HomeMy WebLinkAbout20201095 Ver 1_Initial Credit Release_20221021Strickland, Bev
From: Davis, Erin B
Sent: Monday, November 7, 2022 4:54 PM
To: Baker, Caroline D
Subject: FW: [External] Initial Credit Release/ WEI Catawba UMBI - Double Rock Mitigation
Site/ SAW-2020-01532/ Alexander County
Attachments: Initial Credial Credit Release Letter_WEI Cat 01-Double Rock_2020-01532_Signed.pdf
Laserfiche Upload: Email & Attachment
DWR#: 20201095 v.1
Doc Date: 10/21/22
Doc Type: Mitigation — Mitigation Evaluation
Doc Name: General topic of email title
From: Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>
Sent: Friday, October 21, 2022 9:10 AM
To: Andrea Eckardt <aeckardt@wildlandseng.com>; Shawn Wilkerson <swilkerson@wildlandseng.com>
Cc: Tugwell, Todd J CIV USARMY CESAW (US)<Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>;
Wilson, Travis W. <travis.wilson@ncwildlife.org>; Munzer, Olivia <olivia.munzer@ncwildlife.org>; Hamstead, Byron A
<byron_hamstead@fws.gov>; Merritt, Katie <katie.merritt@ncdenr.gov>; Bowers, Todd <bowers.todd@epa.gov>;
Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley2@usace.army.mil>; Jones, M Scott (Scott) CIV USARMY
CESAW (USA) <Scott.Jones@usace.army.mil>; Haywood, Casey M CIV USARMY CEMVP (USA)
<Casey.M.Haywood@usace.army.mil>; Fennel, Tommy E CIV USARMY CESAW (USA)
<Tommy.E.Fennel@usace.army.mil>
Subject: [External] Initial Credit Release/ WEI Catawba UMBI - Double Rock Mitigation Site/ SAW-2020-01532/
Alexander County
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Andrea and Shawn,
Please find attached the Initial Credit Release letter for the Wildlands Catawba Umbrella Mitigation Bank: Double Rock
Mitigation Site (SAW-2020-01532). As requested, 15% credit is being released for approved restoration activities that
satisfy the initial release requirements pursuant to the Mitigation Banking Instrument, in addition to 100% of
preservation credits. In accordance with the plan, 778.19 warm stream mitigation units are now available for the Upper
Catawba River Basin (HUC 03050101).
The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria:
1) Execution of the UMBI by the Sponsor and the USACE;
2) Approval of the final Mitigation Plan;
3) Confirmation that the Mitigation bank site is secured;
4) Delivery of the executed financial assurances described in the Mitigation Plan;
5) Recordation of the long-term protection mechanism and title opinion acceptable to the USACE;
6) 404 permit verification for construction of the site.
7) Documentation of the establishment of the long-term endowment/escrow account.
This electronic copy is an official Department of the Army Notification. Feel free to contact me with any questions.
i
Regards,
Kim
Kim Isenhour
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers I 919.946.5107
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
69 DARLINGTON AVENUE
WILMINGTON, NORTH CAROLINA 28403-1343
REPLY TO
ATTENTION OF:
Regulatory Division/Isenhour
Action ID No. SAW-2020-01532
October 20, 2022
Re: Initial Credit Release associated with Wildlands Catawba 01 Umbrella Mitigation Bank,
Double Rock Mitigation Site
Wildlands Holdings VI, LLC
Attn: Shawn Wilkerson
1430 S. Mint St., Suite 104
Charlotte, NC 28203
Dear Mr. Wilkerson:
This correspondence is in reference to the Wildlands Catawba 01 Umbrella Mitigation Bank,
Double Rock Mitigation Site located at 1407 Stikeleather Road in Hiddenite, Alexander County,
NC, within the Upper Catawba River Basin Cataloging Unit (03050101). The purpose of this letter
is to confirm the initial release of credits for this mitigation site. (35.8629°N,-81.0967°W)
Pursuant to the Mitigation Banking Instrument (UMBI) entitled, The Wildlands Catawba 01
Umbrella Mitigation Bank, approved July 25, 2022, 15 percent of the mitigation site's restoration
credits and 100 percent of the site's preservation credits shall be available for sale immediately
upon completion of all the following:
a. Approval of the final mitigation plan (July 25, 2022);
b. Issuance of the 404-permit authorization for construction of the site (Oct. 3, 2022);
c. Delivery of the executed financial assurance documents as described in Section IX of
UMBI (Aug. 2022)
d. Recordation of the Corps -approved site protection mechanism described in Section X
of the UMBI including a title opinion covering the property. (Oct. 2022)
e. Execution of the UMBI by Wildlands Holdings VI, LLC and USACE (July 2022); and
f. Documentation of the establishment of the long-term endowment/escrow account
(Sept. 26, 2022).
By copy of this correspondence, we confirm that you have satisfied the above requirements for
the initial credit release; and 778.19 warm stream mitigation units (SMU's) constituting 15 percent
of the mitigation site's total restoration credits and 100 percent of the site's total preservation
credits (4556.10 SMUs) are now available for sale.
M.
SMU Type Site Total
Release % SMU Release
Restoration & I 4,44.60 15% 666.69
Enhancement 11
Preservation 100% r 111.50
TOTAL 4,556.10 778.19
Thank you for your interest in restoring and protecting waters of the United States. If you have
questions regarding this letter, please contact Kim Isenhour, Mitigation Project Manager at (919)
946-5107 or Kimberly.D.Browning@usace.army.mil .
Sincerely,
Tyler Digitally signed
by Tyler
Crumbley Crumbley
Tyler Crumbley
Deputy Chief
Wilmington District Regulatory Division
Electronic Copies Furnished:
NCIRT Distribution List
Andrea Eckardt—Wildlands Engineering, Inc.