Loading...
HomeMy WebLinkAbout20141149 Ver 2_DWR 2014-1149 v2_Motes_MY5 2022 Monitoring Report__20221107ID#* 20141149 Select Reviewer: Erin Davis Initial Review Completed Date 11/07/2022 Mitigation Project Submittal - 11/7/2022 Version* 2 Is this a Prospectus, Technical Proposal or a New Site?* Type of Mitigation Project:* Stream Wetlands Buffer Nutrient Offset (Select all that apply) Project Contact Information Contact Name:* Raymond J Holz Project Information ID#:* 20141149 Existing ID# Project Type: DMS • Mitigation Bank Project Name: Motes Creek Stream Bank County: Alamance Document Information O Yes O No Email Address:* rholz@restorationsystems.com Version:* 2 Existing Version Mitigation Document Type:* Mitigation Monitoring Report File Upload: DWR 2014-1149 v2 Motes MY5 2022 Monitoring 13.77MB Report_.pdf Please upload only one PDF of the complete file that needs to be submitted... Signature Print Name: * Raymond J Holz Signature: 1101 Haynes St., Suite 211 • Raleigh, NC 27604 • www.restorationsystems.com • Ph 919.755.9490 • Fx 919.755.9492 November 2, 2022 Mrs. Kim Isenhour Regulatory Project Manager U.S. Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 RE: SAW-2015-01696 Motes Creek Bank Site Year 5 Monitoring Credit Release Request Dear Mrs. Isenhour, Pursuant to Section VII: Credit Release Schedule of the Cape Fear 02 Umbrella Mitigation Banking Instrument signed on 7/6/2017, the Sponsor, Restoration Systems, hereby requests the following credit releases: • The Year 4 Monitoring Credit Release for 10% of total credits or 534.50 Stream Mitigation Units. A total of 534.50 credits requested to be released. Please let me know if you require any more information, Thank you, Worth Creech Enclosures: Parcel Release Schedule Parcel Ledger Continuation Certificate Year 5 Monitoring Report SAW‐2015‐001696 Project Name: Sponsor Name: USACE Action ID: NCDWQ Action ID: Non‐Forested  Wetland  Credits Warm  Water Cool  Water Cold  Water Riparian  Riverine Riparian Non‐Riverine Non‐Riparian Coastal 5345 0.92 5345 0.92 Scheduled  Releases Warm  Water Cool  Water Cold  Water Scheduled  Releases Riparian  Riverine Riparian Non‐Riverine Non‐Riparian Scheduled  Releases Coastal 1 (Bank/Site Establishment)1, 2 15% 801.75 15% 0.14 15%12/1/2019 9/29/2017 2 (Year 0/As‐Built)3 15% 801.75 15% 0.14 15%12/1/2019 5/2/2018 3 (Year 1 Monitoring)10% 534.50 10% 0.09 10%12/1/2019 11/13/2018 4 (Year 2 Monitoring)10% 534.50 10% 0.09 15%12/1/2019 12/5/2019 Stream Bankfull 4 5% 267.25 NA 0.00 12/1/2019 12/5/2019 5 (Year 3 Monitoring)10% 534.50 10% 0.09 20%2020 11/19/2020 0.65 6 (Year 4 Monitoring)5% 267.25 10% 0.09 10%2021 1/19/2022 Stream Bankfull 4 5% 267.25 NA 0.00 15%2021 1/19/2022 7 (Year 5 Monitoring)10% 534.50 10% 0.09 NA NA 2022 8 (Year 6 Monitoring)5% 267.25 10% 0.09 NA NA 2023 9 (Year 7 Monitoring)10% 267.25 10% 0.09 NA NA NA NA 2024 Total Credits Release to Date 75% 4008.75 50%0.46                  Contingencies (if any): The CF02 Umbrella Mitigation Bank has a credit release schdule for streams and wetlands that is different than other Banks in the District.  Signature of Wilmington District Official Approving Credit Release Date Current and Future Credit Releases Credit Release Milestone Stream Credits Forested Wetland Credits Non‐Forested Wetland  Credits Projected  Release Date Actual Release  Date Potential Credits from As‐Built Survey SAW‐2015‐01696 Year Project Instituted: 2017 2014 1149 v2 Date Prepared: 11/7/2022 Total Potential Credits  Credit Classification Stream Credits Forested Wetland Credits* Potential Credits from Mitigation Plan Wilmington District Mitigation Bank Credit Release Schedule Motes Creek County: Alamance Restoration Systems 8‐Digit HUC: 03030002 * Wetland credits can be released according to the MBI credit release schedule at the request of the Sponsor.  4 ‐ A 10% total reserve of credits to be held back until the bankfull event performance standard has been met. See Bank's MBI 3 ‐ The second credit release is based on the credit totals from the as‐built survey, and may differ slightly from the credit totals stated in the mitigation plan.       Any discrepancy (either positive or negative) is made up during the second credit release. 2 ‐ The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria:       1) Execution of the MBI or UMBI by the Sponsor and the USACE;       2) Approval of the final Mitigation Plan;       3) Mitigation bank site must be secured;       4) Delivery of the financial assurances described in the Mitigation Plan;       5) Recordation of the long‐term protection mechanism and title opinion acceptable to the USACE;       6) 404 permit verification for construction of the site, if required. 1 ‐ The first credit release milestone is based on the potential credits stated in the approved mitigation plan. SAW‐2015‐001696 Project Name:Motes Creek Sponsor Name: Restoration Systems USACE Action ID: SAW‐2015‐01696 NCDWQ Action ID: 2014 1149 v2 Type Jurisdiction Date Permittee Credits Permits Credit Classification Impact HUC Impact Quantity TW Stream TW Wetland Available Stream Available Wetland Comment Ltr Rec'd Addendums Init Federal 5345 Stream Init Federal 0.92 Wetland Rel Federal 9/29/2017 Initial Release 801.75 Stream 0 0 801.75 Rel Federal 4/16/2018 As‐Built Implementation 801.75 Stream 0 0 1603.5 Rel Federal 11/13/2018 Year 1 Monitoring 534.50 Stream 0 0 2138.00 Rel Federal 12/5/2019 Year 2 Monitoring 801.75 Stream 0 0 2939.75 Rel Federal 12/5/2019 Year 2 Monitoring 0.46 Wetland 0 0 2939.75 0.46 Wdr Federal 2/11/2020 Publix Super Markets Inc 228.15 Stream 03030002 228.15 0 2711.60 0.46 Wdr Federal 2/11/2020 Publix Super Markets Inc 0.06 Wetland 03030002 228.15 0.06 2711.60 0.40 Wdr Federal 5/14/2020 Goria Youngs Mill, LLC 0.4 Wetland 03030002 228.15 0.46 2711.60 0.00 Wdr Federal 6/3/2020 Duke University Health Systems 133 Stream 03030002 361.15 0.46 2578.60 0.00 Wdr Federal 8/12/2020 Decso Holdings, LLC 188 Stream 03030002 549.15 0.46 2390.60 0.00 Wdr Federal 9/11/2020 Town of Chapel Hill 162 Stream 03030002 711.15 0.46 2228.60 0.00 Rel Federal 11/19/2020 Year 3 Monitoring 534.5 Stream 711.15 0.46 2763.10 0.00 Wdr Federal 12/2/2020 Retreat at 68, LLC 51.67 Stream 03030002 762.82 0.46 2711.43 0.00 Rel Federal 1/18/2022 Year 4 Monitoring 534.5 Stream 762.82 0.46 3245.93 0.00 Continuation Certificate The Hartford Insurance Group The hereby continues in force its Bond No. in the sum of (hereinafter called the Company) Dollars, on behalf of in favor of for the (extended) term beginning on subject to all the covenants and conditions of said Bond, said bond and this and all continuations thereof being one continuous contract. This Continuation is executed upon the express condition that the Company’s liability under said Bond and this and all continuations thereof shall not be cumulative and shall in no event exceed the sum of Dollars. IN WITNESS THEREOF, the Company has caused this instrument to be signed by its officers proper for the purpose and its corporate seal to be hereto affixed on By: Attorney in fact ________________________ ______________________________________________________________________________________________ ____________________________________________ _____________________________________________________ ________________________________________________________________________________________________ __________________________________________________________________________________________________ __________________________________________________________________________ ______________________ _____________________________________________________________________________________________________________ _____________________________________________ ____________________________________________________ ____________________________________________________ Hartford Fire Insurance Company Restoration Systems, LLC, 1101 Haynes Street, Suite 211, Raleigh NC 27604 NC Wildlife Habitat Foundation Hartford Fire Insurance Company Phoebe C. Honeycutt Surety - Miscellaneous 22BSBHT4267/Motes Creek Bank Site Twenty-Seven Thousand Five Hundred Dollars -------------------------------------------------------------------------- ---------------------------------------------------------------($27,500.00) November 21, 2022 and ending November 21, 2023 Twenty-Seven Thousand Five Hundred & no/100-------------------------------------------------------------------------------------------------------------------- ($27,500.00) October 3, 2022 October 3, 2022 YEAR 5 (2022) ANNUAL MONITORING DOCUMENT REPORT CAPE FEAR 02 UMBRELLA MITIGATION BANK MOTES CREEK BANK SITE Alamance County, North Carolina PREPARED BY: RESTORATION SYSTEMS, LLC 1101 HAYNES STREET, SUITE 211 RALEIGH, NORTH CAROLINA 27604 AND AXIOM ENVIRONMENTAL, INC. 218 SNOW AVENUE RALEIGH, NORTH CAROLINA 27603 November 2022 Motes Creek Year 5, 2022 Monitoring Summary General Notes • No encroachment was identified in Year 5 • No evidence of nuisance animal activity (i.e., beaver, heavy deer browsing, etc.) was observed. Streams • Stream monitoring measurements indicate minimal changes in the cross sections as compared to as-built data. The channel geometry compares favorably with the proposed conditions outlined in the Detailed Restoration Plan and as constructed. • Visual observations indicate that all in-stream structures are intact and functioning as designed, and no stream areas of concern were identified during Year 5 (2022) monitoring. • Two bankfull events were documented during year 5 (2022) for a total of 11 bankfull events during the monitoring period to-date, with events occurring during each of the 5 monitoring years (Table 10, Appendix D). • Channel formation was evident in UT 1 in year 5 (2022). The two stream flow gauges and trail cameras documented 153 and 264 consecutive days of stream flow during year 5 (2022). The approximate locations of stream flow gauges are depicted on Figure 2 (Appendix A); a table containing channel formation indicators as well as stream flow gauge data are included in Appendix D. Wetlands • All four groundwater gauges were successful in year 5 (2022). Gauge 4 appeared to have malfunctioned, showing erratic readings beginning on March 12. It was re-launched on April 28, but readings continued to appear erratic, so it was relaunched again on July 10. Readings after July 10 appear to be correct, and the gauge met success criteria during this time. Based on previous years data, the current year’s data from gauges 1-3, and field observations of saturation in the area surrounding gauge 4 well into the growing season, it is expected to have captured a significantly longer hydroperiod if functioning properly. Groundwater hydrology data is in Appendix D. Vegetation • Year 5 (2022) stem count measurements were performed on October 12, 2022 and indicate an average of 726 planted stems per acre (excluding livestakes) across the Site; therefore, the Site is meeting vegetation success criteria. Additionally, all 17 individual vegetation plots met success criteria based on planted stems alone. Year 5 (2022) vegetation plot information can be found in Appendix C. Visual observations indicate that Site vegetation is vigorous. A summary of Site permitting/monitoring activity, reporting history, and Year 5 (2022) maintenance activities, including invasive plant species treatment, is provided below. Site Permitting/Monitoring Activity and Reporting History Project Milestones Stream Monitoring Complete Vegetation Monitoring Complete Wetland Monitoring (last download) Data Analysis Complete Completion or Delivery MBI & Detailed Restoration Plan -- -- -- -- April 4, 2016 Construction Earthwork -- -- -- -- Feb 9, 2018 Planting -- -- -- -- Feb 27, 2017 As-Built Documentation -- -- -- Feb 2018 March 2018 Year 1 Monitoring August 29, 2018 Oct 3, 2018 Oct 15, 2018 Oct 2018 Oct. 2018 Year 2 Monitoring March 14, 2019 Oct 3, 2019 Oct 3, 2019 Oct 2019 Oct. 2019 Year 3 Monitoring Feb 12, 2020 Sept 15, 2020 Sept 24, 2020 Oct 2020 Oct 2020 Year 4 Monitoring NA NA October 13, 2021 Oct 2021 Nov 2021 Year 5 Monitoring Jan 13-18, 2022 Oct 12, 2022 October 25, 2021 Oct 2022 Nov 2022 Site Maintenance Report (2022) Invasive Species Work Maintenance work 7/14/2022 Multiflora Rose, Russian Olive, Privet, Sweetgum, Callery Pear NA Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Table of Contents page i Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC TABLE OF CONTENTS 1.0 PROJECT GOALS, BACKGROUND, AND ATTRIBUTES ......................................................... 