF COMPLIANCE. CONTACT THE DURHAM CITY -COUNTY PLANNING DEPARTMENT SITE COMPLIANCE STAFF TO SCHEDULE AN INSPECTION. SITE COMPLIANCE INSPECTION FEES MUST BE RECEIVED BY THE DURHAM CITY -COUNTY PLANNING DEPARTMENT PRIOR TO SCHEDULING AN INSPECTION. IF A RE -INSPECTION IS REQUIRED, AN ADDITIONAL INSPECTION FEE MUST BE RECEIVED BY THIS OFFICE PRIOR TO THE RE -INSPECTION. 7. STREET TREES MEETING THE REQUIREMENTS OF UDO SECTION 9.6 SHALL BE PLANTED PRIOR TO THE ISSUANCE OF A CERTIFICATE OF COMPLIANCE, UNLESS THE PLANTING HAS BEEN POSTPONED IN ACCORDANCE WITH THE REQUIREMENTS OF UDO SECTION 9.11. 8. YARD TREES MEETING THE REQUIREMENTS OF UDO SECTIONS 7.1.2C AND 6.8.2C SHALL BE PLANTED PRIOR TO THE ISSUANCE OF A CERTIFICATE OF COMPLIANCE, UNLESS THE PLANTING HAS BEEN POSTPONED IN ACCORDANCE WITH THE REQUIREMENTS OF UDO SECTION 9.11. 9. 25 FOOT WIDE UNDISTURBED LANDSCAPE BUFFER. NO CLEARING OR GRADING OTHER THAN SELECTIVE THINNING AND ORDINARY MAINTENANCE OF EXISTING VEGETATION PERMITTED. 10. CONSTRUCTION IN PRESERVED TREE COVERAGE AREAS (UDO SECTION 8.3): A. PRESERVED TREE COVERAGE AREAS SHALL NOT BE USED FOR ACTIVE RECREATIONAL PURPOSES, EXCEPT FOR UNPAVED WALKING PATHS AND FOOT TRAILS CONSTRUCTED WITH MINIMAL DISTURBANCE OF TREE ROOTS AND EXISTING VEGETATION. NO TREE EIGHT INCHES OR GREATER SHALL BE REMOVED FOR THE CONSTRUCTION OF TRAILS. SITE PLAN APPROVAL IS REQUIRED FOR CONSTRUCTION OF TRAILS IN PRESERVED TREE COVERAGE AREAS. B. ALL BUILDINGS, UTILITIES, AND STORMWATER FACILITIES SHALL BE SET BACK AT LEAST 10 FEET FROM THE EDGE OF ANY PRESERVED TREE COVERAGE AREA. NO EASEMENTS, EXCEPT CONSERVATION, GREENWAY, AND LANDSCAPE EASEMENTS, SHALL BE INCLUDED WITHIN A TREE COVERAGE AREA. 12. TREE PROTECTION FENCE CONSTRUCTED OF A MATERIAL RESISTANT TO DEGRADATION BY SUN, WIND, AND MOISTURE FOR THE DURATION OF THE CONSTRUCTION, MUST BE IN PLACE PRIOR TO ANY DEMOLITION, LAND DISTURBANCE, OR ISSUANCE OF A GRADING PERMIT. SUCH FENCING SHALL BE MOUNTED ON METAL POSTS PLACED NO FURTHER THAN 10 FEET APART. SILT FENCING SHALL NOT SERVE AS TREE PROTECTION FENCING. WARNING SIGNS SHALL BE POSTED AT EACH END OF THE TREE PROTECTION FENCE WITH PERIMETER SIGNS SPACED A MAXIMUM OF 100 FEET ON CENTER THEREAFTER. EACH SIGN SHALL READ: "NO TRESPASSING/TREE PROTECTION AREA" AND "PROHIBIDO ENTRAR / ZONA PROTECTORA PARA LOS ARBOLES." 12. ROOT PROTECTION ZONE SHALL BE ESTABLISHED AROUND ALL TREES TO BE PRESERVED. THE ROOT PROTECTION ZONE SHALL EITHER BE A SIX-FOOT RADIUS AROUND A TREE OR ONE FOOT OF RADIUS FOR EVERY INCH OF DIAMETER AT BREAST HEIGHT (DBH) OF EXISTING TREES, WHICHEVER IS GREATER. 13. AT THE START OF GRADING INVOLVING THE LOWERING OF EXISTING GRADE AROUND A TREE OR STRIPPING OF TOPSOIL, A CLEAN, SHARP, VERTICAL CUT SHALL BE MADE AT THE EDGE OF THE TREE SAVE AREA PRIOR TO OR AT THE SAME TIME AS OTHER EROSION CONTROL MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THIS CUT FARTHEST AWAY FROM THE TREE TRUNK AND SHALL REMAIN IN PLACE UNTIL ALL CONSTRUCTION IN THE VICINITY OF THE TREES IS COMPLETE. NO STORAGE OF MATERIALS, DUMPING OF WASTE, FILL, OR PARKING OF EQUIPMENT SHALL BE ALLOWED WITHIN THE ROOT PROTECTION ZONE AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE ROOT PROTECTION ZONE. 14. UDO SITE LIGHTING NOTE (UDO SEC. 7.4) A. THE MAXIMUM ILLUMINATION PERMITTED AT THE END OF A PROPERTY LINE SHALL BE AS SET FORTH BELOW. WHERE A DEVELOPMENT IS UNIFIED WITH SHARED PARKING OR OTHER MEASURE SHOWN ON A SITE PLAN, THE MAXIMUM ILLUMINATION LEVELS SHALL APPLY ONLY TO THE EXTERIOR LOT LINES OF THE PROJECT (ANY INTERIOR LOT LINES SHALL BE EXEMPT FROM THIS PARAGRAPH). 1. THE MAXIMUM ILLUMINATION AT THE EDGE OF THE PROPERTY LINE ADJACENT TO RESIDENTIAL ZONING IS 0.5 FOOT CANDLES. 