Loading...
HomeMy WebLinkAbout20201095 Ver 1_Initial Credit Release_20221021Strickland, Bev From: Davis, Erin B Sent: Monday, November 7, 2022 4:54 PM To: Baker, Caroline D Subject: FW: [External] Initial Credit Release/ WEI Catawba UMBI - Double Rock Mitigation Site/ SAW-2020-01532/ Alexander County Attachments: Initial Credial Credit Release Letter_WEI Cat 01-Double Rock_2020-01532_Signed.pdf Laserfiche Upload: Email & Attachment DWR#: 20201095 v.1 Doc Date: 10/21/22 Doc Type: Mitigation — Mitigation Evaluation Doc Name: General topic of email title From: Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Friday, October 21, 2022 9:10 AM To: Andrea Eckardt <aeckardt@wildlandseng.com>; Shawn Wilkerson <swilkerson@wildlandseng.com> Cc: Tugwell, Todd J CIV USARMY CESAW (US)<Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Munzer, Olivia <olivia.munzer@ncwildlife.org>; Hamstead, Byron A <byron_hamstead@fws.gov>; Merritt, Katie <katie.merritt@ncdenr.gov>; Bowers, Todd <bowers.todd@epa.gov>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley2@usace.army.mil>; Jones, M Scott (Scott) CIV USARMY CESAW (USA) <Scott.Jones@usace.army.mil>; Haywood, Casey M CIV USARMY CEMVP (USA) <Casey.M.Haywood@usace.army.mil>; Fennel, Tommy E CIV USARMY CESAW (USA) <Tommy.E.Fennel@usace.army.mil> Subject: [External] Initial Credit Release/ WEI Catawba UMBI - Double Rock Mitigation Site/ SAW-2020-01532/ Alexander County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Andrea and Shawn, Please find attached the Initial Credit Release letter for the Wildlands Catawba Umbrella Mitigation Bank: Double Rock Mitigation Site (SAW-2020-01532). As requested, 15% credit is being released for approved restoration activities that satisfy the initial release requirements pursuant to the Mitigation Banking Instrument, in addition to 100% of preservation credits. In accordance with the plan, 778.19 warm stream mitigation units are now available for the Upper Catawba River Basin (HUC 03050101). The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria: 1) Execution of the UMBI by the Sponsor and the USACE; 2) Approval of the final Mitigation Plan; 3) Confirmation that the Mitigation bank site is secured; 4) Delivery of the executed financial assurances described in the Mitigation Plan; 5) Recordation of the long-term protection mechanism and title opinion acceptable to the USACE; 6) 404 permit verification for construction of the site. 7) Documentation of the establishment of the long-term endowment/escrow account. This electronic copy is an official Department of the Army Notification. Feel free to contact me with any questions. i Regards, Kim Kim Isenhour Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers I 919.946.5107 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 REPLY TO ATTENTION OF: Regulatory Division/Isenhour Action ID No. SAW-2020-01532 October 20, 2022 Re: Initial Credit Release associated with Wildlands Catawba 01 Umbrella Mitigation Bank, Double Rock Mitigation Site Wildlands Holdings VI, LLC Attn: Shawn Wilkerson 1430 S. Mint St., Suite 104 Charlotte, NC 28203 Dear Mr. Wilkerson: This correspondence is in reference to the Wildlands Catawba 01 Umbrella Mitigation Bank, Double Rock Mitigation Site located at 1407 Stikeleather Road in Hiddenite, Alexander County, NC, within the Upper Catawba River Basin Cataloging Unit (03050101). The purpose of this letter is to confirm the initial release of credits for this mitigation site. (35.8629°N,-81.0967°W) Pursuant to the Mitigation Banking Instrument (UMBI) entitled, The Wildlands Catawba 01 Umbrella Mitigation Bank, approved July 25, 2022, 15 percent of the mitigation site's restoration credits and 100 percent of the site's preservation credits shall be available for sale immediately upon completion of all the following: a. Approval of the final mitigation plan (July 25, 2022); b. Issuance of the 404-permit authorization for construction of the site (Oct. 3, 2022); c. Delivery of the executed financial assurance documents as described in Section IX of UMBI (Aug. 2022) d. Recordation of the Corps -approved site protection mechanism described in Section X of the UMBI including a title opinion covering the property. (Oct. 2022) e. Execution of the UMBI by Wildlands Holdings VI, LLC and USACE (July 2022); and f. Documentation of the establishment of the long-term endowment/escrow account (Sept. 26, 2022). By copy of this correspondence, we confirm that you have satisfied the above requirements for the initial credit release; and 778.19 warm stream mitigation units (SMU's) constituting 15 percent of the mitigation site's total restoration credits and 100 percent of the site's total preservation credits (4556.10 SMUs) are now available for sale. M. SMU Type Site Total Release % SMU Release Restoration & I 4,44.60 15% 666.69 Enhancement 11 Preservation 100% r 111.50 TOTAL 4,556.10 778.19 Thank you for your interest in restoring and protecting waters of the United States. If you have questions regarding this letter, please contact Kim Isenhour, Mitigation Project Manager at (919) 946-5107 or Kimberly.D.Browning@usace.army.mil . Sincerely, Tyler Digitally signed by Tyler Crumbley Crumbley Tyler Crumbley Deputy Chief Wilmington District Regulatory Division Electronic Copies Furnished: NCIRT Distribution List Andrea Eckardt—Wildlands Engineering, Inc.