Loading...
HomeMy WebLinkAbout20140189 Ver 1_Close-outs_20221031Strickland, Bev From: Davis, Erin B Sent: Monday, November 7, 2022 4:19 PM To: Baker, Caroline D Subject: FW: [External] RE: Oct 24 Arrington Bridge & Buffalo Branch Close -Outs Laserfiche Upload: Email DWR#: 20140189 v.1 Doc Date: 10/31/22 Doc Type: Mitigation — Mitigation site visit Doc Name: General topic of email title From: Haywood, Casey M CIV USARMY CEMVP (USA) <Casey.M.Haywood@usace.army.mil> Sent: Monday, October 31, 2022 4:16 PM To: Ryan Medric <rmedric@res.us>; Tugwell, Todd J CIV USARMY CESAW (US)<Todd.J.Tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org> Cc: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>; Jamey Mceachran <jmceachran@res.us> Subject: [External] RE: Oct 24 Arrington Bridge & Buffalo Branch Close -Outs CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Ryan, Thanks for providing the site notes for Arrington Bridge and Buffalo Branch and providing the requested information in the previous email, I have no additional comments. Please submit photo documentation once the container cypress are planted or include them in with the gauge data. Thanks, Casey Casey Haywood Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers Work cell: (919) 750-7397 From: Ryan Medric <rmedric@res.us> Sent: Monday, October 31, 2022 3:42 PM To: Tugwell, Todd J CIV USARMY CESAW (USA)<Todd.J.Tugwell@usace.army.mil>; Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Haywood, Casey M CIV USARMY CEMVP (USA) <Casey.M.Haywood@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org> Cc: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>; Jamey Mceachran <Imceachran@res.us> Subject: [URL Verdict: Neutral][Non-DoD Source] RE: Oct 24 Arrington Bridge & Buffalo Branch Close -Outs Sounds good, Todd. We will take a look at the data and get it to you all when it's successful. Also we can plant some container cypress in those areas this dormant season. 1 Site visit memo attached. Ryan Medric Project Manager RES I res.us D: 919.741.6268 I M: 703.424.6313 From: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil> Sent: Monday, October 31, 2022 1:06 PM To: Ryan Medric <rmedric@res.us>; Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Haywood, Casey M CIV USARMY CEMVP (USA) <Casey.M.Haywood@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org> Cc: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>; Jamey Mceachran <jceachran@res.us> Subject: [EXTERNAL] RE: Oct 24 Arrington Bridge & Buffalo Branch Close -Outs Thanks Ryan. I appreciate the info. As we discussed, once we get the data from the gauges showing a successful growing season, I'm fine to close it (rather than waiting until next fall). Unless we start getting a lot of rain soon, I suspect that would be early in the next growing season. As for the cattail areas, I do think it would be good to have some containerized cypress planted to kick-start those areas, esp. since this would be the final opportunity to do so. Also, were there field notes prepared for the meeting by any chance? Thanks, todd From: Ryan Medric <rmedric@res.us> Sent: Monday, October 31, 2022 12:00 PM To: Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Haywood, Casey M CIV USARMY CEMVP (USA) <Casey.M.Haywood@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org> Cc: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>; Jamey Mceachran <jceachran@res.us> Subject: [URL Verdict: Neutral][Non-DoD Source] RE: Oct 24 Arrington Bridge & Buffalo Branch Close -Outs Arrington Bridge III closeout site visit follow up: We replaced all the HOBOs on 10/27 and plan to download and process the data after the growing season ends on 11/22. I have attached a photo of the encroachment repair at the east end of the project where the dirt stockpile was. Between last Monday and Thursday the pile was moved away from the easement so the new markers are much more obvious. We will add signs to the PVC when we are out there again in November. We also mapped the cattail treatment areas where we experienced tree mortality. Those areas are shown on the attached CCPV and represent 1.4 acres. Please let me know if you'd like us to replant the cattail areas this winter. Thanks, Ryan Medric 2 Project Manager RES I res.us D: 919.741.6268 I M: 703.424.6313 From: Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Thursday, October 20, 2022 2:20 PM To: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Haywood, Casey M CIV USARMY CEMVP (USA) <Casey.M.Haywood@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org> Cc: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>; Ryan Medric <rmedric@res.us>; Jamey Mceachran <jceachran@res.us> Subject: [EXTERNAL] Oct 24 Arrington Bridge & Buffalo Branch Close -Outs Just to confirm, we had to move the meet time for these two sites to 10:00 am. RES Neu -Con: Arrington Bridge III year 7 and Buffalo Branch year 7 We will plan to meet at Arrington Bridge at 10:00 and then travel to Buffalo Branch, which is —30 minutes away and back towards Raleigh. Arrington meeting location: 35.35003953908373,-78.0148981943754 Buffalo meeting location: 35.60519203241926, -78.29498008074894 Thanks Kim Kim Isenhour Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers I 919.946.5107 3