2. THE MAXIMUM ILLUMINATION AT THE EDGE OF THE PROPERTY LINE ADJACENT TO NONRESIDENTIAL ZONING IS 5.0 FOOT CANDLES. 3. THE MAXIMUM ILLUMINATION AT THE EDGE OF THE PROPERTY LINE ADJACENT TO A STREET IS 5.0 FOOT-CANDLES. B. THE LEVEL OF ILLUMINATION AS MEASURED IN FOOT-CANDLES AT ANY ONE POINT SHALL MEET THE STANDARDS IN THE TABLE IN UDO SECTION 7.4 WITH MINIMUM AND MAXIMUM LEVELS MEASURED ON THE PAVEMENT WITHIN THE LIGHTED AREA. C. THE MAXIMUM HEIGHT FOR DIRECTIONAL OR FULL CUT-OFF LIGHTING FIXTURES (FIXTURES DESIGNED TO INSURE THAT NO LIGHT IS EMITTED ABOVE A HORIZONTAL LINE PARALLEL TO THE GROUND) SHALL BE 30 FEET ABOVE GRADE. D. THE MAXIMUM HEIGHT FOR NON -DIRECTIONAL LIGHTING FIXTURES, WHICH ARE DEFINED AS FIXTURES DESIGNED TO ALLOW LIGHT TO BE EMITTED ABOVE A HORIZONTAL LINE PARALLEL TO THE GROUND, SHALL BE 15 FEET ABOVE GRADE. NON -DIRECTIONAL LIGHTING FIXTURES SHALL BE TRANSLUCENT OR HAVE BAFFLES TO PREVENT VIEWS OF THE LIGHT SOURCE. E. UNDER -CANOPY LIGHTING SHALL BE RESTRICTED TO LIGHTING FIXTURES (INCLUDING LENSES) THAT DO NOT PROJECT BELOW THE BOTTOM OF THE CANOPY. F. LIGHTING SHALL BE ORIENTED NOT TO DIRECT GLARE OR EXCESSIVE ILLUMINATION ONTO STREETS IN A MANNER THAT MAY DISTRACT OR INTERFERE WITH THE VISION OF DRIVERS ON SUCH STREETS. G. THESE STANDARDS MUST BE VERIFIED BY FIELD SURVEY (BY USE OF PHOTO METRIC SURVEY) PRIOR TO THE CERTIFICATE OF COMPLIANCE BEING ISSUED. ALL OF THIS INFORMATION, INCLUDING DETAILS, WILL BE REQUIRED ON BUILDING PLANS PRIOR TO ISSUANCE OF A BUILDING PERMIT. 15. FOR COUNTY SOIL AND EROSION CONTROL A. A SEDIMENTATION AND EROSION CONTROL PLAN MUST BE SUBMITTED AND APPROVED PRIOR TO THE ISSUANCE OF A LAND -DISTURBANCE PERMIT. B. IF AN OFFSITE SOIL SPOIL OR BORROW SITE IS UTILIZED, THEN THE DISTURBED AREA FOR THE SPOIL/BORROW SITE MUST BE INCLUDED IN THE LAND -DISTURBANCE PLAN AND PERMIT UNLESS THE SPOIL/BORROW SITE ALREADY HAS A LAND -DISTURBANCE PERMIT. 16. THE WORK TAKING PLACE RELATED TO THE CHANGES IN THIS SITE PLAN WILL BE FULLY COMPLIANT WITH THE NORTH CAROLINA ACCESSIBILITY CODES (ANSI 117.1-2009 AND CHAPTER 11 OF THE NCBC) UNLESS AND EXCEPT IN AREAS WHERE AN APPROVED STATEMENT FROM A SITE ENGINEER, SURVEYOR OR ARCHITECT VERIFIES THAT SITE CONDITIONS EXIST WHERE THE TOPOGRAPHY OF THE SITE IS EXTREME AND ONLY ALTERNATE METHODS OF COMPLIANCE ARE POSSIBLE. A SEALED AS -BUILT SURVEY OF THE SITE, PERFORMED BY THE DESIGN PROFESSIONAL OR DESIGNEE, MUST BE SUBMITTED TO THE BUILDING INSPECTIONS DEPARTMENT CERTIFYING THAT ALL SITE ACCESSIBILITY CODE REQUIREMENTS SUCH AS CURB CUTS, RAMP SLOPES, MEET THE REQUIREMENTS OF THE NC ACCESSIBILITY CODES PRIOR TO CO ISSUANCE. 17. IN THE EVENT OF COMPACTOR FAILURE, THE OWNER/MANAGER SHALL PROVIDE COLLECTION OF NON -COMPACTED GARBAGE AS FREQUENTLY AS NECESSARY TO ADEQUATELY SERVE THE COMMUNITY AND PREVENT THE ILLEGAL PLACEMENT OR DISPOSAL OF GARBAGE AND RECYCL.ABLES. 18. SOLID WASTE CONTAINMENT CAPACITY AND COLLECTION FREQUENCY WILL BE SUFFICIENT TO PREVENT ILLEGAL PLACEMENT OF TRASH AND RECYCL.ABLES. SPECIAL CONDITIONS OF APPROVAL 1. ALL UTILITIES MUST BE INSTALLED UNDERGROUND. 2. SITE WILL BE MASS GRADED. 3. TREE REPLACEMENT AREAS SHALL BE PLANTED BEFORE A CERTIFICATE OF COMPLIANCE IS ISSUED, UNLESS THE PLANTING HAS BEEN DEFERRED TO AN APPROPRIATE SEASON IN ACCORDANCE WITH THE REQUIREMENTS OF PARAGRAPH 9.11.2, EXTENSIONS FOR ALL OTHER DEVELOPMENT (SECTION 8.3.1.E.9.). 4. ALL DEVELOPMENT ON THIS PLAN THAT IS LOCATED WITHIN THE FLOODPLAIN WILL REQUIRE THE FOLLOWING BEFORE HOLDS WILL BE RELEASED AND COS ARE GIVEN: -AS-BUILTS AFTER COMPLETION -A FLOODPLAIN SITE INSPECTION -FINAL FLOODPLAIN PERMIT CLOSEOUT 5. PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY: INSTALL A BUS SHELTER PAD, BUS SHELTER AND AMENITIES AT THE PROPOSED TRANSIT STOP ALONG THE SOUTH SIDE OF T.W. ALEXANDER DRIVE TO GODURHAM/GOTRIANGLE SPECIFICATIONS. 6. PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY: A MINIMUM 5 FT. OF ADDITIONAL ASPHALT WILL BE PROVIDED FOR THE FULL FRONTAGE OF THE SITE ALONG T.W. ALEXANDER DRIVE AS WELL AS LOUIS STEPHENS DRIVE. THE ADDITIONAL ASPHALT WIDENING WILL BE PROVIDED TO ALLOW FOR A BICYCLE LANE. 7. PRIOR TO THE ISSUANCE OF A BUILDING PERMIT: DEDICATE A PUBLIC ACCESS EASEMENT FOR THE SIDEWALK LOCATED OUTSIDE OF THE RIGHT-OF-WAY FOR THE FRONTAGE OF THE SITE ALONG SOLUTIONS DRIVE. A COPY OF THE RECORDED PLAT MUST BE SUBMITTED WITH THE FIRST BUILDING PERMIT APPLICATION. 8. PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY, CONSTRUCT A CONCRETE MEDIAN ON LOUIS STEPHENS DRIVE AT THE SITE DRIVEWAY TO PROHIBIT LEFT TURNS FROM THE SITE. TEXT COMMITMENTS (CASE #Z2000015) 1. THE PROPOSED DEVELOPMENT WILL BE LIMITED TO MULTI -FAMILY RESIDENTIAL AND ACCESSORY USES. 2. THE MAXIMUM NUMBER OF MULTI -FAMILY UNITS TO BE DEVELOPED ON THE SITE WILL BE 176 UNITS. 3. THE MAXIMUM ALLOWED BUILDING HEIGHT SHALL BE 50 FEET. 4. PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY: SUBJECT TO A DETERMINATION BY GODURHAM AND GOTRIANGLE ON THE NEED FOR TRANSIT RELATED IMPROVEMENTS AT THE TIME OF SITE PLAN SUBMITTAL, CONSTRUCT A BUS PULIIOUT AND A CONCRETE PAD/BUS SHELTER TO GODURHAM/GOTRIANGLE SPECIFICATIONS ALONG THE SOUTH SIDE OF TW ALEXANDER DRIVE. 5. PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY: A MINIMUM 5 FT. OF ADDITIONAL ASPHALT WILL BE PROVIDED FOR THE FULL FRONTAGE OF THE SITE ALONG T.W. ALEXANDER DRIVE AS WELL AS LOUIS STEPHENS DRIVE. THE ADDITIONAL ASPHALT WIDENING WILL BE PROVIDED TO ALLOW FOR A BICYCLE LANE. 6. THE SITE WILL CONTAIN A MINIMUM OF FOUR (4) ELECTRIC VEHICLE CHARGING STATIONS. 7. RECREATIONAL OPEN SPACE PROVIDED WILL CONTAIN, AT A MINIMUM, EACH OF THE FOLLOWING: a. CLUBHOUSE AND POOL. b. DOG PARK(s) TOTALING AT LEAST 10,890 S.F. IN SIZE. 8. SITE DRIVE #1 WILL BE MEDIAN -DIVIDED WITH LANDSCAPED CENTER ISLAND. 9. PRIOR TO THE ISSUANCE OF THE 1ST CERTIFICATE OF OCCUPANCY: A ONE TIME PAYMENT OF $26,400 WILL BE MADE TO THE CITY OF DURHAM AFFORDABLE HOUSING FUND. 10. PRIOR TO THE ISSUANCE OF THE 1ST CERTIFICATE OF OCCUPANCY: A ONE TIME PAYMENT OF $18,500 WILL BE MADE TO THE DURHAM PUBLIC SCHOOLS. ALEXANDER CROSSING CONSTRUCTION DRAWINGS EROSION CONTROL PERMIT PUBLIC WORKS CONDITIONS OF APPROVAL 1. THE DESIGNING PROFESSIONAL (A NCPE, NCPLS OR NCRLA/NCPLA - AS REQUIRED) SHALL SUBMIT THREE (3) SETS OF CONSTRUCTION DRAWINGS TO THE PUBLIC WORKS DEPARTMENT - DEVELOPMENT REVIEW FOR REVIEW AND APPROVAL. CONSTRUCTION DRAWING APPROVAL IS REQUIRED PRIOR TO COMMENCING CONSTRUCTION (SEE CONSTRUCTION PLAN APPROVAL PROCESS). THE APPROVAL OF CONSTRUCTION DRAWINGS IS SEPARATE FROM SITE PLAN APPROVAL. CITY OFFICIALS SHALL REVIEW ALL SIZES, MATERIALS, SLOPES, LOCATIONS, EXTENSIONS AND DEPTHS FOR ALL PROPOSED UTILITIES (WATERLINES, SANITARY SEWER LINES AND STORM DRAINAGE CONVEYANCE SYSTEMS) FOR COMPLIANCE WITH ALL APPLICABLE REGULATORY STANDARDS, SPECIFICATIONS, AND BEST MANAGEMENT PRACTICES. 2. THE DESIGNING PROFESSIONAL (A NCPE, NCPLS OR NCRLA/NCPLA - AS REQUIRED) SHALL SUBMIT ONE (1) SET OF AS -BUILT DRAWINGS TO THE PUBLIC WORKS DEPARTMENT - DEVELOPMENT REVIEW FOR REVIEW AND APPROVAL. AS -BUILT DRAWING APPROVAL IS REQUIRED PRIOR TO WATER METER INSTALLATION AND/OR SANITARY SEWER SERVICE CONNECTION AND PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. 3. FIRE FLOW ANALYSIS REQUIRED FOR REVIEW AND APPROVAL AS PART OF THE CONSTRUCTION DRAWING APPROVAL PROCESS. TO SCHEDULE A FLOW TEST OR TO OBTAIN CURRENT SYSTEM DATA, COMPLETE THE ONLINE APPLICATION AT HTTP: //CODINETX.DURHAMNC.GOV/SITES/PUBLICWORKS/SITEPAGES/FIRE % 2OFLOW % 2OREQUEST.ASPX. 4. IF A METER 2" OR LARGER IS PROPOSED, CONTACT WATER MANAGEMENT AT 919-560-4381 PRIOR TO THE CONSTRUCTION OF THE METER VAULT TO VERIFY THE TYPE AND DIMENSIONS OF THE METER. 