1 1.1 Location and Setting ..................................................................................................................... 1 1.2 Project Goals and Objectives ........................................................................................................ 1 1.3 Project Approach .......................................................................................................................... 1 2.0 MONITORING PLAN ..................................................................................................................... 2 2.1 Streams .......................................................................................................................................... 3 2.1.1 Stream Success Criteria ........................................................................................................ 3 2.1.2 Stream Results ...................................................................................................................... 5 2.2 Vegetation ..................................................................................................................................... 5 2.2.1 Vegetation Success Criteria .................................................................................................. 5 2.2.2 Vegetation Results ................................................................................................................ 5 2.3 Wetland Hydrology ....................................................................................................................... 6 2.3.1 Wetland Hydrology Success Criteria .................................................................................... 6 2.3.2 Wetland Hydrology Results .................................................................................................. 7 2.4 Biotic Community Changes .......................................................................................................... 7 3.0 REFERENCES ................................................................................................................................. 8 TABLES Table 1. Project Goals and Objectives ......................................................................................................... 1 Table 2. Project Mitigation Types and Units ............................................................................................... 2 Table 3. Monitoring Schedule ...................................................................................................................... 3 Table 4. Functional Goal/Objectives and Performance Standards ............................................................... 4 Table 5. Summary of Monitoring Period/Hydrology Success Criteria by Year .......................................... 7 APPENDICES Appendix A. Figures Figure 1. Site Location Figure 2. Current Conditions Plan View Appendix B. Stream Data Tables 6A-6D. Baseline Morphology and Hydraulic Summary Tables 7A-7H. Morphology and Hydraulic Monitoring Summary Cross-section Plots Appendix C. Vegetation Data Table 8. Total and Planted Stems by Plot and Species Vegetation Plot Photographs Appendix D. Hydrology Data Table 9. UT1 Channel Evidence Stream Gauge Graph Table 10. Verification of Bankfull Events Table 11. Groundwater Hydrology Data Groundwater Gauge Graphs Soil Temperature Graph Appendix E. Benthic Data Results Field Habitat Forms Appendix F. Photo Log Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report page 1 Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC 1.0 PROJECT GOALS, BACKGROUND, AND ATTRIBUTES 1.1 Location and Setting Restoration Systems, LLC has established the Motes Creek Bank Site (hereafter referred to as the “Site”) as part of the Cape Fear 02 Umbrella Mitigation Bank. The Site is located approximately 8 miles southeast of Burlington within the 14-digit Cataloging Unit and Targeted Local Watershed 03030002050040 of the Cape Fear River Basin. The main hydrologic features include Motes Creek, three unnamed tributaries (UT) to Motes Creek, and adjacent floodplains. The Site encompasses 19 acres of land located south of Mount Willen Road, approximately 2300 feet east of the intersection of Mount Willen Road and NC Highway 54. Prior to construction, the Site was characterized by disturbed forest and agricultural land used for livestock grazing and hay production. Site streams were accessible by livestock, cleared of forest vegetation, and received nonpoint source inputs including agricultural chemicals and livestock waste. In addition, Site floodplains were characterized by 0.44 acre of disturbed wetland and 0.70 acre of drained hydric soil. 1.2 Project Goals and Objectives Site activities included the restoration and enhancement of Site streams and riparian wetlands. The following table summarizes the project goals/objectives and proposed functional uplift based on Site restoration activities and observations of reference areas. Table 1. Project Goals and Objectives Project Goal/Objective How Goal/Objective will be Accomplished Improve Hydrology Floodplain Connectivity Reconnect channels with historic floodplains Floodplain Resistance Plant woody riparian buffers; increase microtopography Stream Stability & Sediment Transport Reconstruct stream channels, sized to convey bankfull discharges and watershed sediment supplies Surface and Subsurface Storage and Retention Channels constructed or raised to historic floodplain elevations; increased floodplain hydraulic resistance by planting woody vegetation and increasing microtopography Improve Water Quality Remove Pollutant Sources Cattle exclusion and/or cessation of agricultural practices Upland Pollutant Filtration Plant woody riparian buffers; construct marsh treatment features intercepting overland flows Floodplain Biogeochemical Processing Increase floodplain connectivity; plant woody riparian buffers; increase microtopography; construct marsh treatment areas Thermal Regulation Plant woody riparian buffers to provide shade Restore Habitat In-channel Habitat Construct stable channels, geomorphology designed to increase hydraulic and bedform habitat heterogeneity Riparian Habitat and Structure Plant native, woody riparian buffers providing foraging, nesting, and cover for terrestrial species as well as refugia for aquatic species 1.3 Project Approach Restoration and protection of aquatic resources with a conservation easement will result in net gains in hydrology, water quality, and habitat functions at the Site and the Cape Fear 02 watershed. Site construction was completed on December 4, 2017 to February 9, 2018 and Site planting was completed on February 27, 2018. A summary of mitigation activities is summarized as follows and in Table 2. Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report page 2 Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC • Providing 5345 SMUs by the following: o Restoring approximately 4879 linear feet of perennial stream channels through construction of stable stream channels in the historic floodplain location and elevation; o Enhancing (level I) approximately 689 linear feet of stream channel by installing grade control structures, adjusting channel dimension, and planting of riparian buffers with native woody vegetation; and o Enhancing (level II) approximately 397 linear feet of stream channel by fencing livestock from the 50-foot vegetated buffer, supplemental planting of riparian buffers with native woody vegetation, and controlling invasive species. • Providing 0.92 WMUs by the following: • Restoring approximately 0.7 acres of riparian wetlands by reconstructing stream channels within the historic floodplain, removing livestock and row crop production, rehydrating floodplain soils, and planting with native woody vegetation; and • Enhancing approximately 0.44 acres of riparian wetlands by supplemental planting areas of disturbed forest, or removing livestock and planting with native forest vegetation. • Planting a native woody riparian buffer adjacent to all streams within the Site. • Protecting the Site in perpetuity with conservation easements. Table 2. Project Mitigation Types and Units Stream Mitigation Type Linear Feet Ratio Stream Mitigation Units Restoration 4879-152 = 4727* 1:1 4727 Enhancement (Level I) 689 1.5:1 459 Enhancement (Level II) 397 2.5:1 159 Totals 5965 5345 Wetland Mitigation Type Acreage Ratio Riparian Wetland Mitigation Units Riparian Restoration 0.70 1:1 0.70 Riparian Enhancement 0.44 2:1 0.22 Totals 1.14 0.92 *152 linear feet is non-crediting generating because it is located within three breaks in the easement. 2.0 MONITORING PLAN Monitoring requirements and success criteria outlined in this plan follow the October 24, 2016 NC Interagency Review Team Wilmington District Stream and Wetland Compensatory Mitigation Update (NCIRT 2016). Monitoring data collected at the Site should include reference photos, plant survival analysis, channel stability analysis, and biological data. Wetland hydrology is proposed to be monitored for a period of seven years (years 1-7). Riparian vegetation and stream morphology is proposed to be monitored for a period of seven years with measurements completed in years 1-3, year 5, and year 7. Macroinvertebrate sampling will be conducted in year 3, 5, and 7, although there are no performance standards tied to the results. Monitoring reports for years 4 and 6 will include photo documentation of stream stability and wetland hydrology monitoring data. If monitoring demonstrates the Site is successful by year 5 and no concerns have been identified, the Sponsor may propose to terminate monitoring at the Site and forego monitoring requirements for years 6 and 7. Early closure will only be provided through written approval from the USACE in consultation with the Interagency Review Team (IRT). Monitoring will be conducted by Axiom Environmental, Inc. Annual monitoring reports of the data collected will be submitted to the IRT by the Sponsor no later than December 31 of each monitoring year data is collected. The following table provides a monitoring schedule. Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report page 3 Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Table 3. Monitoring Schedule Resource Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Streams Wetlands Vegetation Macroinvertebrates Visual Assessment Report Submittal 2.1 Streams Ninety-seven permanent, monumented cross-sections were installed at an approximate frequency of one per 50 bankfull-widths, measured along the thalweg, along every reach where Stream Restoration mitigation activities were utilized. In general, cross-section locations were selected to equally represent pool and riffle areas and include areas more likely to exhibit instability. Cross-section locations are detailed in Figure 2 (Appendix A). Wolman Pebble Counts shall be conducted annually at a representative subset of cross-sections for the Site, spaced approximately 1000 linear feet apart, as measured along the thalweg, for longer Stream Restoration reaches. For shorter Stream Restoration reaches, at a minimum, at least one Wolman Pebble Count shall be conducted on each channel of at least 500 linear feet in length. Longitudinal profiles of thalweg, water surface, bankfull, and top-of-bank of each Stream Restoration reach are provided in the Site as-built survey. Additional profile surveys during the Stream Monitoring Period shall not be required unless evidence of bed and/or bank instability is observed. In such cases, the USACE, in consultation with the IRT, shall determine if remedial measures are necessary. If remedial measures are necessary, remedial monitoring and reporting may include additional longitudinal profiles. Two stream flow gauges were installed in the lower reaches of UT 1 (Figure 2, Appendix A). Determinations regarding the occurrence of bankfull events shall be based on the observation of overbank events utilizing a combination of staff gauges, automated trail cameras, as well as physical evidence of overbank flooding. Physical indicators, which are easily observable, include floodplain scour, vegetation flattening, sediment deposition on floodplains and wrack lines consisting of deposited debris associated with stream discharges. The presence of physical indicators supporting bankfull event determinations shall be photodocumented. Each bankfull monitoring event may be reported separately to the USACE from annual monitoring reports. 2.1.1 Stream Success Criteria Monitoring and success criteria for the Site should relate to project goals and objectives determined by NC SAM and NC WAM functional assessment methods (NCWAT 2010, NCSAT 2015). From a mitigation perspective, several of the goals and objectives are assumed to be functionally elevated by restoration activities without direct measurement. Other goals and objectives will be considered successful upon achieving stream, wetland, and/or vegetation success criteria. The following table summarizes stream success criteria related to goals and objectives. Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report page 4 Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Table 4. Functional Goal/Objectives and Performance Standards Functional Goals/Objectives Performance Standards and Monitoring (1) Hydrology (4)Microtopography Removal of cattle, and attaining Vegetation Success Criteria (3) Stream Stability Cross-sections, monitored annually, will be compared to as- built measurements to document channel stability and maintenance of channel geomorphology (4) Channel Stability (4) Sediment Transport (2) Surface Storage and Retention Four overbank events in separate monitoring years, and attaining Wetland and Vegetation Success Criteria (2) Subsurface Storage and Retention (1) Water Quality (2) Stream-side Area Vegetation Attaining Wetland and Vegetation Success Criteria (3) Upland Pollutant Filtration (2) Indicators of Stressors Removal of cattle, fencing intact, and easement encroachment avoided. (2) Aquatic Life Tolerance Cross-sections, monitored annually, will be compared to as- built measurements to document channel stability and maintenance of channel geomorphology and attaining Vegetation Success Criteria (2) Pathogen Change Removal of cattle, documentation of four overbank events in separate monitoring years, and attaining Wetland and Vegetation Success Criteria (2) Particulate Change (2) Soluble Change (2) Physical Change (1) Habitat (2) In-stream Habitat Cross-sections, monitored annually, will be compared to as- built measurements to document channel stability and maintenance of channel geomorphology and attaining Vegetation Success Criteria (3) Substrate (3) Stream Stability (3) In-stream Habitat (2) Stream-side Habitat Attaining Vegetation Success Criteria (2) Physical Structure Pebble counts documenting coarsening of bed material from pre-existing conditions of sand and silt to post restoration conditions of gravel and cobble, and attaining Vegetation Success Criteria (2) Landscape Patch Structure Attaining Vegetation Success Criteria (2) Vegetative Composition Stream success will be documented with measurements of stream stability including bank-height-ratio and entrenchment ratio. Specifically, bank-height-ratios shall not exceed 1.2 in regions of channel altered through design. In addition, the entrenchment ratio shall be no less than 2.2 within E-type or C-type channels and no less than 1.4 for B-type channels. Project channels shall remain stable and all other performance standards shall be met through four separate bankfull events, occurring in separate years, during the monitoring years 1 through 7. Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report page 5 Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Channels with intermittent, or questionable stream discharge (specifically UT 1) have stream flow gauges installed to document flow in the channel. Automated trail cameras were mounted in conjunction with stream flow gauges to document flow duration as well. Success of intermittent streams is expected to include 30 consecutive days of flow, along with more than one indicator of an ordinary high water mark as outlined in Regulatory Guidance Letter 05-05. 2.1.2 Stream Results Year 5 (2022) stream measurements were performed January 13-18, 2022. As a whole, monitoring measurements indicate minimal changes in the cross-sections as compared to as-built data. The channel geometry compares favorably with the proposed conditions as set forth in the detailed mitigation plan and as constructed. Across the site, all in-stream structures are intact and functioning as designed. No stream areas of concern were identified during year 5 (2022) monitoring. Tables for year 5 (2022) data and annual quantitative assessments are included in Appendix B. Two bankfull events were documented during year 5 (2022) for a total of 11 bankfull events during the monitoring period to-date, with events occurring during each of the 5 monitoring years (Table 10, Appendix D). Channel formation was evident in UT 1 in year 5 (2022). The two stream flow gauges and trail cameras documented 153 and 264 consecutive days of stream flow during year 5 (2022). The approximate locations of stream flow gauges are depicted on Figure 2 (Appendix A); a table containing channel formation indicators as well as stream flow gauge data are included in Appendix D. 2.2 Vegetation After planting was completed 17 vegetation sampling, sample plots (10-meter by 10-meter) were installed and measured within the Site as per guidelines established in CVS-EEP Protocol for Recording Vegetation, Version 4.2 (Lee et al. 2008). In each sample plot, vegetation parameters to be monitored include species composition and species density. Visual observations of the percent cover of shrub and herbaceous species will also be documented by photograph. 2.2.1 Vegetation Success Criteria An average density of 320 planted stems per acre must be surviving in the first three monitoring years. Subsequently, 290 planted stems per acre must be surviving in year 4, 260 planted stems per acre in year 5, and 210 planted stems per acre in year 7. In addition, planted vegetation must average 10 feet in height in each plot at year 7 since this Site is located in the Piedmont. Volunteer stems may be considered on a case- by-case basis in determining overall vegetation success; however, volunteer stems should be counted separately from planted stems. 2.2.2 Vegetation Results Year 5 (2022) stem count measurements were performed on October 12, 2022 and indicate an average of 726 planted stems per acre (excluding livestakes) across the Site; therefore, the Site is meeting vegetation success criteria. Additionally, all 17 individual vegetation plots met success criteria based on planted stems alone. Year 5 (2022) vegetation plot information can be found in Appendix C. Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report page 6 Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC 2.3 Wetland Hydrology Four groundwater monitoring gauges were installed at the Site in locations depicted on Figure 2 (Appendix A) to take measurements after hydrological modifications were performed. Hydrological sampling will continue throughout the growing season at intervals necessary to satisfy jurisdictional hydrology success criteria (USEPA 1990). In addition, rainfall data will be used for comparison of groundwater conditions with extended drought conditions. Visual observations in addition to automated trail cameras will be utilized to confirm overbank flooding events. 2.3.1 Wetland Hydrology Success Criteria Monitoring and success criteria for wetland re-establishment should relate to project goals and objectives. From a mitigation perspective, several of the goals and objectives are assumed to be functionally elevated by restoration activities without direct measurement. Other goals and objectives will be considered successful upon achieving vegetation success criteria. The following summarizes wetland success criteria related to goals and objectives. According to the Soil Survey of Alamance County (USDA 1960), the growing season occurs from April 17 – October 22. However, the start date for the growing season is not typical for the Piedmont region; therefore, for purposes of this project gauge hydrologic success will be determined using data from March 1 - October 22 to more accurately represent the period of biological activity. For wetland success criteria, March 1 shall be the earliest a growing season may start. Confirmation of the growing season must be accompanied by evidence of biological activity (bud burst and soil temperature). The growing season will not be considered to have started on March 1 if bud burst and soil temperature data do not meet the criteria outlined below. Based on growing season information outlined in the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Eastern Mountains and Piedmont Region (USACE 2012), this will be confirmed annually by soil temperatures exceeding 41 degrees Fahrenheit at 12 inches depth and/or bud burst. Bud burst is expected to follow the definition of “above ground growth” as outlined in the regional supplement (USACE 2012) including the emergence of herbaceous plants from the ground, appearance of new growth from vegetative crowns, sprouting seeds, green foliage visible between spreading bud scales, emergence or elongation of leaves of woody plants, and/or emergence of flowers. Bud burst, or “above ground growth” is expected to be observed on two, or more species of plant to satisfy this criterion. Photographic evidence of bud burst and field logs of date and temperature will be included in the annual monitoring reports. Target hydrological characteristics include saturation or inundation for 10 percent of the monitored period (March 1-October 22), during average climatic conditions. During years with atypical climatic conditions, groundwater gauges in reference wetlands may be used to ascertain if hydrology data may be modified by the IRT for that particular year. Reference gauge data is not proposed to alter growing season lengths, or hydrology success criteria without consent for the IRT. Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report page 7 Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Table 5. Summary of Monitoring Period/Hydrology Success Criteria by Year Year Soil Temperatures/Date Bud Burst Documented Monitoring Period Used for Determining Success** 10 Percent of Monitoring Period 2018 (Year 1) March 6, 2018* March 6-October 22 (230 days) 23 days 2019 (Year 2) March 1, 2019* March 1-October 22 (235 days) 24 days 2020 (Year 3) March 2, 2020* March 2-October 22 (234 days) 23 days 2021 (Year 4) March 1, 2021* March 1-November 9 (254 days) 26 days 2022 (Year 5) March 1, 2022* March 1-October 22 (235 days) 24 days * Based on documented bud burst and data collected from a soil temperature data logger located on the Site. ** During years 1-3, the growing season was determined based the Soil Survey of Alamance County (April 17 – October 22). However, based on a 2021 discussion with the IRT, concern arose that the Soil Survey growing season does not accurately represent the current growing season end date. As a result, the growing season methodology was changed to use the most current WETS (USDA 2021) data to determine the growing season end date. After year 4 review, the IRT requested that providers use the growing season methodology from the approved mitigation plan. 2.3.2 Wetland Hydrology Results All four groundwater gauges were successful in year 5 (2022). Gauge 4 appeared to have malfunctioned, showing erratic readings beginning on March 12. It was re-launched on April 28, but readings continued to appear erratic, so it was relaunched again on July 10. Readings after July 10 appear to be correct, and the gauge met success criteria during this time. Based on previous years data, the current year’s data from gauges 1-3, and field observations of saturation in the area surrounding gauge 4 well into the growing season, it is expected to have captured a significantly longer hydroperiod if functioning properly. Groundwater hydrology data is in Appendix D. 2.4 Biotic Community Changes Macroinvertebrate sampling will be conducted in accordance with the “Qual 4” method described in Standard Operating Procedures for Collection and Analysis of Benthic Macroinvertebrates, Version 5.0 (NCDWR 2016). In addition, sampling will occur during the “index period” referenced in Small Streams Biocriteria Development (NCDWQ 2009). Results will be presented on a site-by-site basis and will include a list of taxa collected, an enumeration of Ephemeroptera, Plecoptera, and Trichoptera taxa, as well as Biotic Index values. Post-construction macroinvertebrate sampling occurred during year 5 (2022), in accordance with the monitoring schedule (Table 3). Samples were collected June 7, 2022 and were sent to a qualified lab (Pennington and Associates Inc.) for processing; results and habitat data forms are included in Appendix F. Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report page 8 Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC 3.0 REFERENCES Lee, M.T., R.K. Peet, S.D. Roberts, and T.R. Wentworth. 2008. CVS-EEP Protocol for Recording Vegetation. Version 4.2. North Carolina Department of Environment and Natural Resources, Ecosystem Enhancement Program. Raleigh, North Carolina. North Carolina Division of Water Resources (NCDWR). 2016. Standard Operating Procedures for Collection and Analysis of Benthic Macroinvertebrates (Version 5.0). (online). Available: https://files.nc.gov/ncdeq/Water%20Quality/Environmental%20Sciences/BAU/NCDWRMacroin vertebrate-SOP-February%202016_final.pdf North Carolina Division of Water Quality (NCDWQ). 2009. Small Streams Biocriteria Development. Available: http://portal.ncdenr.org/c/document_library/get_file?uuid=2d54ad23-0345-4d6e-82fd- 04005f48eaa7&groupId=38364 North Carolina Interagency Review Team (NCIRT). 2016. Wilmington District Stream and Wetland Compensatory Mitigation Update. North Carolina Stream Functional Assessment Team. (NC SFAT 2015). N.C. Stream Assessment Method (NC SAM) User Manual. Version 2.1. North Carolina Wetland Functional Assessment Team. (NC WFAT 2010). N.C. Wetland Assessment Method (NC WAM) User Manual. Version 4.1. United States Department of Agriculture (USDA). 1960. Soil Survey of Alamance County, North Carolina. Soil Conservation Service. Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Appendix A. Figures Figure 1. Site Location Figure 2. Current Conditions Plan View Copyright:© 2013 National Geographic Society, i-cubed FIGURE Drawn by: Date: Scale: Project No.: KRJ FEB 2018 1:20000 15-007.01 Title: Project: Prepared for: Alamance County, NC MOTES CREEKMITIGATION BANK SITE LOCATION 1 ³ 0 1 20.5 Miles Notes: Background Imagery Sources (Provided by ESRI Data and Maps): 1. Physical Map of the United States (2009) Created by the U.S. Park Service (Upper Inset) 2. DeLorme World Basemap digital mapping (2010, lower inset) 3. Saxapahaw, NC (1972) and Mebane, NC (1969) 7.5- Minute Topographic Quadrangles provided by the U.S. Geological Survey Copyright:© 2013 National Geographic Society, i-cubed Copyright:© 2014 DeLorme ¬«54 M t .W i l l e n R o a d D o d s o n L a n e ¬«54 §¨¦40 §¨¦85 Directions to the Bank from Raleigh: -> From Raleigh travel west on I-40 for ~ 22 miles -> Take Exit 273A onto NC-54W towards Chapel Hill and follow for ~ 3.1 miles -> Merge onto US-15/501 S toward NC-54 W (Carrboro/Pittsboro) and follow for ~ 2 miles -> Stay straight onto NC-54 W (Fordham Blvd) and follow for ~ 16.5 miles -> Turn right onto Mt. Willen Road and follow for ~ 0.5 mile ->The Bank is located south of Mt. Willen Road Latitude: 35.988974° N, Longitude: 79.283907° W Legend Motes Creek Site County Lines (Inset) !( !( !( #* #* !( XS- 5 XS - 1 XS - 9 X S - 8 XS-25 XS-2 XS - 6 XS-26 X S - 4 XS-32 XS-31 XS-33 XS - 3 XS - 2 4 XS-20 X S - 1 4 XS - 1 1 X S - 2 3 XS - 1 9 XS-30 XS-29 XS-1 0 XS-34 XS-27 XS-17 X S - 7 XS- 1 3 XS-35 XS - 2 2 XS- 1 2 XS-21 XS- 1 8 XS-15 XS - 1 6 X S - 3 XS-15 XS-1 0 XS-11 XS- 1 0 XS-32 XS-13 X S - 5 X S - 6 XS-6 X S - 1 3 XS-1 2 XS-8 XS-1 XS-28 X S - 6 XS-14 XS-29 XS-30 XS-5 XS-4 XS-18 XS-23 XS-9 XS-7 XS-24 XS- 1 9 XS-2 XS-11 XS-2 XS-3 X S - 1 XS - 8 XS-7 XS-4 XS - 4 XS- 1 9 XS-3 XS - 2 0 XS - 1 XS - 9 XS-31 XS-2 0 X S - 1 2 XS - 2 1 X S - 1 5 XS- 1 6 XS- 2 8 XS-17 X S - 2 2 XS- 1 6 XS-18 XS - 1 4 XS-24 XS- 2 XS-22 X S - 2 6 X S - 5 XS- 2 3 XS- 2 7 XS- 2 5 X S - 1 7 XS-21 54 2 3 8 6 1 7 9 11 13 10 1517 16 12 14 NC Center for Geographic Information & Anaylsis FIGURE Drawn by: Date: Scale: Project No.: KRJ OCT 2022 1:2500 15-007.01 Title: Project: Prepared for: Alamance County, NC MOTES CREEKMITIGATIONBANK CURRENTCONDITIONSPLAN VIEW 2 ³ Legend Motes Creek Easement = 19.1 ac Stream Restoration = 4727 ft Stream Enhancement (Level I) = 689 ft Stream Enhancement (Level II) = 397 ft Wetland Restoration = 0.70 ac Wetland Enhancement = 0.44 ac Cross Sections CVS Plots Meeting Success Criteria During MY-5 (2022) !(Groundwater Gauges Meeting Success Criteria during MY-5 (2022) #*Stream Gauge 0 500 1,000250Feet UT-1 M o t e s C r e e k UT-2 UT-3 1 2 3 4 Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Appendix B Morphological Summary Data and Plots Tables 6A-6D. Baseline Morphology and Hydraulic Summary Tables 7A-7H. Morphology and Hydraulic Monitoring Summary Cross-section Plots Parameter Dimension Min Max Med Min Max Med Min Max Med Min Max Med Min Max Med Min Max Med BF Width (ft)10.3 20.9 14.1 8 12.1 8.1 10.7 11.3 11 10.4 13.8 12.1 9.8 15.7 12.1 Floodprone Width (ft)17 100 43 15 25 18 122 140 131 30 150 75 50 BF Cross Sectional Area (ft2)9 11.9 10.5 8 14.7 9 11.9 10.5 6.1 16.0 9.4 BF Mean Depth (ft)0.4 1.1 0.8 0.8 1 0.8 1.3 1.4 1.4 0.9 1 0.8 0.6 1.0 0.8 BF Max Depth (ft)0.9 1.9 1.5 1.1 1.4 1.4 1.9 2 2 1 1.4 1.2 0.8 1.7 1.2 Width/Depth Ratio 10 52 23 8 15.1 10.1 8 9 9 12 16 14 12 22 16 Entrenchment Ratio 1.7 8.9 3.1 1.9 2.2 2.1 11 13 12 4.8 11.6 6.1 3.2 5.1 4.1 Bank Height Ratio 1.2 3.5 2 1 1.8 1 1.4 1 1.2 1.1 1.0 Wetted Perimeter(ft)============10.2 16.1 12.5 Hydraulic radius (ft)============0.4 1.0 0.8 Pattern Channel Beltwidth (ft)20 38 22.8 17 36 29.8 22 65 36 22 65 36 Radius of Curvature (ft)11 27 16.5 9 113 30.6 22 129 36 22 129 36 Meander Wavelength (ft)44 116 68.4 10 91 62.9 67 155 103 67 155 103 Meander Width ratio 2.4 4.7 2.8 1.5 3.5 2.7 2 5 3 2 5 3 Profile Riffle length (ft)=========10 72 24 Riffle slope (ft/ft)1.00%5.76%3.16%0.20%1.20%0.98%0.82%2.14%1.90%0.00%3.11%1.45% Pool length (ft)=========5 41 20 Pool spacing (ft)25 69 37.2 2 7.4 4 34 103 49 34 103 49 Substrate d50 (mm)=============== d84 (mm)=============== Additional Reach Parameters Valley Length (ft)============1640 Channel Length (ft)============1886 Sinuosity 1.08 1.2 1.46 1.15 1.15 Water Surface Slope (ft/ft)1.06%2.58%0.53%0.68 - 1.19% 0.93% BF slope (ft/ft)=============== Rosgen Classification C/F 5 E 4/5 E 4/5 E/C 3/4 E/C 3/4 Table 6A. Baseline Morphology and Hydraulic Summary USGS Gage Data Pre-Existing Condition Project Reference Cedarock Park Design As-builtProject Reference Causey Farm Motes Creek USGS gage data is unavailable for this project No pattern of riffles and pools due to straightening activties No pattern of riffles and pools due to straightening activties Parameter Dimension Min Max Med Min Max Med Min Max Med Min Max Med Min Max Med Min Max Med BF Width (ft)4.6 9.6 7.6 8 12.1 8.1 10.7 11.3 11 7.6 8.8 8.2 8.6 12.3 10.3 Floodprone Width (ft)10 50 40 15 25 18 122 140 131 30 90 50 50 BF Cross Sectional Area (ft2)5.3 8 14.7 4.8 3.0 8.6 5.3 BF Mean Depth (ft)0.3 1.2 0.7 0.8 1 0.8 1.3 1.4 1.4 0.5 0.6 0.6 0.3 0.8 0.5 BF Max Depth (ft)0.7 1.6 1.3 1.1 1.4 1.4 1.9 2 2 0.7 0.9 0.8 0.6 1.3 0.8 Width/Depth Ratio 4 32 16 8 15.1 10.1 8 9 9 12 16 14 13 29 19 Entrenchment Ratio 1.4 11 5.8 1.9 2.2 2.1 11 13 12 4.3 12.9 7.1 4.1 5.8 4.9 Bank Height Ratio 1.3 2.6 2 1 1.8 1 1.4 1 1.2 1.1 1.0 Wetted Perimeter(ft)============8.7 12.6 10.5 Hydraulic radius (ft)============0.3 0.8 0.5 Pattern Channel Beltwidth (ft)20 38 22.8 17 36 29.8 16 41 25 16 41 25 Radius of Curvature (ft)11 27 16.5 9 113 30.6 16 82 25 16 82 25 Meander Wavelength (ft)44 116 68.4 10 91 62.9 49 98 70 49 98 70 Meander Width ratio 2.4 4.7 2.8 1.5 3.5 2.7 2 5 3 2 5 3 Profile Riffle length (ft)=========4 60 16 Riffle slope (ft/ft)1.00%5.76%3.16%0.20%1.20%0.98%1.73%2.59%2.30%0.00%3.89%1.53% Pool length (ft)=========4 30 14 Pool spacing (ft)25 69 37.2 2 7.4 4 24 66 33 24 66 33 Substrate d50 (mm)=============== d84 (mm)=============== Additional Reach Parameters Valley Length (ft)============1204 Channel Length (ft)============1385 Sinuosity 1.11 1.2 1.46 1.15 1.15 Water Surface Slope (ft/ft)1.72%2.58%0.53%0.68 - 1.19% 1.39% BF slope (ft/ft)=============== Rosgen Classification Cg5 E 4/5 E 4/5 E/C 3/4 E/C 3/4 Table 6B. Baseline Morphology and Hydraulic Summary Motes Creek - UT 1 USGS Gage Data Pre-Existing Condition Project Reference Cedarock Park Project Reference Causey Farm Design As-built USGS gage data is unavailable for this project No pattern of riffles and pools due to straightening activties No pattern of riffles and pools due to straightening activties Parameter Dimension Min Max Med Min Max Med Min Max Med Min Max Med Min Max Med Min Max Med BF Width (ft)5.4 11.5 8.3 8 12.1 8.1 10.7 11.3 11 7.6 11 9.3 7.9 11.8 9.4 Floodprone Width (ft)12 75 31 15 25 18 122 140 131 30 150 75 50 BF Cross Sectional Area (ft2)4.8 7..6 6.2 8 14.7 4.8 7.6 6.2 2.8 12.2 6.0 BF Mean Depth (ft)0.4 0.9 0.8 0.8 1 0.8 1.3 1.4 1.4 0.5 0.7 0.6 0.3 1.0 0.6 BF Max Depth (ft)0.9 1.5 1.3 1.1 1.4 1.4 1.9 2 2 0.7 1.1 0.9 0.5 1.7 1.0 Width/Depth Ratio 6 29 12 8 15.1 10.1 8 9 9 12 16 14 11 26 15 Entrenchment Ratio 1.4 8.1 3.8 1.9 2.2 2.1 11 13 12 4.3 14.5 8.4 1.8 6.3 5.3 Bank Height Ratio 1.7 2.4 2 1 1.8 1 1.4 1 1.2 1.1 1.0 Wetted Perimeter(ft)============8.0 12.5 10.1 Hydraulic radius (ft)============0.3 1.0 0.6 Pattern Channel Beltwidth (ft)20 38 22.8 17 36 29.8 16 52 28 16 52 28 Radius of Curvature (ft)11 27 16.5 9 113 30.6 16 103 28 16 103 28 Meander Wavelength (ft)44 116 68.4 10 91 62.9 49 124 79 49 124 79 Meander Width ratio 2.4 4.7 2.8 1.5 3.5 2.7 2 5 3 2 5 3 Profile Riffle length (ft)=========3 80 15 Riffle slope (ft/ft)1.00%5.76%3.16%0.20%1.20%0.98%1.73%2.59%2.02%0.00%4.87%1.40% Pool length (ft)=========8 32 16 Pool spacing (ft)25 69 37.2 2 7.4 4 24 83 37 24 66 33 Substrate d50 (mm)=============== d84 (mm)=============== Additional Reach Parameters Valley Length (ft)============1661 Channel Length (ft)============1910 Sinuosity 1.09 1.2 1.46 1.15 1.15 Water Surface Slope (ft/ft)1.28 =- 1.54% 2.58%0.53%1.08 - 1.44% 1.28% BF slope (ft/ft)=============== Rosgen Classification Eg5 E 4/5 E 4/5 E/C 3/4 E/C 3/4 Table 6C. Baseline Morphology and Hydraulic Summary Motes Creek - UT 2 USGS Gage Data Pre-Existing Condition Project Reference Cedarock Park Project Reference Causey Farm Design As-built USGS gage data is unavailable for this project No pattern of riffles and pools due to straightening activties No pattern of riffles and pools due to straightening activties Parameter Dimension Min Max Med Min Max Med Min Max Med Min Max Med Min Max Med Min Max Med BF Width (ft)4.3 5.3 4.8 8 12.1 8.1 10.7 11.3 11 7.6 8.8 8.2 7.3 9.6 8.4 Floodprone Width (ft)50 15 25 18 122 140 131 30 90 50 50 BF Cross Sectional Area (ft2)3.9 8 14.7 4.8 1.3 5.0 3.6 BF Mean Depth (ft)0.7 0.9 0.8 0.8 1 0.8 1.3 1.4 1.4 0.5 0.6 0.6 0.1 0.6 0.5 BF Max Depth (ft)1 1.3 1.2 1.1 1.4 1.4 1.9 2 2 0.7 0.9 0.8 0.3 1.1 0.8 Width/Depth Ratio 4.8 7.6 6.2 8 15.1 10.1 8 9 9 12 16 14 13 71 18 Entrenchment Ratio 9.4 11.6 10.5 1.9 2.2 2.1 11 13 12 4.3 12.9 7.1 3.1 6.8 6.0 Bank Height Ratio 1.7 1 1.8 1 1.4 1 1.2 1.1 1.0 Wetted Perimeter(ft)============7.6 9.7 8.7 Hydraulic radius (ft)============0.1 0.6 0.5 Pattern Channel Beltwidth (ft)20 38 22.8 17 36 29.8 16 41 25 16 41 25 Radius of Curvature (ft)11 27 16.5 9 113 30.6 16 82 25 16 82 25 Meander Wavelength (ft)44 116 68.4 10 91 62.9 49 98 70 49 98 70 Meander Width ratio 2.4 4.7 2.8 1.5 3.5 2.7 2 5 3 2 5 3 Profile Riffle length (ft)=========6 22 13 Riffle slope (ft/ft)1.00%5.76%3.16%0.20%1.20%0.98%1.73%2.59%2.30%0.23%4.22%1.73% Pool length (ft)=========7 18 11 Pool spacing (ft)25 69 37.2 2 7.4 4 24 66 33 24 66 33 Substrate d50 (mm)=============== d84 (mm)=============== Additional Reach Parameters Valley Length (ft)============269 Channel Length (ft)============309 Sinuosity 1.13 1.2 1.46 1.15 1.15 Water Surface Slope (ft/ft)1.49%2.58%0.53%1.44%1.46% BF slope (ft/ft)=============== Rosgen Classification Eg4 E 4/5 E 4/5 E/C 3/4 E/C 3/4 Table 6D. Baseline Morphology and Hydraulic Summary Motes Creek - UT 3 USGS Gage Data Pre-Existing Condition Project Reference Cedarock Park Project Reference Causey Farm Design As-built USGS gage data is unavailable for this project No pattern of riffles and pools due to straightening activties No pattern of riffles and pools due to straightening activties Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)15.5 14.8 15.6 17.0 16.4 15.0 14.0 14.0 15.9 16.4 14.5 15.7 14.8 20.7 18.1 10.7 11.6 11.2 12.2 11.7 14.6 16.9 16.2 16.7 14.1 Floodprone Width (ft)50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 -------------------- BF Cross Sectional Area (ft2)16.0 13.1 15.4 15.4 15.4 14.4 12.6 12.9 12.9 12.9 12.9 11.8 12.9 12.9 12.9 7.1 7.1 7.1 7.1 7.1 16.0 16.0 16.0 16.0 16.0 BF Mean Depth (ft)1.0 0.9 1.0 0.9 0.9 1.0 0.9 0.9 0.8 0.8 0.9 0.8 0.9 0.6 0.7 0.7 0.6 0.6 0.6 0.6 1.1 0.9 1.0 1.0 1.1 BF Max Depth (ft)1.7 1.5 1.6 1.6 1.6 1.5 1.4 1.4 1.5 1.5 1.3 1.1 1.4 1.2 1.3 1.1 1.0 1.0 0.9 1.0 2.1 2.2 2.2 2.2 2.2 Low Bank Height (ft)1.7 1.5 1.6 1.7 1.6 1.5 1.4 1.4 1.6 1.5 1.3 1.1 1.4 1.2 1.2 1.1 1.0 1.0 0.9 1.0 2.1 2.2 2.2 2.3 2.3 Width/Depth Ratio 15.0 16.7 15.8 18.8 17.4 15.6 15.6 15.2 19.6 20.9 16.3 20.9 17.0 33.2 25.4 16.1 19.0 17.7 21.0 19.3 -------------------- Entrenchment Ratio 3.2 3.4 3.2 2.9 3.1 3.3 3.6 3.6 3.1 3.0 3.4 3.2 3.4 2.4 2.8 4.7 4.3 4.5 4.1 4.3 -------------------- Bank Height Ratio 1.0 1.0 1.0 1.1 1.0 1.0 1.0 1.0 1.1 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 -------------------- Wetted Perimeter (ft)16.1 15.2 16.0 17.5 16.9 15.5 14.5 14.4 19.6 16.9 14.9 16.0 15.1 21.0 18.4 11.1 11.8 11.5 12.5 11.9 15.3 17.7 17.0 17.7 15.1 Hydraulic Radius (ft)1.0 0.9 1.0 0.9 0.9 0.9 0.9 0.9 0.7 0.8 0.9 0.7 0.9 0.6 0.7 0.6 0.6 0.6 0.6 0.6 1.0 0.9 0.9 0.9 1.1 Substrate d50 (mm)6.2 7.7 9.0 8.4 ----6.2 7.7 9.0 8.4 ----6.2 7.7 9.0 8.4 ----6.2 7.7 9.0 8.4 ----6.2 7.7 9.0 8.4 ---- d84 (mm)30.0 34.0 36.0 36.0 ----30.0 34.0 36.0 36.0 ----30.0 34.0 36.0 36.0 ----30.0 34.0 36.0 36.0 ----30.0 34.0 36.0 36.0 ---- Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)14.2 18.4 16.5 17.9 16.6 13.8 14.1 14.1 16.4 16.5 11.7 12.8 12.0 12.0 11.7 11.5 12.2 12.3 13.2 13.2 11.4 11.8 11.3 12.3 13.8 Floodprone Width (ft)50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 --------------------50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 BF Cross Sectional Area (ft2)10.5 10.5 10.5 10.5 10.5 11.9 11.9 11.9 11.9 11.9 13.0 13.0 13.0 13.0 13.0 9.5 9.5 9.5 9.5 9.5 9.3 8.3 9.3 9.3 9.3 BF Mean Depth (ft)0.7 0.6 0.6 0.6 0.6 0.9 0.8 0.8 0.7 0.7 1.1 1.0 1.1 1.1 1.1 0.8 0.8 0.8 0.7 0.7 0.8 0.7 0.8 0.8 0.7 BF Max Depth (ft)1.2 1.1 1.1 1.2 1.2 1.5 1.5 1.4 1.4 1.4 1.8 1.7 1.8 1.8 1.9 1.2 1.2 1.2 1.2 1.2 1.3 1.1 1.3 1.3 1.2 Low Bank Height (ft)1.2 1.1 1.1 1.2 1.2 1.5 1.5 1.4 1.4 1.3 1.8 1.7 1.9 1.9 1.9 1.2 1.2 1.2 1.2 1.2 1.3 1.1 1.3 1.3 1.0 Width/Depth Ratio 19.2 32.2 25.9 30.5 26.3 16.0 16.7 16.7 22.6 22.9 --------------------13.9 15.7 15.9 18.3 18.5 14.0 16.8 13.7 16.3 20.4 Entrenchment Ratio 3.5 2.7 3.0 2.8 3.0 3.6 3.5 3.5 3.0 3.0 --------------------4.3 4.1 4.1 3.8 3.8 4.4 4.2 4.4 4.1 3.6 Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.94 --------------------1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.8 Wetted Perimeter (ft)14.6 18.7 16.8 18.2 16.9 14.4 14.6 14.7 16.9 17.0 12.5 13.6 12.7 12.7 12.6 11.9 12.6 12.7 13.6 13.6 11.8 12.1 11.7 12.7 14.1 Hydraulic Radius (ft)0.7 0.6 0.6 0.6 0.6 0.8 0.8 0.8 0.7 0.7 1.0 1.0 1.0 1.0 1.0 0.8 0.8 0.7 0.7 0.7 0.8 0.7 0.8 0.7 0.7 Substrate d50 (mm)6.2 7.7 9.0 8.4 ----6.2 7.7 9.0 8.4 ----6.2 7.7 9.0 8.4 ----6.2 7.7 9.0 8.4 ----6.2 7.7 9.0 8.4 ---- d84 (mm)30.0 34.0 36.0 36.0 ----30.0 34.0 36.0 36.0 ----30.0 34.0 36.0 36.0 ----30.0 34.0 36.0 36.0 ----30.0 34.0 36.0 36.0 ---- Table 7A. Morphology and Hydraulic Monitoring Summary Motes Creek XS 1 Riffle (Motes Creek)XS 2 Riffle (Motes Creek)XS 3 Riffle (Motes Creek)XS 4 Riffle (Motes Creek)XS 5 Pool (Motes Creek) XS 6 Riffle (Motes Creek)XS 7 Riffle (Motes Creek)XS 8 Pool (Motes Creek)XS 9 Riffle (Motes Creek)XS 10 Riffle (Motes Creek) Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)12.7 11.8 12.9 13.4 14.2 11.6 12.8 14.4 12.2 13.5 12.1 13.1 10.1 9.5 9.5 13.5 13.8 13.0 15.6 15.7 11.0 12.0 12.0 11.5 11.2 Floodprone Width (ft)50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 --------------------50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 BF Cross Sectional Area (ft2)9.0 7.7 9.0 9.0 9.0 6.5 6.5 6.5 6.5 6.5 13.0 13.0 13.0 13.0 13.0 8.4 7.7 8.1 8.1 8.1 6.1 6.1 6.1 6.1 6.1 BF Mean Depth (ft)0.7 0.7 0.7 0.7 0.6 0.6 0.5 0.5 0.5 0.5 1.1 1.0 1.3 1.4 1.4 0.6 0.6 0.6 0.5 0.5 0.6 0.5 0.5 0.5 0.5 BF Max Depth (ft)1.1 0.9 1.1 1.1 1.0 0.8 0.8 0.7 1.3 1.3 1.9 1.9 2.1 1.9 2.0 1.0 0.9 0.9 0.9 1.0 0.9 0.8 0.7 0.8 0.8 Low Bank Height (ft)1.1 0.9 1.1 1.1 0.9 0.8 0.8 0.7 1.3 1.3 1.9 1.9 2.5 2.0 2.2 1.0 0.9 0.9 0.9 0.9 0.9 0.8 0.8 0.8 0.9 Width/Depth Ratio 17.9 18.1 18.5 20.0 22.3 20.7 25.2 31.9 22.9 28.0 --------------------21.7 24.7 20.9 30.0 30.4 19.8 23.6 23.6 21.7 20.8 Entrenchment Ratio 3.9 4.2 3.9 3.7 3.5 4.3 3.9 3.5 4.1 3.7 --------------------3.7 3.6 3.8 3.2 3.2 4.5 4.2 4.2 4.3 4.5 Bank Height Ratio 1.0 1.0 1.0 1.0 0.9 1.0 1.0 1.0 1.0 1.0 --------------------1.0 1.0 1.0 1.0 0.93 1.0 1.0 1.1 1.0 1.0 Wetted Perimeter (ft)13.0 12.2 13.2 13.7 14.4 11.8 13.0 14.5 12.7 14.2 13.2 14.1 14.1 11.0 10.8 13.8 14.0 13.2 15.8 16.0 11.4 12.2 12.2 11.7 12.0 Hydraulic Radius (ft)0.7 0.6 0.7 0.7 0.6 0.6 0.5 0.4 0.5 0.5 1.0 0.9 0.9 1.2 1.2 0.6 0.6 0.6 0.5 0.5 0.5 0.5 0.5 0.5 0.5 Substrate d50 (mm)6.2 7.7 9.0 8.4 ----6.2 7.7 9.0 8.4 ----6.2 7.7 9.0 8.4 ----6.2 7.7 9.0 8.4 ----6.2 7.7 9.0 8.4 ---- d84 (mm)30.0 34.0 36.0 36.0 ----30.0 34.0 36.0 36.0 ----30.0 34.0 36.0 36.0 ----30.0 34.0 36.0 36.0 ----30.0 34.0 36.0 36.0 ---- Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)11.3 11.8 10.5 11.2 11.9 8.9 9.1 6.4 6.3 7.9 9.8 10.1 10.3 12.0 10.5 14.6 17.0 17.1 18.8 20.4 11.2 12.0 11.2 18.5 18.5 Floodprone Width (ft)50.0 50.0 50.0 50.0 50.0 --------------------50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 -------------------- BF Cross Sectional Area (ft2)7.7 7.7 7.7 7.7 7.7 6.7 6.7 6.7 6.7 6.7 6.1 6.1 6.1 6.1 6.1 12.6 12.6 12.6 12.6 12.6 13.3 13.3 13.3 13.3 13.3 BF Mean Depth (ft)0.7 0.7 0.7 0.7 0.6 0.8 0.7 1.0 1.1 0.9 0.6 0.6 0.6 0.5 0.6 0.9 0.7 0.7 0.7 0.6 1.2 1.1 1.2 0.7 BF Max Depth (ft)1.0 1.1 1.2 1.4 1.5 1.7 1.7 1.6 1.6 1.6 0.9 0.8 1.1 1.0 1.0 1.3 1.1 1.2 1.1 1.1 2.1 2.2 2.0 1.4 1.3 Low Bank Height (ft)1.0 1.1 1.3 1.4 1.5 1.7 1.7 1.9 1.6 1.5 0.9 0.8 1.0 1.0 1.1 1.3 1.1 1.2 1.1 1.0 2.1 2.2 1.8 0.7 1.0 Width/Depth Ratio 16.6 18.1 14.3 16.3 18.4 --------------------15.7 16.7 17.4 23.6 18.1 16.9 22.9 23.2 28.1 33.1 -------------------- Entrenchment Ratio 4.4 4.2 4.8 4.5 4.2 --------------------5.1 5.0 4.9 4.2 4.8 3.4 2.9 2.9 2.7 2.4 -------------------- Bank Height Ratio 1.0 1.0 1.1 1.0 1.0 --------------------1.0 1.0 0.9 1.0 1.06 1.0 1.0 1.0 1.0 0.94 -------------------- Wetted Perimeter (ft)11.7 12.2 11.1 11.9 12.8 9.6 10.2 7.6 7.5 9.3 10.2 10.3 10.6 12.3 10.8 15.1 17.3 17.4 19.1 20.6 12.5 12.9 12.6 18.7 18.8 Hydraulic Radius (ft)0.7 0.6 0.7 0.6 0.6 0.7 0.7 0.9 0.9 0.7 0.6 0.6 0.6 0.5 0.6 0.8 0.7 0.7 0.7 0.6 1.1 1.0 1.1 0.7 0.7 Substrate d50 (mm)6.2 7.7 9.0 8.4 ----6.2 7.7 9.0 8.4 ----6.2 7.7 9.0 8.4 ----6.2 7.7 9.0 8.4 ----6.2 7.7 9.0 8.4 ---- d84 (mm)30.0 34.0 36.0 36.0 ----30.0 34.0 36.0 36.0 ----30.0 34.0 36.0 36.0 ----30.0 34.0 36.0 36.0 ----30.0 34.0 36.0 36.0 ---- XS 15 Riffle (Motes Creek) XS 16 Riffle (Motes Creek)XS 17 Pool (Motes Creek)XS 18 Riffle (Motes Creek)XS 19 Riffle (Motes Creek)XS 20 Pool (Motes Creek) XS 11 Riffle (Motes Creek)XS 12 Riffle (Motes Creek) Motes Creek Table 7A continued. Morphology and Hydraulic Monitoring Summary XS 13 Pool (Motes Creek)XS 14 Riffle (Motes Creek) Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)9.0 14.5 10.9 15.3 15.4 10.0 9.9 9.2 9.3 11.2 14.7 16.6 14.6 14.3 14.8 10.6 10.2 9.9 9.3 10.3 12.0 11.1 10.1 9.0 7.2 Floodprone Width (ft)--------------------50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 BF Cross Sectional Area (ft2)11.4 11.2 11.2 11.2 11.2 6.6 6.6 6.6 6.6 6.6 12.6 12.6 12.6 12.6 12.6 7.1 7.1 7.1 7.1 7.1 8.6 8.2 8.2 8.2 8.2 BF Mean Depth (ft)1.3 0.8 1.0 0.7 0.7 0.7 0.7 0.7 0.7 0.6 0.9 0.8 0.9 0.9 0.9 0.7 0.7 0.7 0.8 0.7 0.7 0.7 0.8 0.9 1.1 BF Max Depth (ft)1.8 1.7 1.9 1.7 1.6 1.0 1.0 1.0 1.0 1.1 1.4 1.5 1.9 1.7 1.8 1.1 1.1 1.2 1.0 1.1 1.2 1.3 1.4 1.5 1.6 Low Bank Height (ft)1.8 1.7 1.9 1.5 1.0 1.0 1.0 1.1 1.1 1.2 1.4 1.5 1.9 1.7 1.8 1.1 1.2 1.2 1.0 1.4 1.2 1.3 1.6 1.5 1.6 Width/Depth Ratio --------------------15.2 14.9 12.8 13.1 19.2 17.2 21.9 16.9 16.2 17.5 15.8 14.7 13.8 12.2 14.8 16.7 15.0 12.4 9.9 6.4 Entrenchment Ratio --------------------5.0 5.1 5.4 5.4 4.4 3.4 3.0 3.4 3.5 3.4 4.7 4.9 5.1 5.4 4.9 4.2 4.5 5.0 5.6 6.9 Bank Height Ratio --------------------1.0 1.0 1.1 1.1 1.08 1.0 1.0 1.0 1.0 1.0 1.0 1.1 1.0 1.0 1.2 1.0 1.0 1.1 1.0 1.0 Wetted Perimeter (ft)10.7 15.2 12.2 16.2 16.1 10.3 10.2 9.6 9.7 11.6 15.1 17.0 15.3 15.0 15.5 10.9 10.6 10.4 9.8 10.8 12.4 11.4 10.8 9.9 8.3 Hydraulic Radius (ft)1.1 0.7 0.9 0.7 0.7 0.6 0.6 0.7 0.7 0.6 0.8 0.7 0.8 0.8 0.8 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.8 0.8 1.0 Substrate d50 (mm)6.2 7.7 9 8.4 ----6.2 7.7 9 8.4 ----6.2 7.7 9 8.4 ----6.2 7.7 9 8.4 ----6.2 7.7 9 8.4 ---- d84 (mm)30 34 36 36 ----30 34 36 36 ----30 34 36 36 ----30 34 36 36 ----30 34 36 36 ---- Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)10.5 11.4 10.2 10.6 10.2 12.2 13.4 11.5 9.5 10.4 15.7 15.6 15.5 14.2 14.7 10.2 10.2 9.4 11.4 11.1 13.5 13.6 12.6 15.0 16.5 Floodprone Width (ft)50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 ---------------------------------------- BF Cross Sectional Area (ft2)7.2 7.2 7.2 7.2 7.2 9.8 9.8 9.8 9.8 9.8 13.4 13.4 13.4 13.4 13.4 11.7 11.7 11.7 11.7 11.7 15.8 15.3 15.2 15.2 15.2 BF Mean Depth (ft)0.7 0.6 0.7 0.7 0.7 0.8 0.7 0.9 1.0 0.9 0.9 0.9 0.9 0.9 0.9 1.1 1.1 1.2 1.0 1.1 1.2 1.1 1.2 1.0 0.9 BF Max Depth (ft)0.9 0.9 1.3 1.2 1.5 1.4 1.4 1.4 1.6 1.7 1.5 1.3 1.4 1.6 1.8 1.8 1.9 1.9 1.8 2.0 1.9 2.0 1.9 2.0 1.9 Low Bank Height (ft)0.9 0.9 1.3 1.2 1.7 1.4 1.4 1.3 1.7 1.9 1.5 1.3 1.4 1.6 1.9 1.8 1.9 1.9 1.8 2.0 1.9 2.0 1.9 2.0 1.7 Width/Depth Ratio 15.3 18.1 14.5 15.6 14.5 15.2 18.3 13.5 9.2 11.0 18.4 18.2 17.9 15.0 16.2 ---------------------------------------- Entrenchment Ratio 4.8 4.4 4.9 4.7 4.9 4.1 3.7 4.3 5.3 4.8 3.2 3.2 3.2 3.5 3.4 ---------------------------------------- Bank Height Ratio 1.0 1.0 1.0 1.0 1.12 1.0 1.0 0.9 1.1 1.07 1.0 1.0 1.0 1.0 1.0 ---------------------------------------- Wetted Perimeter (ft)10.8 11.6 10.6 10.9 10.8 12.6 14.0 12.2 10.5 11.3 16.1 16.0 15.8 14.8 15.6 11.2 11.3 10.5 12.4 12.4 14.4 14.5 13.5 16.0 17.8 Hydraulic Radius (ft)0.7 0.6 0.7 0.7 0.7 0.8 0.7 0.8 0.9 0.9 0.8 0.8 0.8 0.9 0.9 1.1 1.0 1.1 0.9 0.9 1.1 1.1 1.1 1.0 0.9 Substrate d50 (mm)6.2 7.7 9 8.4 ----6.2 7.7 9 8.4 ----6.2 7.7 9 8.4 ----6.2 7.7 9 8.4 ----6.2 7.7 9 8.4 ---- d84 (mm)30 34 36 36 ----30 34 36 36 ----30 34 36 36 ----30 34 36 36 ----30 34 36 36 ---- XS 25 Riffle (Motes Creek) XS 26 Riffle (Motes Creek)XS 27 Riffle (Motes Creek)XS 28 Riffle (Motes Creek)XS 29 Pool (Motes Creek)XS 30 Pool (Motes Creek) Table 7A continued. Morphology and Hydraulic Monitoring Summary Motes Creek XS 21 Pool (Motes Creek)XS 22 Riffle (Motes Creek)XS 23 Riffle (Motes Creek)XS 24 Riffle (Motes Creek) Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)12.4 12.4 11.8 11.7 11.7 12.0 11.4 11.6 12.8 12.5 Floodprone Width (ft)50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 BF Cross Sectional Area (ft2)12.4 11.1 11.1 11.1 11.1 10.2 8.5 9.4 9.4 9.4 BF Mean Depth (ft)1.0 0.9 0.9 0.9 0.9 0.9 0.7 0.8 0.7 0.7 BF Max Depth (ft)1.4 1.3 1.4 1.6 1.6 1.3 1.1 1.3 1.2 1.3 Low Bank Height (ft)1.4 1.3 1.4 1.6 1.6 1.3 1.1 1.3 1.2 1.2 Width/Depth Ratio 12.4 13.9 12.5 12.3 12.4 14.1 15.3 14.3 17.4 16.8 Entrenchment Ratio 4.0 4.0 4.2 4.3 4.3 4.2 4.4 4.3 3.9 4.0 Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.92 Wetted Perimeter (ft)13.2 13.1 12.3 12.4 12.4 12.4 11.9 12.0 13.2 13.0 Hydraulic Radius (ft)0.9 0.8 0.9 0.9 0.9 0.8 0.7 0.8 0.7 0.7 Substrate d50 (mm)6.2 7.7 9 8.4 ----6.2 7.7 9 8.4 ---- d84 (mm)30 34 36 36 ----30 34 36 36 ---- Parameter Min Max Med Min Max Med Min Max Med Min Max Med Min Max Med Min Max Med Pattern Channel Beltwidth (ft)22 65 36 Radius of Curvature (ft)22 129 36 Meander Wavelength (ft)67 155 103 Meander Width Ratio 2 5 3 Profile Riffle Length (ft)10 72 24 Riffle Slope (ft/ft)0.00%3.11%1.45% Pool Length (ft)5 41 20 Pool Spacing (ft)34 103 49 Additonal Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) BF Slope (ft/ft) Rosgen Classification Profile surveys during the stream monitoring period are not required, unless evidence of bed and/or bank instability is observed and the data is requested by the IRT. C/E 3/4 ------ 0.0093 1.15 1,886 1,640 Motes Creek MY-00 (2018)MY-01 (2018)MY-02 (2019)MY-03 (2020)MY-05 (2022)MY-07 (2024) Table 7B. Morphology and Hydraulic Monitoring Summary Table 7A continued. Morphology and Hydraulic Monitoring Summary Motes Creek XS 31 Riffle (Motes Creek)XS 32 Riffle (Motes Creek) Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)9.2 9.1 10.0 8.7 9.3 9.5 11.2 10.8 12.8 13.5 11.5 13.4 13.9 15.0 9.1 10.0 10.3 9.6 9.9 10.0 12.3 12.7 12.7 14.1 15.6 Floodprone Width (ft)50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 ----------------------------------------50.0 50.0 50.0 50.0 50.0 BF Cross Sectional Area (ft2)4.0 4.0 4.0 4.0 4.0 3.8 3.7 3.8 3.8 3.8 8.2 8.2 8.0 8.0 8.0 9.5 9.2 9.2 9.2 9.2 7.3 6.9 6.9 6.9 6.9 BF Mean Depth (ft)0.4 0.4 0.4 0.5 0.4 0.4 0.3 0.4 0.3 0.3 0.7 0.6 0.6 0.5 0.9 1.0 0.9 1.0 0.9 0.9 0.6 0.5 0.5 0.5 0.4 BF Max Depth (ft)0.8 0.6 0.7 0.7 0.7 0.6 0.5 0.5 0.6 0.6 1.4 1.3 1.4 1.5 1.6 1.6 1.6 1.6 1.7 1.7 0.8 0.8 0.8 0.8 0.7 Low Bank Height (ft)0.8 0.7 0.8 0.8 0.8 0.6 0.5 0.6 0.6 0.5 1.4 1.3 1.3 1.5 1.6 1.6 1.6 1.6 1.7 1.9 0.8 0.8 0.8 0.8 0.7 Width/Depth Ratio 21.2 20.7 25.0 18.9 21.5 23.8 33.9 30.7 43.1 47.8 ----------------------------------------20.7 23.4 23.4 28.8 35.2 Entrenchment Ratio 5.4 5.5 5.0 5.7 5.4 5.3 4.5 4.6 3.9 3.7 ----------------------------------------4.1 3.9 3.9 3.5 3.2 Bank Height Ratio 1.0 1.2 1.1 1.1 1.07 1.0 1.0 1.2 1.0 0.85 ----------------------------------------1.0 1.0 1.0 1.0 1.0 Wetted Perimeter (ft)9.6 9.2 10.2 9.0 9.6 9.6 11.2 10.8 13.0 13.6 12.1 13.8 13.8 15.6 10.0 10.7 10.9 10.3 10.6 10.8 12.6 12.9 13.0 14.4 15.7 Hydraulic Radius (ft)0.4 0.4 0.4 0.4 0.4 0.4 0.3 0.4 0.3 0.3 0.7 0.6 0.6 0.5 0.8 0.9 0.8 0.9 0.9 0.9 0.6 0.5 0.5 0.5 0.4 Substrate d50 (mm)6.1 7.3 6.6 6.9 ----6.1 7.3 6.6 6.9 ----6.1 7.3 6.6 6.9 ----6.1 7.3 6.6 6.9 ----6.1 7.3 6.6 6.9 ---- d84 (mm)38 39.0 41 44 ----38 39.0 41 44 ----38 39.0 41 44 ----38 39.0 41 44 ----38 39.0 41 44 ---- Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)9.5 12.2 9.9 10.7 9.8 10.6 9.2 8.8 12.5 11.4 10.2 9.5 8.8 9.5 10.3 10.1 10.6 10.2 9.8 10.5 10.3 10.2 9.2 12.0 12.4 Floodprone Width (ft)50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 --------------------50.0 50.0 50.0 50.0 50.0 BF Cross Sectional Area (ft2)5.9 5.9 5.9 5.9 5.9 5.1 3.2 3.4 3.4 3.4 5.9 4.2 4.2 4.2 4.2 8.7 8.7 8.7 8.7 8.7 3.7 3.7 3.7 3.7 3.7 BF Mean Depth (ft)0.6 0.5 0.6 0.6 0.6 0.5 0.3 0.4 0.3 0.3 0.6 0.4 0.5 0.4 0.4 0.9 0.8 0.9 0.9 0.8 0.4 0.4 0.4 0.3 0.3 BF Max Depth (ft)1.0 0.9 1.0 1.1 1.0 0.8 0.5 0.7 0.6 0.6 1.0 0.7 0.7 0.7 0.7 1.5 1.5 1.6 1.7 1.4 0.6 0.6 0.6 0.6 0.6 Low Bank Height (ft)1.0 0.9 1.0 1.1 1.0 0.8 0.5 0.7 0.6 0.5 1.0 0.7 0.7 0.8 0.7 1.5 1.5 1.6 1.7 1.6 0.6 0.6 0.6 0.6 0.6 Width/Depth Ratio 15.3 25.2 16.6 19.4 16.2 22.0 26.5 22.8 46.0 37.8 17.6 21.5 18.4 21.5 25.7 --------------------28.7 28.1 22.9 38.9 41.1 Entrenchment Ratio 5.3 4.1 5.1 4.7 5.1 4.7 5.4 5.7 4.0 4.4 4.9 5.3 5.7 5.3 4.8 --------------------4.9 4.9 5.4 4.2 4.0 Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.81 1.0 1.0 1.0 1.1 1.0 --------------------1.0 1.0 1.0 1.0 1.0 Wetted Perimeter (ft)9.9 12.4 10.2 11.1 10.1 10.9 9.3 8.9 12.6 11.6 10.4 9.6 9.0 9.7 10.5 10.7 11.2 10.8 10.5 11.3 10.5 10.3 9.3 12.1 12.5 Hydraulic Radius (ft)0.6 0.5 0.6 0.5 0.6 0.5 0.3 0.4 0.3 0.3 0.6 0.4 0.5 0.4 0.4 0.8 0.8 0.8 0.8 0.8 0.4 0.4 0.4 0.3 0.3 Substrate d50 (mm)6.1 7.3 6.6 6.9 ----6.1 7.3 6.6 6.9 ----6.1 7.3 6.6 6.9 ----6.1 7.3 6.6 6.9 ----6.1 7.3 6.6 6.9 ---- d84 (mm)38 39.0 41 44 ----38 39.0 41 44 ----38 39.0 41 44 ----38 39.0 41 44 ----38 39.0 41 44 ---- XS 5 Riffle (UT 1) XS 6 Riffle (UT 1)XS 7 Riffle (UT 1)XS 8 Riffle (UT 1)XS 9 Pool (UT 1)XS 10 Riffle (UT 1) Table 7C. Morphology and Hydraulic Monitoring Summary Motes Creek - UT 1 XS 1 Riffle (UT 1)XS 2 Riffle (UT 1)XS 3 Pool (UT 1)XS 4 Pool (UT 1) Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)8.4 8.4 6.9 6.7 5.9 10.4 11.4 11.3 12.1 12.7 9.6 10.0 11.1 14.7 12.8 10.2 9.6 10.4 10.5 9.1 11.0 11.9 9.6 10.9 12.6 Floodprone Width (ft)--------------------50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 --------------------50.0 50.0 50.0 50.0 50.0 BF Cross Sectional Area (ft2)5.2 5.2 5.2 5.2 5.2 5.4 4.5 4.5 4.5 4.5 5.4 5.3 5.4 5.4 5.4 8.8 7.9 7.9 7.9 7.9 7.3 4.9 4.9 4.9 4.9 BF Mean Depth (ft)0.6 0.6 0.8 0.8 0.9 0.5 0.4 0.4 0.4 0.4 0.6 0.5 0.5 0.4 0.4 0.9 0.8 0.8 0.8 0.9 0.7 0.4 0.5 0.4 0.4 BF Max Depth (ft)1.1 1.1 1.2 1.2 1.2 1.0 0.7 0.7 0.7 0.8 0.8 0.8 0.8 0.8 0.8 1.5 1.5 1.5 1.5 1.5 1.0 0.7 0.7 0.8 0.7 Low Bank Height (ft)1.1 1.1 1.2 1.2 1.4 1.0 0.7 0.7 0.7 0.7 0.8 0.8 0.8 0.7 0.8 1.5 1.5 1.4 1.5 1.4 1.0 0.7 0.7 0.8 0.7 Width/Depth Ratio --------------------20.0 28.9 28.4 32.5 36.0 17.1 18.9 22.8 40.0 30.1 --------------------16.6 28.9 18.8 24.2 32.6 Entrenchment Ratio --------------------4.8 4.4 4.4 4.1 3.9 5.2 5.0 4.5 3.4 3.9 --------------------4.5 4.2 5.2 4.6 4.0 Bank Height Ratio --------------------1.0 1.0 1.0 1.0 0.91 1.0 1.0 1.0 0.9 0.94 --------------------1.0 1.0 1.0 1.0 1.0 Wetted Perimeter (ft)8.9 8.8 7.4 7.4 6.8 10.7 11.5 11.5 12.2 12.9 9.9 10.4 11.3 15.0 12.9 10.8 10.2 11.0 11.2 10.1 11.3 12.0 9.8 11.1 12.8 Hydraulic Radius (ft)0.6 0.6 0.7 0.7 0.8 0.5 0.4 0.4 0.4 0.3 0.5 0.5 0.5 0.4 0.4 0.8 0.8 0.7 0.7 0.8 0.6 0.4 0.5 0.4 0.4 Substrate d50 (mm)6.1 7.3 6.6 6.9 ----6.1 7.3 6.6 6.9 ----6.1 7.3 6.6 6.9 ----6.1 7.3 6.6 6.9 ----6.1 7.3 6.6 6.9 ---- d84 (mm)38 39.0 41 44 ----38 39.0 41 44 ----38 39.0 41 44 ----38 39.0 41 44 ----38 39.0 41 44 ---- Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)9.2 10.6 9.9 9.7 11.0 9.0 9.4 9.3 12.4 9.8 8.6 9.3 9.1 10.9 12.1 12.2 11.7 10.1 9.5 13.4 11.0 11.6 10.7 10.9 11.6 Floodprone Width (ft)50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 --------------------50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 BF Cross Sectional Area (ft2)4.8 4.8 4.8 4.8 4.8 4.4 3.2 3.2 3.2 3.2 6.5 5.9 6.5 6.5 6.5 6.2 5.0 5.0 5.0 5.0 5.2 5.2 5.2 5.2 5.2 BF Mean Depth (ft)0.5 0.5 0.5 0.5 0.4 0.5 0.3 0.3 0.3 0.3 0.8 0.6 0.7 0.6 0.5 0.5 0.4 0.5 0.5 0.4 0.5 0.4 0.5 0.5 0.4 BF Max Depth (ft)0.9 0.8 0.7 0.7 1.0 0.8 0.8 0.5 0.7 0.8 1.2 1.1 1.1 1.1 1.1 0.9 0.7 0.8 0.8 0.8 0.8 0.7 0.8 1.1 1.0 Low Bank Height (ft)0.9 0.8 0.9 0.7 1.0 0.8 0.8 0.5 0.7 0.7 1.2 1.1 1.2 1.1 1.0 0.9 0.7 0.7 0.8 0.8 0.8 0.7 0.8 1.1 1.1 Width/Depth Ratio 17.6 23.4 20.4 19.6 25.0 18.4 27.6 27.0 48.1 29.5 --------------------24.0 27.4 20.4 18.1 35.8 23.3 25.9 22.0 22.8 25.9 Entrenchment Ratio 5.4 4.7 5.1 5.2 4.6 5.6 5.3 5.4 4.0 5.1 --------------------4.1 4.3 5.0 5.3 3.7 4.5 4.3 4.7 4.6 4.3 Bank Height Ratio 1.0 1.0 1.3 1.0 1.0 1.0 1.0 1.0 1.0 1.0 --------------------1.0 1.0 0.9 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Wetted Perimeter (ft)9.5 10.8 10.2 9.9 11.4 9.4 9.7 9.5 12.5 10.0 9.1 9.6 9.5 11.3 12.6 12.5 11.8 10.4 9.7 13.9 11.2 11.7 10.9 11.4 12.1 Hydraulic Radius (ft)0.5 0.4 0.5 0.5 0.4 0.5 0.3 0.3 0.3 0.3 0.7 0.6 0.7 0.6 0.5 0.5 0.4 0.5 0.5 0.4 0.5 0.4 0.5 0.5 0.4 Substrate d50 (mm)6.1 7.3 6.6 6.9 ----6.1 7.3 6.6 6.9 ----6.1 7.3 6.6 6.9 ----6.1 7.3 6.6 6.9 ----6.1 7.3 6.6 6.9 ---- d84 (mm)38 39.0 41 44 ----38 39.0 41 44 ----38 39.0 41 44 ----38 39.0 41 44 ----38 39.0 41 44 ---- XS 15 Riffle (UT 1) XS 16 Riffle (UT 1)XS 17 Riffle (UT 1)XS 18 Pool (UT 1)XS 19 Riffle (UT 1)XS 20 Riffle (UT 1) Table 7C continued. Morphology and Hydraulic Monitoring Summary Motes Creek - UT 1 XS 11 Pool (UT 1)XS 12 Riffle (UT 1)XS 13 Riffle (UT 1)XS 14 Pool (UT 1) Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)8.6 12.0 8.0 7.3 8.2 7.3 8.8 7.5 6.9 6.5 10.4 11.4 11.2 14.0 15.5 12.5 12.7 16.7 16.5 18.4 Floodprone Width (ft)50.0 50.0 50.0 50.0 50.0 --------------------50.0 50.0 50.0 50.0 50.0 -------------------- BF Cross Sectional Area (ft2)3.0 3.0 3.0 3.0 3.0 9.2 8.1 8.1 8.1 8.1 8.6 7.7 7.7 7.7 7.7 18.1 16.4 16.4 16.4 16.4 BF Mean Depth (ft)0.3 0.3 0.4 0.4 0.4 1.3 0.9 1.1 1.2 1.2 0.8 0.7 0.7 0.5 0.5 1.4 1.3 1.0 1.0 BF Max Depth (ft)0.6 0.5 0.6 0.8 0.7 1.8 1.5 1.6 1.7 1.8 1.3 1.1 1.1 1.2 1.1 2.5 2.1 2.1 2.1 2.1 Low Bank Height (ft)0.6 0.5 0.6 0.8 0.7 1.8 1.5 1.6 1.9 1.9 1.3 1.1 1.1 1.2 1.1 2.5 2.1 2.0 2.0 1.8 Width/Depth Ratio 24.7 48.0 21.3 17.8 22.3 --------------------12.6 16.9 16.3 28.0 31.0 -------------------- Entrenchment Ratio 5.8 4.2 6.3 6.8 6.1 --------------------4.8 4.4 4.5 3.6 3.2 -------------------- Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 --------------------1.0 1.0 1.0 1.0 1.0 -------------------- Wetted Perimeter (ft)8.7 12.0 8.1 7.5 8.4 9.3 9.6 8.7 8.3 8.2 10.8 13.9 11.5 14.5 19.7 14.1 13.9 17.8 17.7 19.7 Hydraulic Radius (ft)0.3 0.3 0.4 0.4 0.4 1.0 0.8 0.9 1.0 1.0 0.8 0.6 0.7 0.5 0.4 1.3 1.2 0.9 0.9 0.8 Substrate d50 (mm)6.1 7.3 6.6 6.9 ----6.1 7.3 6.6 6.9 ----6.1 7.3 6.6 6.9 ----6.1 7.3 6.6 6.9 ---- d84 (mm)38 39.0 41 44 ----38 39.0 41 44 ----38 39.0 41 44 ----38 39.0 41 44 ---- Parameter Min Max Med Min Max Med Min Max Med Min Max Med Min Max Med Min Max Med Pattern Channel Beltwidth (ft)16 41 25 Radius of Curvature (ft)16 82 25 Meander Wavelength (ft)49 98 70 Meander Width Ratio 2 5 3 Profile Riffle Length (ft)4 60 16 Riffle Slope (ft/ft)0.00%3.89%1.53% Pool Length (ft)4 30 14 Pool Spacing (ft)24 66 33 Additonal Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) BF Slope (ft/ft) Rosgen Classification Profile surveys during the stream monitoring period are not required, unless evidence of bed and/or bank instability is observed and the data is requested by the IRT. C/E 3/4 ------ 0.0129 1.15 1,385 1,204 Table 7D. Morphology and Hydraulic Monitoring Summary Motes Creek - UT 1 MY-00 (2018)MY-01 (2018)MY-02 (2019)MY-03 (2020)MY-05 (2022)MY-07 (2024) Table 7C continued. Morphology and Hydraulic Monitoring Summary Motes Creek - UT 1 XS 21 Riffle (UT 1)XS 22 Pool (UT 1)XS 23 Riffle (UT 1)XS 24 Pool (UT 1) Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)11.8 11.1 11.3 10.4 10.7 11.6 11.2 12.4 15.3 14.9 8.4 11.0 10.3 10.7 10.2 9.4 11.2 10.6 10.8 12.0 9.2 8.9 8.9 8.7 9.3 Floodprone Width (ft)50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 --------------------50.0 50.0 50.0 50.0 50.0 -------------------- BF Cross Sectional Area (ft2)12.2 9.3 9.3 9.3 9.3 11.4 7.7 10.9 10.9 10.9 7.2 7.1 7.2 7.2 7.2 6.6 6.6 6.6 6.6 6.6 8.4 8.4 8.4 8.4 8.4 BF Mean Depth (ft)1.0 0.8 0.8 0.9 0.9 1.0 0.7 0.9 0.7 0.7 0.9 0.6 0.7 0.7 0.7 0.7 0.6 0.6 0.6 0.6 0.9 0.9 0.9 1.0 0.9 BF Max Depth (ft)1.7 1.2 1.4 1.5 1.6 1.6 1.1 1.3 1.4 1.4 1.5 1.5 1.5 1.6 1.6 1.1 1.0 1.0 1.1 1.1 1.6 1.5 1.5 1.6 1.6 Low Bank Height (ft)1.7 1.2 1.4 1.5 1.5 1.6 1.1 1.1 1.4 1.3 1.5 1.5 1.5 1.6 1.5 1.1 1.0 1.0 1.1 1.0 1.6 1.5 1.5 1.6 1.4 Width/Depth Ratio 11.4 13.2 13.7 11.6 12.3 11.8 16.3 14.1 21.5 20.2 --------------------13.4 19.0 17.0 17.7 21.7 -------------------- Entrenchment Ratio 4.2 4.5 4.4 4.8 4.7 4.3 4.5 4.0 3.3 3.4 --------------------5.3 4.5 4.7 4.6 4.2 -------------------- Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.8 1.0 1.0 --------------------1.0 1.0 1.0 1.0 1.0 -------------------- Wetted Perimeter (ft)12.5 11.5 11.7 10.9 11.3 12.2 11.7 12.9 15.7 15.4 9.1 11.6 10.9 11.4 10.9 9.8 11.6 10.9 11.1 12.4 10.0 9.7 9.7 9.6 10.3 Hydraulic Radius (ft)1.0 0.8 0.8 0.9 0.8 0.9 0.7 0.8 0.7 0.7 0.8 0.6 0.7 0.6 0.7 0.7 0.6 0.6 0.6 0.5 0.8 0.9 0.9 0.9 0.8 Substrate d50 (mm)7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ---- d84 (mm)36 33 34 24 ----36 33 34 24 ----36 33 34 24 ----36 33 34 24 ----36 33 34 24 ---- Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)10.9 11.8 11.8 11.3 11.7 10.3 10.4 10.3 11.6 11.6 8.9 10.9 9.8 13.4 10.4 10.5 11.0 9.9 10.5 9.0 9.4 9.6 9.5 12.1 10.9 Floodprone Width (ft)50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 --------------------50.0 50.0 50.0 50.0 50.0 BF Cross Sectional Area (ft2)9.1 7.8 7.8 7.8 7.8 5.9 5.9 5.9 5.9 5.9 7.0 5.7 5.7 5.7 5.7 9.3 8.3 8.3 8.3 8.3 7.1 6.6 6.6 6.6 6.6 BF Mean Depth (ft)0.8 0.7 0.7 0.7 0.7 0.6 0.6 0.6 0.5 0.5 0.8 0.5 0.6 0.4 0.5 0.9 0.8 0.8 0.8 0.9 0.8 0.7 0.7 0.5 0.6 BF Max Depth (ft)1.3 1.1 1.0 1.1 1.2 0.8 0.8 0.9 0.8 1.0 1.2 0.9 0.8 0.9 0.9 1.9 1.8 1.9 1.9 2.1 1.3 1.2 1.2 1.1 1.1 Low Bank Height (ft)1.3 1.1 1.0 1.1 1.2 0.8 0.8 0.9 0.8 0.8 1.2 0.9 0.8 0.9 0.9 1.9 1.8 1.9 1.9 1.9 1.3 1.2 1.2 1.1 1.1 Width/Depth Ratio 13.1 17.9 17.9 16.4 17.5 18.0 18.3 18.0 22.8 23.0 11.3 20.8 16.8 31.5 18.8 --------------------12.4 14.0 13.7 22.2 18.1 Entrenchment Ratio 4.6 4.2 4.2 4.4 4.3 4.9 4.8 4.9 4.3 4.3 5.6 4.6 5.1 3.7 4.8 --------------------5.3 5.2 5.3 4.1 4.6 Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.81 1.0 1.0 1.0 1.0 1.0 --------------------1.0 1.0 1.0 1.0 1.0 Wetted Perimeter (ft)11.5 12.2 12.2 11.6 12.1 10.7 10.7 10.5 11.8 12.0 9.5 11.2 10.0 13.6 10.6 11.7 11.9 10.9 11.4 10.4 10.1 9.9 9.9 12.5 11.4 Hydraulic Radius (ft)0.8 0.6 0.6 0.7 0.6 0.6 0.6 0.6 0.5 0.5 0.7 0.5 0.6 0.4 0.5 0.8 0.7 0.8 0.7 0.8 0.7 0.7 0.7 0.5 0.6 Substrate d50 (mm)7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ---- d84 (mm)36 33 34 24 ----36 33 34 24 ----36 33 34 24 ----36 33 34 24 ----36 33 34 24 ---- XS 5 Pool (UT 2) XS 6 Riffle (UT 2)XS 7 Riffle (UT 2)XS 8 Riffle (UT 2)XS 9 Pool (UT 2)XS 10 Riffle (UT 2) Table 7E. Morphology and Hydraulic Monitoring Summary Motes Creek - UT 2 XS 1 Riffle (UT 2)XS 2 Riffle (UT 2)XS 3 Pool (UT 2)XS 4 Riffle (UT 2) Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)11.5 12.2 11.8 11.0 11.0 9.9 10.3 11.7 11.1 11.3 14.7 11.6 11.6 12.5 12.0 9.3 9.4 9.3 10.6 10.1 8.1 8.2 8.3 8.4 8.7 Floodprone Width (ft)50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 --------------------50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 BF Cross Sectional Area (ft2)10.0 8.7 8.7 8.7 8.7 4.9 4.9 4.9 4.9 4.9 11.2 7.9 7.9 7.9 7.9 4.5 4.5 4.5 4.5 4.5 3.4 3.4 3.4 3.4 3.4 BF Mean Depth (ft)0.9 0.7 0.7 0.8 0.8 0.5 0.5 0.4 0.4 0.4 0.8 0.7 0.7 0.6 0.7 0.5 0.5 0.5 0.4 0.4 0.4 0.4 0.4 0.4 0.4 BF Max Depth (ft)1.3 1.2 1.2 1.2 1.1 0.7 0.6 0.7 0.7 0.8 1.4 1.3 1.2 1.3 1.4 0.7 0.8 0.9 0.8 0.6 0.6 0.6 0.6 0.6 0.8 Low Bank Height (ft)1.3 1.2 1.2 1.3 1.2 0.7 0.6 0.7 0.7 0.8 1.4 1.3 1.2 1.3 1.2 0.7 0.8 0.9 0.8 0.7 0.6 0.6 0.6 0.6 0.9 Width/Depth Ratio 13.2 17.1 16.0 13.9 13.9 20.0 21.7 27.9 25.1 26.1 --------------------19.2 19.6 19.2 25.0 22.6 19.3 19.8 20.3 20.8 22.2 Entrenchment Ratio 4.3 4.1 4.2 4.5 4.5 5.1 4.9 4.3 4.5 4.4 --------------------5.4 5.3 5.4 4.7 4.9 6.2 6.1 6.0 6.0 5.7 Bank Height Ratio 1.0 1.0 1.0 1.1 1.12 1.0 1.0 1.0 1.0 1.0 --------------------1.0 1.0 1.0 1.0 1.14 1.0 1.0 1.0 1.0 1.12 Wetted Perimeter (ft)12.0 12.6 12.2 11.4 11.4 10.3 10.5 11.9 11.2 11.5 15.1 12.0 12.0 12.9 12.5 9.5 9.7 9.6 10.8 10.4 8.4 8.4 8.5 8.6 9.0 Hydraulic Radius (ft)0.8 0.7 0.7 0.8 0.8 0.5 0.5 0.4 0.4 0.4 0.7 0.7 0.7 0.6 0.6 0.5 0.5 0.5 0.4 0.4 0.4 0.4 0.4 0.4 0.4 Substrate d50 (mm)7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ---- d84 (mm)36 33 34 24 ----36 33 34 24 ----36 33 34 24 ----36 33 34 24 ----36 33 34 24 ---- Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)9.1 9.1 9.2 9.2 8.5 9.2 10.4 10.2 12.3 13.9 10.0 11.6 9.4 10.1 10.1 11.3 11.7 11.4 10.2 10.7 8.5 11.9 9.0 11.9 9.1 Floodprone Width (ft)--------------------50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 --------------------50.0 50.0 50.0 50.0 50.0 BF Cross Sectional Area (ft2)7.3 7.3 7.3 7.3 7.3 4.9 4.5 4.5 4.5 4.5 6.1 6.1 6.1 6.1 6.1 10.2 9.7 9.7 9.7 9.7 4.9 4.9 4.9 4.9 4.9 BF Mean Depth (ft)0.8 0.8 0.8 0.8 0.9 0.5 0.4 0.4 0.4 0.3 0.6 0.5 0.6 0.6 0.6 0.9 0.8 0.9 1.0 0.9 0.6 0.4 0.5 0.4 0.5 BF Max Depth (ft)1.3 1.3 1.4 1.3 1.5 0.7 0.7 0.8 0.7 0.7 1.0 1.0 1.7 1.4 1.5 1.5 1.5 1.5 1.6 1.7 1.1 0.9 1.0 0.9 0.8 Low Bank Height (ft)1.3 1.3 1.4 1.4 1.4 0.7 0.7 0.8 0.7 0.8 1.0 1.0 1.7 1.4 1.3 1.5 1.5 1.5 1.6 1.8 1.1 0.9 1.0 0.9 0.8 Width/Depth Ratio --------------------17.3 24.0 23.1 33.6 42.7 16.4 22.1 14.5 16.7 17.0 --------------------14.7 28.9 16.5 28.9 17.0 Entrenchment Ratio --------------------5.4 4.8 4.9 4.1 3.6 5.0 4.3 5.3 5.0 4.9 --------------------5.9 4.2 5.6 4.2 5.5 Bank Height Ratio --------------------1.0 1.0 1.0 1.0 1.09 1.0 1.0 1.0 1.0 0.89 --------------------1.0 1.0 1.0 1.0 1.0 Wetted Perimeter (ft)9.6 9.6 9.8 9.7 9.2 9.5 10.6 10.4 12.5 14.1 10.4 11.8 10.4 10.7 10.9 11.9 11.6 12.1 10.9 11.5 9.0 12.1 9.2 12.1 9.4 Hydraulic Radius (ft)0.8 0.8 0.7 0.8 0.8 0.5 0.4 0.4 0.4 0.3 0.6 0.5 0.6 0.6 0.6 0.9 0.8 0.8 0.9 0.8 0.5 0.4 0.5 0.4 0.5 Substrate d50 (mm)7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ---- d84 (mm)36 33 34 24 ----36 33 34 24 ----36 33 34 24 ----36 33 34 24 ----36 33 34 24 ---- XS 15 Riffle (UT 2) XS 16 Pool (UT 2)XS 17 Riffle (UT 2)XS 18 Riffle (UT 2)XS 19 Pool (UT 2)XS 20 Riffle (UT 2) Table 7E continued. Morphology and Hydraulic Monitoring Summary Motes Creek - UT 2 XS 11 Riffle (UT 2)XS 12 Riffle (UT 2)XS 13 Pool (UT 2)XS 14 Riffle (UT 2) Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)8.8 9.4 10.1 11.2 10.3 7.9 8.0 7.7 8.2 8.4 9.2 10.8 10.3 11.7 10.9 8.6 7.8 8.1 9.7 7.7 8.2 12.7 10.5 11.5 11.3 Floodprone Width (ft)--------------------50.0 50.0 50.0 50.0 50.0 --------------------50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 BF Cross Sectional Area (ft2)10.3 8.9 9.3 9.3 9.3 2.8 2.8 2.8 2.8 2.8 6.3 6.3 6.3 6.3 6.3 3.9 2.6 2.6 2.6 2.6 4.6 4.6 4.6 4.6 4.6 BF Mean Depth (ft)1.2 0.9 0.9 0.8 0.9 0.4 0.4 0.4 0.3 0.3 0.7 0.6 0.6 0.5 0.6 0.5 0.3 0.3 0.3 0.3 0.6 0.4 0.4 0.4 0.4 BF Max Depth (ft)2.0 1.8 1.8 1.8 1.9 0.6 0.6 0.6 0.6 0.6 1.2 1.2 1.2 1.2 1.3 0.7 0.6 0.6 0.5 0.5 0.9 0.9 1.0 0.9 0.9 Low Bank Height (ft)2.0 1.8 1.8 1.9 1.9 0.6 0.6 0.6 0.6 0.6 1.2 1.2 1.2 1.2 1.2 0.7 0.6 0.6 0.6 0.6 0.9 0.9 1.0 0.9 0.8 Width/Depth Ratio --------------------22.3 22.9 21.2 24.0 25.3 --------------------19.0 23.4 25.2 36.2 22.6 14.6 35.1 24.0 28.8 28.2 Entrenchment Ratio --------------------6.3 6.3 6.5 6.1 6.0 --------------------1.5 1.8 1.9 1.9 1.6 1.6 2.5 2.3 2.3 2.3 Bank Height Ratio --------------------1.0 1.0 1.0 1.0 1.05 --------------------1.0 1.0 1.0 1.2 1.10 1.0 1.0 1.0 1.0 0.91 Wetted Perimeter (ft)9.9 10.3 11.0 12.1 11.5 8.0 8.1 7.8 8.3 8.6 9.7 11.2 10.7 12.1 11.7 8.8 7.9 8.2 9.8 9.8 8.6 12.9 10.8 11.7 11.7 Hydraulic Radius (ft)1.0 0.9 0.8 0.8 0.8 0.4 0.3 0.4 0.3 0.3 0.6 0.6 0.6 0.5 0.5 0.4 0.3 0.3 0.3 0.3 0.5 0.4 0.4 0.4 0.4 Substrate d50 (mm)7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ---- d84 (mm)36 33 34 24 ----36 33 34 24 ----36 33 34 24 ----36 33 34 24 ----36 33 34 24 ---- Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)8.9 8.0 8.6 8.7 8.6 8.2 8.4 8.0 7.5 5.9 8.8 8.9 9.5 11.9 12.2 10.7 11.7 11.0 9.8 10.6 11.8 13.0 11.5 11.5 11.4 Floodprone Width (ft)50.0 50.0 50.0 50.0 50.0 --------------------50.0 50.0 50.0 50.0 50.0 30.0 30.0 30.0 30.0 30.0 -------------------- BF Cross Sectional Area (ft2)3.0 3.0 3.0 3.0 3.0 6.4 5.6 5.8 5.8 5.8 6.0 4.7 5.0 5.0 5.0 5.1 5.1 5.1 5.1 5.1 10.2 10.2 10.2 10.2 10.2 BF Mean Depth (ft)0.3 0.4 0.3 0.3 0.3 0.8 0.7 0.7 0.8 1.0 0.7 0.5 0.5 0.4 0.4 0.5 0.4 0.5 0.5 0.5 0.9 0.8 0.9 0.9 0.9 BF Max Depth (ft)0.5 0.6 0.6 0.6 0.7 1.3 1.4 1.3 1.4 1.4 1.1 1.0 0.8 0.9 0.9 0.7 0.7 0.8 0.7 0.8 1.9 1.8 2.1 1.8 2.0 Low Bank Height (ft)0.5 0.6 0.6 0.6 0.6 1.3 1.4 1.3 1.4 1.7 1.1 1.0 0.8 0.9 1.0 0.7 0.7 0.8 0.7 0.9 1.9 1.8 2.1 1.9 1.6 Width/Depth Ratio 26.4 21.3 24.7 25.2 24.7 --------------------12.9 16.9 18.1 28.3 29.5 22.4 26.8 23.7 18.8 22.0 -------------------- Entrenchment Ratio 5.6 6.3 5.8 5.7 5.8 --------------------5.7 5.6 5.3 4.2 4.1 2.8 2.6 2.7 3.1 2.8 -------------------- Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 --------------------1.0 1.0 1.0 1.0 1.08 1.0 1.0 1.0 1.0 1.18 -------------------- Wetted Perimeter (ft)9.0 8.1 8.7 8.8 9.9 8.8 8.9 8.5 8.3 6.9 9.3 9.2 9.7 12.2 13.0 10.9 12.0 11.1 10.1 10.8 13.2 14.4 13.1 12.6 12.8 Hydraulic Radius (ft)0.3 0.4 0.3 0.3 0.3 0.7 0.6 0.7 0.7 0.8 0.6 0.5 0.5 0.4 0.4 0.5 0.4 0.5 0.5 0.5 0.8 0.7 0.8 0.8 0.8 Substrate d50 (mm)7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ---- d84 (mm)36 33 34 24 ----36 33 34 24 ----36 33 34 24 ----36 33 34 24 ----36 33 34 24 ---- XS 25 Riffle (UT 2) XS 26 Riffle (UT 2)XS 27 Pool (UT 2)XS 28 Riffle (UT 2)XS 29 Riffle (UT 2)XS 30 Pool (UT 2) Table 7E continued. Morphology and Hydraulic Monitoring Summary Motes Creek - UT 2 XS 21 Pool (UT 2)XS 22 Riffle (UT 2)XS 23 Pool (UT 2)XS 24 Riffle (UT 2) Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)10.5 11.4 11.5 11.3 12.0 13.8 15.0 14.6 14.6 13.8 11.0 11.2 11.2 11.2 11.5 5.3 5.8 5.6 5.9 5.5 10.8 11.8 12.1 11.4 11.7 Floodprone Width (ft)19.0 19.0 19.0 19.0 19.0 --------------------30.0 30.0 30.0 30.0 30.0 --------------------30.0 30.0 30.0 30.0 30.0 BF Cross Sectional Area (ft2)7.2 7.2 7.2 7.2 7.2 14.9 14.9 14.9 14.9 14.9 9.5 7.7 7.7 7.7 7.7 7.2 6.7 7.2 7.2 7.4 9.1 7.4 7.4 7.4 7.4 BF Mean Depth (ft)0.7 0.6 0.6 0.6 0.6 1.1 1.0 1.0 1.0 1.1 0.9 0.7 0.7 0.7 0.7 1.4 1.2 1.3 1.2 1.3 0.8 0.6 0.6 0.6 0.6 BF Max Depth (ft)1.0 0.9 0.9 0.9 1.0 2.8 2.0 2.2 2.3 2.4 1.4 1.0 1.1 1.2 1.3 1.6 1.7 1.8 1.7 1.8 1.3 1.0 1.1 1.1 1.1 Low Bank Height (ft)1.0 0.9 0.9 1.0 1.0 2.8 2.0 2.2 2.3 1.9 1.4 1.0 1.1 1.2 1.3 1.6 1.7 1.7 1.8 1.7 1.3 1.0 1.1 1.1 1.0 Width/Depth Ratio 15.3 18.1 18.4 17.7 19.9 --------------------12.7 16.3 16.3 16.3 17.1 --------------------12.8 18.8 19.8 17.6 18.5 Entrenchment Ratio 1.8 1.7 1.7 1.7 1.6 --------------------2.7 2.7 2.7 2.7 2.6 --------------------2.8 2.5 2.5 2.6 2.6 Bank Height Ratio 1.0 1.0 1.0 1.1 1.0 --------------------1.0 1.0 1.0 1.0 1.0 --------------------1.0 1.0 1.0 1.0 0.87 Wetted Perimeter (ft)10.9 11.7 11.8 11.6 12.2 15.3 15.8 15.5 15.7 15.3 11.6 11.5 11.5 11.6 11.9 7.5 7.6 7.5 7.8 7.5 11.2 12.1 12.4 11.7 12.2 Hydraulic Radius (ft)0.7 0.6 0.6 0.6 0.6 1.0 0.9 1.0 0.9 1.0 0.8 0.7 0.7 0.7 0.6 1.0 0.9 1.0 0.9 1.0 0.8 0.6 0.6 0.6 0.6 Substrate d50 (mm)7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ----7.8 7.3 8.2 6.7 ---- d84 (mm)36 33 34 24 ----36 33 34 24 ----36 33 34 24 ----36 33 34 24 ----36 33 34 24 ---- Parameter Min Max Med Min Max Med Min Max Med Min Max Med Min Max Med Min Max Med Pattern Channel Beltwidth (ft)16 52 28 Radius of Curvature (ft)16 103 28 Meander Wavelength (ft)49 124 79 Meander Width Ratio 2 5 3 Profile Riffle Length (ft)3 80 15 Riffle Slope (ft/ft)0.00%4.87%1.40% Pool Length (ft)8 32 16 Pool Spacing (ft)24 66 33 Additonal Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) BF Slope (ft/ft) Rosgen Classification Profile surveys during the stream monitoring period are not required, unless evidence of bed and/or bank instability is observed and the data is requested by the IRT. C/E 3/4 ------ 1.28 1.15 1,910 1,661 XS 35 Riffle (UT 2) Table 7F. Morphology and Hydraulic Monitoring Summary Motes Creek - UT 2 MY-00 (2018)MY-01 (2018)MY-02 (2019)MY-03 (2020)MY-05 (2022)MY-07 (2024) Table 7E continued. Morphology and Hydraulic Monitoring Summary Motes Creek - UT 2 XS 31 Riffle (UT 2)XS 32 Pool (UT 2)XS 33 Riffle (UT 2)XS 34 Pool (UT 2) Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)7.3 6.9 7.1 10.6 10.1 8.1 8.1 8.1 11.5 12.0 8.4 7.8 9.7 8.3 10.3 8.6 7.9 7.9 12.0 10.6 7.8 7.5 7.3 10.0 9.4 Floodprone Width (ft)50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 --------------------50.0 50.0 50.0 50.0 50.0 -------------------- BF Cross Sectional Area (ft2)4.1 2.9 3.4 4.1 4.1 5.0 4.9 5.0 5.0 5.0 4.0 4.0 4.0 4.0 4.0 3.1 3.1 3.1 3.1 3.1 4.9 4.9 4.9 4.9 4.9 BF Mean Depth (ft)0.6 0.4 0.5 0.4 0.4 0.6 0.6 0.6 0.4 0.4 0.5 0.5 0.4 0.5 0.4 0.4 0.4 0.4 0.3 0.3 0.6 0.7 0.7 0.5 0.5 BF Max Depth (ft)0.9 0.6 0.7 0.7 0.9 1.1 0.9 0.9 0.9 0.9 1.0 1.0 1.0 1.0 1.0 0.6 0.6 0.6 0.6 0.6 1.1 1.0 1.0 1.1 1.1 Low Bank Height (ft)0.9 0.6 0.7 0.7 0.8 1.1 0.9 0.8 0.9 0.8 1.0 1.0 1.0 1.0 0.9 0.6 0.6 0.7 0.6 0.7 1.1 1.0 1.0 1.1 1.1 Width/Depth Ratio 13.0 16.4 14.8 27.4 25.3 13.1 13.4 13.1 26.5 28.6 --------------------23.9 20.1 20.1 46.5 36.4 -------------------- Entrenchment Ratio 6.8 7.2 7.0 4.7 4.9 6.2 6.2 6.2 4.3 4.2 --------------------5.8 6.3 6.3 4.2 4.7 -------------------- Bank Height Ratio 1.0 1.0 1.0 1.0 0.92 1.0 1.0 0.9 1.0 0.93 --------------------1.0 1.0 1.2 1.0 1.15 -------------------- Wetted Perimeter (ft)7.6 7.1 7.3 10.8 10.4 8.6 8.4 8.4 11.7 12.2 8.8 8.2 10.0 8.7 10.7 8.8 8.2 8.1 12.1 10.7 8.2 7.9 7.7 10.4 10.1 Hydraulic Radius (ft)0.5 0.4 0.5 0.4 0.4 0.6 0.6 0.6 0.4 0.4 0.5 0.5 0.4 0.5 0.4 0.4 0.4 0.4 0.3 0.3 0.6 0.6 0.6 0.5 0.5 Substrate d50 (mm)6.3 9.6 10 6 ----6.3 9.6 10 6 ----6.3 9.6 10 6 ----6.3 9.6 10 6 ----6.3 9.6 10 6 ---- d84 (mm)32 40 43 34 ----32 40 43 34 ----32 40 43 34 ----32 40 43 34 ----32 40 43 34 ---- Parameter Dimension MY 0 MY1 MY2 MY3 MY5 MY7 BF Width (ft)9.6 8.7 5.6 10.2 11.0 Floodprone Width (ft)30.0 30.0 30.0 30.0 30.0 BF Cross Sectional Area (ft2)1.3 0.7 1.3 1.3 1.3 BF Mean Depth (ft)0.1 0.1 0.2 0.1 0.1 BF Max Depth (ft)0.3 0.2 0.4 0.3 0.2 Low Bank Height (ft)0.3 0.2 0.4 0.3 0.2 Width/Depth Ratio 70.9 108.1 24.1 80.0 93.7 Entrenchment Ratio 3.1 3.4 5.4 2.9 2.7 Bank Height Ratio 1.0 1.0 1.0 1.0 0.95 Wetted Perimeter (ft)9.7 8.7 5.7 10.3 11.0 Hydraulic Radius (ft)0.1 0.1 0.2 0.1 0.1 Substrate d50 (mm)6.3 9.6 10 6 ---- d84 (mm)32 40 43 34 ---- Parameter Min Max Med Min Max Med Min Max Med Min Max Med Min Max Med Min Max Med Pattern Channel Beltwidth (ft)16 41 25 Radius of Curvature (ft)16 82 25 Meander Wavelength (ft)49 98 70 Meander Width Ratio 2 5 3 Profile Riffle Length (ft)6 22 13 Riffle Slope (ft/ft)0.23%4.22%1.73% Pool Length (ft)7 18 11 Pool Spacing (ft)24 66 33 Additonal Reach Parameters Valley Length (ft) Channel Length (ft) Sinuosity Water Surface Slope (ft/ft) BF Slope (ft/ft) Rosgen Classification Profile surveys during the stream monitoring period are not required, unless evidence of bed and/or bank instability is observed and the data is requested by the IRT. C/E 3/4 ------ 0.0146 1.15 309 269 Table 7H. Morphology and Hydraulic Monitoring Summary Motes Creek - UT 3 MY-00 (2018)MY-01 (2018)MY-02 (2019)MY-03 (2020)MY-05 (2022)MY-07 (2024) XS 5 Pool (UT 3) XS 6 Riffle (UT 3) Table 7G. Morphology and Hydraulic Monitoring Summary Motes Creek - UT 3 XS 1 Riffle (UT 3)XS 2 Riffle (UT 3)XS 3 Pool (UT 3)XS 4 Riffle (UT 3) Station Elevation 0.0 93.25 93.2 3.2 93.21 15.4 4.8 92.77 16.4 6.1 92.26 94.8 7.0 92.05 50.0 7.9 91.88 1.6 8.6 91.85 1.6 10.0 91.61 0.9 11.0 91.66 17.4 12.2 91.71 3.1 13.2 91.61 1.0 14.0 91.78 14.3 92.03 C/E 15.2 92.21 16.3 92.51 17.5 92.82 18.5 93.07 20.2 93.38 21.9 93.11 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 1, Riffle Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 91 92 93 94 95 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS -1, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/13/22 Station Elevation 0.3 93.15 93.1 2.1 93.04 12.9 4.2 93.02 16.4 5.2 92.62 94.6 6.6 92.35 50.0 7.7 91.90 1.5 8.7 92.03 1.5 9.4 91.79 0.8 10.1 91.66 20.9 11.0 91.56 3.0 11.9 91.71 1.0 13.1 91.91 13.8 92.03 C/E 14.9 92.10 15.7 92.21 16.3 92.47 17.4 92.78 18.0 93.08 18.8 93.12 21.7 93.16 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 2, Riffle 91 92 93 94 95 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS -2, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/13/22 Station Elevation 0.3 93.10 93.2 1.9 93.16 12.9 3.9 93.02 18.1 4.9 92.71 94.5 6.7 92.35 50.0 7.8 92.20 1.3 8.5 92.08 1.2 9.5 92.02 0.7 10.9 92.01 25.4 12.4 91.94 2.8 13.8 91.91 1.0 14.7 92.02 15.6 92.34 C/E 16.5 92.59 17.0 92.84 17.9 93.13 19.2 93.26 21.4 93.21 23.2 93.18 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 3, Riffle Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 91 92 93 94 95 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS -3, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/13/22 Station Elevation 0.3 93.39 93.3 3.2 93.33 7.1 4.6 93.22 11.7 5.6 92.95 94.3 6.5 92.69 50.0 6.5 92.69 1.0 7.2 92.54 1.0 7.9 92.51 0.6 8.9 92.36 19.3 9.7 92.34 4.3 10.7 92.31 1.0 11.8 92.48 13.0 92.57 C/E 13.8 92.92 14.7 93.16 15.7 93.46 16.5 93.68 18.8 93.65 20.7 93.51 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 4, Riffle Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 92 93 94 95 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS -4, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/13/22 Station Elevation 0.3 94.0 93.9 3.0 94.0 16.0 5.1 93.7 14.1 6.7 93.4 NA 8.1 93.1 NA 9.4 92.4 2.2 10.3 91.8 2.3 12.9 91.7 1.1 14.4 91.9 NA 15.0 92.2 NA 15.7 93.0 1.1 16.5 93.3 17.2 93.6 C/E 18.5 94.0 19.6 94.1 21.4 94.1 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 5, Pool Feature Pool Date:1/13/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 91 92 93 94 95 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 5, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/13/22 Station Elevation 0.2 93.86 94.2 2.9 94.02 10.5 5.4 93.94 16.6 7.2 93.67 95.4 8.1 93.57 50.0 8.9 93.66 1.2 9.4 93.53 1.2 9.5 93.53 0.6 10.1 93.43 26.3 10.9 93.27 3.0 12.2 93.05 1.0 13.5 92.95 14.4 93.01 C/E 15.0 93.03 15.7 93.06 16.6 93.40 17.5 93.53 18.4 93.90 19.7 94.17 22.5 94.28 25.0 94.32 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 6, Riffle Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: 92 93 94 95 96 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS -6 Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/13/22 Station Elevation 0.0 96.90 95.9 3.3 96.40 11.9 5.6 95.77 16.5 7.1 95.14 97.3 8.2 94.89 50.0 9.2 94.68 1.4 9.8 94.53 1.3 10.9 94.46 0.7 11.8 94.48 22.9 13.2 94.63 3.0 14.3 94.65 0.94 14.9 95.07 15.6 95.20 C/E 16.6 95.57 18.1 95.65 20.0 95.69 21.8 95.71 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 7, Riffle 94 95 96 97 98 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS -7 Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/13/22 Station Elevation 0.4 96.2 95.7 4.0 96.0 13.0 5.4 95.7 11.7 6.8 95.5 NA 7.6 95.0 NA 8.7 94.3 1.9 9.6 94.0 1.9 10.6 93.8 1.1 12.0 93.8 NA 12.8 94.0 NA 14.0 94.1 1.0 15.5 94.8 16.1 95.5 C/E 17.0 95.6 18.2 95.8 19.8 96.1 21.7 96.2 Stream Type Mean Depth at Bankfull: 1/13/2022 Adams, Perkinson, Smith Bankfull Width: Flood Prone Area Elevation: Flood Prone Width: Max Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Bankfull Elevation: SUMMARY DATA Low Bank Height: Feature Bankfull Cross-Sectional Area: Date: Field Crew: Pool Motes Creek Cape Fear, 0303002 Motes, XS - 8, Pool Site Watershed: XS ID 93 94 95 96 97 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 8, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/13/22 Station Elevation 0.0 96.28 96.3 2.9 96.42 9.5 5.2 96.06 13.2 6.1 95.97 97.4 7.2 95.55 50.0 8.0 95.26 1.2 9.1 95.06 1.2 10.3 95.22 0.7 11.5 95.21 18.5 12.8 95.21 3.8 14.2 95.30 1.0 15.2 95.61 15.9 95.84 C/E 16.3 96.03 17.3 96.28 18.2 96.32 19.9 96.32 21.7 96.41 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 9, Riffle 94 95 96 97 98 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS -9 Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/13/22 Station Elevation 0.0 96.94 96.5 3.1 96.92 9.3 4.2 96.78 13.8 5.1 96.53 97.8 6.0 96.10 50.0 7.0 95.86 1.2 7.7 95.81 1.2 8.9 95.70 0.7 9.3 95.47 20.4 9.8 95.35 3.6 10.5 95.39 1.0 10.9 95.30 11.8 95.33 C/E 12.6 95.41 13.1 95.59 13.7 95.63 14.1 95.71 15.0 95.98 15.8 96.28 18.1 96.48 20.6 96.71 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 10, Riffle Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 95 96 97 98 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 10, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/13/22 Station Elevation 0.0 98.07 97.8 2.9 97.83 9.0 4.8 97.70 14.2 6.1 97.40 98.8 6.9 97.02 50.0 9.3 96.81 1.0 10.8 96.76 0.9 10.9 96.76 0.6 12.4 96.97 22.3 13.6 97.10 3.5 14.7 96.96 0.93 15.8 97.11 16.8 97.40 C/E 18.0 97.80 21.2 97.83 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 11, