HomeMy WebLinkAbout20160849 Ver 1_Notice of Monitoring Report Review_20221103Strickland, Bev
From: Davis, Erin B
Sent: Monday, November 7, 2022 3:45 PM
To: Baker, Caroline D
Subject: FW: [External] Notice of Monitoring Report Review/ WLS Upper Rocky Mitigation
Bank/ SAW-2015-01816/ Mecklenburg County
Laserfiche Upload: Email
DWR#: 20160849 v.1
Doc Date: 11/3/22
Doc Type: Mitigation Information
Doc Name: General topic of email title
From: Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>
Sent: Thursday, November 3, 2022 3:36 PM
To: Tugwell, Todd J CIV USARMY CESAW (US)<Todd.J.Tugwell@usace.army.mil>; Haywood, Casey M CIV USARMY
CESAW (USA) <Casey.M.Haywood@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W.
<travis.wilson@ncwildlife.org>; Munzer, Olivia <olivia.munzer@ncwildlife.org>; Merritt, Katie
<katie.merritt@ncdenr.gov>; Bowers, Todd <bowers.todd@epa.gov>; Hamstead, Byron A <byron_hamstead@fws.gov>
Cc: Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley2@usace.army.mil>; Cara Conder
<cara@waterlandsolutions.com>; Daniel Ingram <daniel@waterlandsolutions.com>
Subject: [External] Notice of Monitoring Report Review/ WLS Upper Rocky Mitigation Bank/ SAW-2015-01816/
Mecklenburg County
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good afternoon,
The below reference bank Sponsor has submitted an Annual Monitoring Report for NCIRT review, and is requesting a
release of credits. The Annual Monitoring Report has been posted to the RIBITS Cyber Repository for the bank site (see
link and instructions provided below). If you are unable to access the document or prefer to have a hard copy mailed to
you, please let me know as soon as possible, and I will arrange to get you a copy of the report.
This review will follow the process outline for Credit Release Approval in the 2008 Mitigation Rule (Section 332.8(o)(9)),
which requires an IRT review period of 15 calendar days from the date of this email notification. Please provide any
comments by 5 PM on the 15-day comment deadline shown below. Comments provided after the 15-day comment
deadline may not be considered. If you would like to request a site visit prior to submitting comments, please notify me
as soon as possible but prior to the 15-day comment due date. If a site visit is required, the due date for IRT comments
will be extended to 15 days after the date of site visit. Once I have received a request for a site visit, I will coordinate
with the IRT and Sponsor to arrange for the on -site meeting; however, please note that due to workload it may take a
month or longer to arrange the meeting. Within 30 days of the conclusion of the IRT review period (comment deadline),
a copy of all comments will be provided to the bank Sponsor and the IRT along with District Engineer's intent to approve
or disapprove this credit release.
Sponsor: Water & Land Solutions
Bank Name: WLS Upper Rocky UMB
Site Name: Upper Rocky Mitigation Site
1
USACE ID: SAW-2015-01816
River Basin: Upper Yadkin
HUC: 03040105
County: Mecklenburg
Requested Credit Release: Year 1 Annual Monitoring
10% of the total stream restoration and/or enhancement credits: 900.10 Warm Water Stream Credits
10% of the total wetland restoration and/or enhancement credits: 0.857 Riparian Wetland Credits
15-Day Comment Start Date: November 7, 2022
15-Day Comment Deadline: November 22, 2022
45-Day Credit Release Approval Deadline: Dec 22, 2022
NOTE: Deadlines will be extended if an on -site meeting is requested.
Please be sure to log on to RIBITS before following the link below. Once in the Cyber Repository, select the arrow beside
appropriate folder to view and/or download the documents.
Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:423495510104:::RP,278:P278 BANK ID:4396
Thank you and please contact me with any questions,
Kim Isenhour
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers I 919.946.5107
2