5. WATER PERMIT REQUIRED AFTER CONSTRUCTION DRAWING APPROVAL AND PRIOR TO COMMENCING WATER MAIN INSTALLATION. 6. SEWER PERMIT REQUIRED AFTER CONSTRUCTION DRAWING APPROVAL AND PRIOR TO COMMENCING SANITARY SEWER MAIN INSTALLATION. 7. SEWER PERMIT FROM DURHAM COUNTY REQUIRED. CONTACT DURHAM COUNTY UTILITY DIVISION AT 919-560-9033. 8. AN NCDOT OR CITY OF DURHAM DRIVEWAY PERMIT IS REQUIRED. 9. CENTERLINE OF 30 FOOT WIDE CITY OF DURHAM SANITARY SEWER EASEMENT. SUBJECT TO TERMS STATED IN THE DECLARATION IN REAL ESTATE BOOK 1510, PAGE 958. NO STRUCTURES, FILL, EMBANKMENTS, TREES OR OBSTRUCTIONS PERMITTED WITHIN THE EASEMENT EXCEPT ACCORDING TO THOSE TERMS. 10. THE LOCATION OF THE SIDEWALKS SHOWN ON THIS PLAN IS SCHEMATIC. A CITY OF DURHAM AND/OR NCDOT ENCROACHMENT PERMIT IS REQUIRED PRIOR TO ANY CONSTRUCTION. AFTER OBTAINING THE REQUIRED PERMITS, PLEASE CONTACT THE CITY OF DURHAM ENGINEERING CONSTRUCTION INSPECTION OFFICE AT 919-560-4326 FOR A PRE -CONSTRUCTION CONFERENCE AND FIELD VISIT PRIOR TO ANY WORK ON THE PROPOSED SIDEWALK. 11. A CITY OF DURHAM DRIVEWAY PERMIT IS REQUIRED PRIOR TO ANY DRIVEWAY CONSTRUCTION ON PUBLIC RIGHT-OF-WAY. SUBMIT PLANS FOR DRIVEWAY PERMIT APPROVAL TO THE DURHAM DEVELOPMENT SERVICES CENTER PUBLIC WORKS DESK. AFTER OBTAINING THE PERMIT, PLEASE CALL CITY OF DURHAM ENGINEERING INSPECTION OFFICE AT 919-560-4326 PRIOR TO START OF CONSTRUCTION. [OR] NCDOT DRIVEWAY PERMIT REQUIRED PRIOR TO CONSTRUCTION. CONTACT NCDOT AT 919-220-4750 FOR REQUIREMENTS. 12. TOWNHOME DEVELOPMENTS MAY BE DESIGNED AND CONSTRUCTED WITH PARKING AREAS ON BOTH SIDES OF THE TRAVEL LANES. THIS CONFIGURATION IS NOT TO BE CONSIDERED A STREET. IF THIS OPTION IS USED, THE TRAVEL AND PARKING AREAS SHALL BE NOTED AS "PRIVATE ACCESS AND COMMON AREAS". AS SUCH, THE DEVELOPER SHALL ACKNOWLEDGE AND MAKE PROSPECTIVE BUYERS AWARE THAT THESE AREAS WILL NOT BE ASSIGNED A STREET NAME, NOR WILL THEY EVER BE ELIGIBLE FOR MAINTENANCE BY THE CITY OF DURHAM. THE DEVELOPER WILL ENSURE THAT ALL OF THE ACCESS AND COMMON AREA PROPERTY IS DESCRIBED IN THE COVENANTS AND THAT THE HOME OWNERS ASSOCIATION IS RESPONSIBLE FOR THE MAINTENANCE OF THIS AREA. THE FOLLOWING NOTE SHALL BE ADDED TO ALL SITE PLANS AND PLATS ASSOCIATED WITH THE DEVELOPMENT: THE DRIVING AND PARKING AREAS SHOWN ON THIS DRAWING NOTED AS "PRIVATE ACCESS AND COMMON AREAS" DO NOT MEET CITY OF DURHAM STREET STANDARDS. THE FEATURES WITHIN THIS AREA ARE PRIVATE AND WILL NEVER BE ELIGIBLE FOR PUBLIC MAINTENANCE. 13. A UTILITY MAINLINE CONSTRUCTION PERMIT IS REQUIRED PRIOR TO THE INSTALLATION OF EACH UTILITY. ALL UTILITIES SHALL SUBMIT PLAN DRAWINGS AND APPLICATIONS TO THE CITY ENGINEERING DIVISION. 14. ABANDONMENT OF WATER SERVICES SHALL INCLUDE EXCAVATING DOWN TO CORPORATION STOP, TURNING IT OFF, AND CUTTING SERVICE LINE FREE FROM CORPORATION STOP. THE METER, IF PRESENT, SHALL BE RETURNED TO CITY OF DURHAM. PRIOR TO ANY CREDIT OR REFUND BEING PROCESSED THE METER MUST BE RETURNED TO WATER MANAGEMENT DEPARTMENT AND THE METER NUMBER VERIFIED AND CODED PROPERLY AS RETURNED. UTILITY SERVICE ABANDONMENTS WILL TAKE PLACE PRIOR TO BEGINNING UTILITY CONSTRUCTION WORK FOR A PROJECT. ANY EXCAVATION AS PART OF ABANDONING UTILITIES WILL REQUIRE BACKFILLING PER CITY OF DURHAM STANDARDS. 15. ABANDONMENT OF SANITARY SEWER SERVICE LINES SHALL CONSIST OF EXCAVATING DOWN TO THE SERVICE CONNECTION TO THE MAIN, CUTTING THIS CONNECTION, AND INSTALLING A WATERTIGHT PLUG IN THE MAIN. THE SERVICE LINE AND ALL CLEAN -OUT RISERS ON THE SERVICE LINE SHALL BE REMOVED. UTILITY SERVICE ABANDONMENTS WILL TAKE PLACE PRIOR TO BEGINNING UTILITY CONSTRUCTION WORK FOR A PROJECT. ANY EXCAVATION AS PART OF ABANDONING UTILITIES WILL REQUIRE BACKFILLING PER CITY OF DURHAM STANDARDS. 16. 1. HORIZONTAL AND VERTICAL SEPARATION A. SANITARY SEWERS SHALL BE LAID AT LEAST 10 FEET HORIZONTALLY FROM ANY EXISTING OR PROPOSED WATER MAIN. THE DISTANCE SHALL BE MEASURED EDGE TO EDGE. IN CASES WHERE IT IS NOT PRACTICAL TO MAINTAIN A 10-FOOT SEPARATION, THE CITY OF DURHAM MAY ALLOW DEVIATION ON A CASE -BY -CASE BASIS, IF SUPPORTED BY DATA FROM THE DESIGN ENGINEER. SUCH DEVIATION MAY ALLOW THE INSTALLATION OF THE SANITARY SEWER CLOSER TO A WATER MAIN, PROVIDED THAT THE WATER MAIN IS IN A SEPARATE TRENCH OR ON AN UNDISTURBED EARTH SHELF LOCATED ON ONE SIDE OF THE SANITARY SEWER AND AT AN ELEVATION SO THE BOTTOM OF THE WATER MAIN IS AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER. B. IF IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS DESCRIBED ABOVE OR ANYTIME THE SANITARY SEWER IS OVER THE WATER MAIN, BOTH THE WATER MAIN AND SANITARY SEWER MUST BE CONSTRUCTED OF FERROUS PIPE COMPLYING WITH THE PUBLIC WATER SUPPLY DESIGN STANDARDS AND BE PRESSURE TESTED TO 150 PSI TO ASSURE WATER -TIGHTNESS BEFORE BACKFILLING. C. A 24-INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND SANITARY SEWER LINES OR FERROUS PIPE SPECIFIED. A 12-INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND WATER MAINS. D. IF A 12-INCH VERTICAL SEPARATION IS NOT MAINTAINED AT A CROSSING BETWEEN STORM SEWER AND WATER MAINS (OR PRESSURE SEWERS), THE WATER MAIN SHALL BE CONSTRUCTED OF FERROUS PIPE AND A CONCRETE COLLAR SHALL BE POURED AROUND WATER MAINS AND STORM SEWER TO IMMOBILIZE THE CROSSING. 2. CROSSINGS A. SANITARY SEWER CROSSING WATER MAINS SHALL BE LAID TO PROVIDE A MINIMUM VERTICAL DISTANCE OF 18 INCHES BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF THE SANITARY SEWER. THE CROSSING SHALL BE ARRANGED SO THAT THE SANITARY SEWER JOINTS WILL BE EQUIDISTANT AND AS FAR AS POSSIBLE FROM THE WATER MAIN JOINTS. B. WHEN IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS STIPULATED ABOVE, ONE OF THE FOLLOWING METHODS MUST BE SPECIFIED. I. THE SANITARY SEWER SHALL BE DESIGNED AND CONSTRUCTED OF FERROUS PIPE AND SHALL BE PRESSURE TESTED AT 150 PSI TO ASSURE WATER -TIGHTNESS PRIOR TO BACKFILLING, OR II. EITHER THE WATER MAIN OR THE SANITARY SEWER LINE MAY BE ENCASED IN A WATERTIGHT CARRIER PIPE, WHICH EXTENDS 10-FEET ON BOTH SIDES OF THE CROSSING, MEASURED PERPENDICULAR TO THE WATER MAIN. THE CARRIER PIPE SHALL BE OF MATERIALS APPROVED BY THE CITY OF DURHAM FOR USE IN WATER MAIN CONSTRUCTION. 17. AT A MINIMUM, THE STORMWATER DESIGN DETAILS FOR THIS PROJECT SHALL BE GOVERNED BY THE MINIMUM STANDARDS OF THE MOST RECENT EDITION OF THE CITY OF DURHAM REFERENCE GUIDE FOR DEVELOPMENT (RGD) AND ANY LETTERS TO INDUSTRY POSTED ON THE CITY'S WEBSITE THAT ARE IN EFFECT THE DATE CONSTRUCTION DRAWINGS ARE FIRST RECEIVED FOR REVIEW BY THE CITY. 18. FINAL DESIGN CALCULATIONS FOR THE STORMWATER CONTROL MEASURE(S) (SCM(S)) REQUIRE THE USE OF STORAGE INDICATION ROUTING METHODOLOGY SUCH AS TR-20 OR HEC-1 MODELS. FOR EACH SCM, AS APPLICABLE, STAGE -STORAGE RELATIONSHIP AND INFLOW AND OUTFLOW HYDROGRAPHS ARE REQUIRED. ALL TABULATED DATA INCLUDING CALCULATIONS SHOWING THE LIMITING DISCHARGE, WHETHER ORIFICE, WEIR, BARREL, OR OUTLET CONTROL, AS APPROPRIATE IS REQUIRED. HYDROCAD, HYDRAFLOW HYDROGRAPHS, AND PONDPACK ARE COMMONLY USED AND RECOGNIZED SOFTWARE PROGRAMS WHICH INCORPORATE ROUTING METHODOLOGY ACCEPTED BY THE CITY. 19. USE FOR MULTIFAMILY AND OTHER TYPE DEVELOPMENTS: A. STORMWATER CONTROL MEASURE(S) (SCM(S)) PERMIT FEE(S) AND EITHER A PAYMENT INTO THE STORMWATER FUND OR THE PROVISION OF AN ALTERNATE SECURITY ARE REQUIRED FOR ALL SCM(S) ASSOCIATED WITH THIS DEVELOPMENT. CONSTRUCTION OF THE DEVELOPMENT IS NOT ALLOWED TO COMMENCE UNTIL THESE ITEMS ARE PROVIDED IN ACCORDANCE WITH CITY STORMWATER STANDARDS OR IN ACCORDANCE WITH WRITTEN POLICY. THE DESIGNER SHALL SUBMIT A SEALED ENGINEER'S CONSTRUCTION COST ESTIMATE FOR EVERY SCM PROPOSED IN THE DEVELOPMENT PRIOR TO APPROVAL OF THE CONSTRUCTION DRAWINGS IF A FINANCIAL GUARANTEE IN THE FORM OF PAYMENT INTO THE STORMWATER REPLACEMENT FUND IS UTILIZED. B. AN AS -BUILT CERTIFICATION FOR THE STORMWATER CONTROL MEASURE(S) (SCM(S)), PROVIDED BY THE CERTIFYING ENGINEER, IS REQUIRED. THE AS -BUILT CERTIFICATION SHALL BE SUBMITTED IN ACCORDANCE WITH THE CITY OF DURHAM SCM AS -BUILT PROGRAM; REFER TO SECTION 8.6, AS -BUILT CERTIFICATION REQUIREMENTS FOR SCM(S) IN THE CITY OF DURHAM, OF THE REFERENCE GUIDE FOR DEVELOPMENT. THE SCM AS -BUILT CERTIFICATION(S) SHALL BE APPROVED BY THE STORMWATER DEVELOPMENT REVIEW SECTION PRIOR TO ISSUANCE OF ANY FINAL CERTIFICATES OF OCCUPANCY/COMPLIANCE FOR DEVELOPMENT, WITH THE EXCEPTION OF WHEN AN APPROPRIATE CONSTRUCTION SECURITY HAS BEEN PROVIDED FOR SINGLE FAMILY OR TOWNHOME DEVELOPMENT. WITH THIS PROVIDED CONSTRUCTION SECURITY, CERTIFICATES OF OCCUPANCY/COMPLIANCE CAN BE ISSUED FOR A PERCENTAGE OF SINGLE FAMILY LOTS IN ACCORDANCE WITH CITY REQUIREMENTS. C. STORMWATER CONTROL MEASURE(S) (SCM(S)) DESIGN CALCULATIONS WILL NOT BE REVIEWED OR APPROVED WITH THE SITE PLAN/PRELIMINARY PLAT SUBMITTAL. ALL SCM DESIGNS WILL BE REVIEWED AND APPROVED DURING THE CONSTRUCTION DRAWING SUBMITTAL PROCESS. IF, AT THE TIME OF CONSTRUCTION DRAWING SUBMITTAL, IT IS FOUND THAT THE PROPOSED SCM(S) IS UNDERSIZED, NOT PROPERLY ACCESSIBLE, OR OTHERWISE INSUFFICIENT OR UNSUITABLE FOR THE SITE, IT IS THE RESPONSIBILITY OF THE APPLICANT TO INSURE THAT THE APPLICABLE STORMWATER ORDINANCE REQUIREMENTS ARE MET. A REVISED SITE PLAN OR PRELIMINARY PLAT MAY BE REQUIRED IF THE ORIGINALLY PROPOSED SCM(S) ARE FOUND INSUFFICIENT, NOT PROPERLY ACCESSIBLE, OR UNSUITABLE AND ALTERNATIVE SCM(S) WITH ASSOCIATED EASEMENTS ARE REQUIRED. D. THE DEVELOPER/CONTRACTOR SHALL SCHEDULE A PRECONSTRUCTION MEETING WITH THE STORMWATER DEVELOPMENT REVIEW SECTION PRIOR TO COMMENCING WORK ON ANY STORMWATER CONTROL MEASURE (SCM). IF THE SCM WILL BE CONSTRUCTED INITIALLY AS A SEDIMENTATION AND EROSION CONTROL (S&EC) DEVICE, TO BE CONVERTED TO A PERMANENT SCM AT A LATER TIME, THE PRECONSTRUCTION MEETING SHOULD BE SCHEDULED PRIOR TO CONSTRUCTION OF THE S&EC DEVICE. CALL 919-560-4326 EXT. 30238 TO SCHEDULE THE REQUIRED MEETING A MINIMUM OF THREE BUSINESS DAYS PRIOR TO THE DESIRED MEETING DATE. THIS IS IN ADDITION TO OTHER PRECONSTRUCTION MEETING REQUIREMENTS FOR EROSION CONTROL, ENGINEERING INSPECTIONS, ETC. 20. TO RECEIVE SITE PLAN/PRELIMINARY PLAT APPROVAL FOR DEVELOPMENTS OTHER THAN SINGLE-FAMILY DETACHED, TOWNHOME, AND DUPLEX RESIDENTIAL DEVELOPMENTS THAT ARE MAKING USE OF NUTRIENT BANKS OR NCEEP, THE APPROVAL OF THE SITE PLAN/PRELIMINARY PLAT IS CONTINGENT UPON THE PURCHASE OF NUTRIENT CREDITS. IF A REVISED SITE PLAN/PRELIMINARY PLAT IS SUBMITTED FOR THIS DEVELOPMENT, THE REVISED SITE PLAN/PRELIMINARY PLAT WILL BE SUBJECT TO ANY ORDINANCES IN PLACE AT THE TIME OF THE REVISED SITE PLAN/PRELIMINARY PLAT SUBMISSION. PRIOR TO THE APPROVAL OF THE SITE PLAN/PRELIMINARY PLAT, A LETTER/RECEIPT SHOWING THE PURCHASE OF THE NUTRIENT CREDITS FOR THIS DEVELOPMENT AND A COPY OF THE NUTRIENT BANK LEDGER IF APPLICABLE, SHOWING THE TOTAL NUTRIENT CREDITS AVAILABLE MINUS ANY AND ALL DEDUCTIONS, IS TO BE PROVIDED TO THE STORMWATER DEVELOPMENT REVIEW SECTION. DESIGN COMMITMENTS (CASE #Z2000015) 1. DESCRIPTION OF PROPOSED ARCHITECTURE THE BUILDING FRONT ELEVATIONS WILL EACH CONTAIN A MINIMUM OF 10 % BRICK OR NATURAL/SYNTHETIC STONE VENEER MATERIAL.THE REMAINING AREA TO BE A COMBINATION OF HARDIEPLANK FIBER CEMENT SIDING AND PVC PANELS/TRIM. NO VINYL SIDING WILL BE ALLOWED.AT LEAST ONE FRONT FACING GABLE ON EACH BUILDING. 2. DESCRIPTION OF HOW PROPOSED DESIGN WILL FIT INTO THE CONTEXT AREA ALTHOUGH THE IMMEDIATE CONTEXT IS ZONED AS OFFICE, RESEARCH AND/OR INDUSTRIAL USES, THE AREA NORTH OF THIS SITE HAS BEEN DEVELOPED MORE TOWARDS MEDIUM TO HIGHER DENSITY RESIDENTIAL USES. ENVIRONMENTAL AND INFRASTRUCTURE CONSTRAINTS IN THE GENERAL AREA (STREAMS, RAILROAD, ETC.) LIMIT THE TYPE AND INTENSITY OF DEVELOPMENT. THIS SITE FRONTS ALONG TW ALEXANDER DRIVE/CSX RAILROAD/SOUTH ALSTON AVENUE. IT IS ALSO ADJACENT TO MEDIUM -HIGH DENSITY RESIDENTIAL DEVELOPMENTS (APARTMENTS) TO THE NORTH AS WELL AS RTP DEVELOPMENT TO THE SOUTH AND EAST. THE PROPOSED DEVELOPMENT OF MULTI -STORY BUILDING HEIGHT AND HIGHER RESIDENTIAL INTENSITY WOULD TRANSITION WELL WITH RTP DEVELOPMENTS WHILE PROTECTING AND PRESERVING NATURAL FEATURES OF THE SITE. D2100045 (SITE PLAN) Z2000015 (DEVELOPMENT PLAN) AUAAP-Q2 T 6430-10 (DURHAM COUNTY))A 405 T.W. ALEXANDER DR, 5604 SOLUTIONS DR DURHAM, NC 27713 JAN UARY 19, 2022 REVISED: APRIL 1, 2022 CASE NUMBERS SITE VICI N ITY MAP PARCEL INFORMATION 0 250' S00' CITY OF DURHAM: CONSTRUCTION DRAWINGS SHEET INDEX EX1-2 EXISTING CONDITIONS AND DEMO PLAN SL1 SITE LAYOUT PLAN EC1-2 EROSION CONTROL PLAN DT14 DETAILS PLAN GENERAL NOTES 1. INFORMATION REGARDING THE LOCATION OF EXISTING UTILITIES HAS BEEN BASED UPON AVAILABLE INFORMATION AND MAY BE INCOMPLETE, AND WHERE SHOWN SHOULD BE CONSIDERED APPROXIMATE. THE LOCATION OF ALL EXISTING UTILITIES SHOULD BE CONFIRMED PRIOR TO BEGINNING CONSTRUCTION. CONTRACTOR SHALL CALL "NC ONE CALL 1-800-632-4949". CONTRACTOR SHALL MAINTAIN MARKINGS WHERE NEEDED DURING PROJECT. ALL UTILITY LOCATIONS THAT DO NOT MATCH THE VERTICAL OR HORIZONTAL CONTROL SHOWN ON THE PLANS SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR RESOLUTION. THE CONTRACTOR SHALL VERIFY LOCATIONS OF UTILITIES AND SERVICE LATERALS PRIOR TO CONSTRUCTION. ANY CONFLICTS WITH LOCATIONS OF LIGHT POLES, TREES, ETC. SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR RESOLUTION PRIOR TO CONSTRUCTION. 2. EDENS LAND ACCEPTS NO RESPONSIBILITY FOR THE ACCURACY OF MAPS AND DATA WHICH HAVE BEEN SUPPLIED BY OTHERS. 3. ALL DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. PIN: 0737-35-45-4162, PID: 154068 PIN: 0737-35-74-2693, PID: 154038 This drawing is the property of Edens Land Corp. and is not to be reproduced or copied in whole or in part without the expressed written permission of Edens Land Corp. NC LICENSE: C-2745 C `w,� ..•'�cc l�i�IM'Ml l)n V9` IR ; AL 9 _� •2 � ;�04/01/22 �- /.FEt:�sGN� " "// 0, HER\' //IljlllJ\,\ FINAL DRAWING FOR REVIEW PURPOSES ONLY AND NOT RELEASED FOR CONSTRUCTION DISTURBED AREA: 8.21 ACRES 0 GENERAL NOTES 1. BOUNDARY AND TOPOGRAPHIC INFORMATION IS BASED UPON SURVEY BY MURPHY GEOMATICS. 2. INFORMATION REGARDING THE LOCATION OF EXISTING UTILITIES HAS BEEN BASED UPON AVAILABLE INFORMATION AND MAY BE INCOMPLETE, AND WHERE SHOWN SHOULD BE CONSIDERED APPROXIMATE. THE LOCATION OF ALL EXISTING UTILITIES SHOULD BE CONFIRMED PRIOR TO BEGINNING CONSTRUCTION. CONTRACTOR SHALL CALL "NC ONE CALL: 1-800-632-4949". CONTRACTOR SHALL MAINTAIN MARKINGS WHERE NEEDED DURING PROJECT. ALL UTILITY LOCATIONS THAT DO NOT MATCH THE VERTICAL OR HORIZONTAL CONTROL SHOWN ON THE PLANS SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR RESOLUTION. THE CONTRACTOR SHALL VERIFY LOCATIONS OF UTILITIES AND SERVICE LATERALS PRIOR TO CONSTRUCTION. ANY CONFLICTS WITH LOCATIONS OF LIGHT POLES, TREES, ETC. SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR RESOLUTION PRIOR TO CONSTRUCTION. 3. EDENS LAND ACCEPTS NO RESPONSIBILITY FOR THE ACCURACY OF MAPS AND DATA WHICH HAVE BEEN SUPPLIED BY OTHERS. 4. ALL DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED IN THE FIELD PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. 5. BY REFERENCING ROADWAY IMPROVEMENTS ON THE PLAN, THE APPLICANT AGREES TO N CONSTRUCT SAID IMPROVEMENTS PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY IN A MANNER THAT WILL ALLOW THEM TO FUNCTION AS NOTED ON THE PLAN AND IN ACCORDANCE WITH NCDOT AND CITY OF DURHAM STANDARDS AND POLICIES. THIS INCLUDES (WHERE APPROPRIATE) BUT IS NOT LIMITED TO: ADEQUATE TRANSITION TAPERS, ALIGNMENT OF LANES THROUGH INTERSECTIONS, ASSOCIATED SIGNAL MODIFICATIONS, PAVEMENT MARKINGS, ASSOCIATED SIGNAGE, CURB AND GUTTER, COORDINATION WITH OTHER PROPOSED ROADWAY IMPROVEMENTS AND BIKE LANES. THE APPLICANT ALSO ACCEPTS THE FINANCIAL RESPONSIBILITY FOR ACQUISITION OF ANY ADDITIONAL RIGHT-OF-WAY NECESSARY TO ACCOMMODATE THESE IMPROVEMENTS AND ANY REQUIRED SIDEWALK CONSTRUCTION. 6. SITE DATA INFORMATION, CALCULATIONS AND REQUIREMENTS CAN BE FOUND ON SHEET SUL 7. THE LOCATION OF THIS SIDEWALK SHOWN ON THIS PLAN IS SCHEMATIC. A CITY OF DURHAM AND/OR NCDOT ENCROACHMENT PERMIT IS REQUIRED PRIOR TO ANY CONSTRUCTION. AFTER OBTAINING THE REQUIRED PERMITS PLEASE CONTACT THE CITY OF DURHAM ENGINEERING CONSTRUCTION INSPECTION OFFICE AT 560-4326 FOR A PRE -CONSTRUCTION CONFERENCE AND FIELD VISIT PRIOR TO ANY WORK ON THE PROPOSED SIDEWALK. 8. A TRAFFIC IMPACT ANALYSIS (TIA) DATED 07/27/21 WAS PREPARED BY RAMEY KEMP & ASSOCIATES, INC. NOTIFICATION OF COMBINED SELF -MONITORING AND SELF -INSPECTION FORM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND NPDES SELF -MONITORING REPORTS, NCDEQ DWR AND DEMLR DEVELOPED A COMBINED FORM. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: HT 'P://DEQ.NC.GOV/ABOUT/DIVISIONS/ENERGY-MINERAL-LAND-RESOURCES/EROSION-SEDIMENT-CONTROL/FORMS IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT DURHAM COUNTY EROSION CONTROL AT (919) 560-0735. OWNER/APPLICANT DURHAM COUNTY SEDIMENTATION & EROSION CONTROL NOTES SR REAL ESTATE PARTNERS, LLC 4 WEST OAK LANE, SUITE 325 1. IF MORE THAN 12,000 SQ.FT. IS DISTURBED, A LAND -DISTURBING PERMIT WILL BE REQUIRED PRIOR TO THE COMMENCEMENT OF ANY WHITE PLAINS, NY 10604 LAND -DISTURBING ACTIVITIES. PH: 914.831.0095 CONTACT: DOUGLAS SMOLEV 2. IF MORE THAN 20,000 SQ.FT. IS DISTURBED, A SEDIMENTATION AND EROSION CONTROL PLAN MUST BE SUBMITTED AND APPROVED PRIOR TO THE ISSUANCE OF A LAND -DISTURBANCE PERMIT. ENGINEERING/ 3. TREE PROTECTION IS REQUIRED BY THE CITY/COUNTY PLANNING DEPARTMENT. TREE PROTECTION CERTIFICATION MUST BE LANDSCAPE ARCHITECTURE SUBMITTED TO THE DURHAM COUNTY EROSION CONTROL DIVISION, AND TREE PROTECTION INSPECTION COMPLETED, PRIOR TO LAND -DISTURBANCE PERMIT ISSUANCE. EDENS LAND CORP. 112 E. MAIN STREET 4. IF AN OFF -SITE SPOIL OR BORROW SITE IS UTILIZED, THEN THE DISTURBED AREA FOR THE SPOIL/BORROW SITE MUST BE INCLUDED IN DURHAM, NC 27701 THE LAND DISTURBANCE PLAN AND PERMIT UNLESS THE SPOIL/BORROW SITE ALREADY HAS A LAND DISTURBANCE PERMIT. PH: 919.316.1855 EMAIL: CHRIS.MEHL@EDENSLAND.COM 5. IF THE DISTURBED AREA EXCEEDS FIVE (5) ACRES, AN IMPROVEMENT SECURITY WILL BE REQUIRED PRIOR TO LAND -DISTURBING PERMIT CONTACT: CHRIS MEHL, P.E., ISSUANCE. DIRECTOR - CIVIL ENGINEERING SERVICES SURVEYING MURPHY GEOMATICS, PLS 10505 LEAFWOOD PLACE RALEIGH, NC 27613 PH: 919.280.8189 EMAIL: JONATHAN@MURPHYGEOMATICS.COM CONTACT: JONATHAN MURPHY, PLS NOTE: CITY OF DURHAM STANDARDS AND SPECIFICATIONS USED. rm. EdensLand 112 E. Main Street www.edens.inc Durham, NC 27701 919.316.1855 NOTE: CONTRACTOR TO VERIFY EXISTING INFORMATION PRIOR TO CONSTRUCTION. NOTIFY ENGINEER OF ANY DISCREPANCIES. CALL BEFORE YOU DIG North Carolina One -Call Center (800) 632-4949 www.ncocc.org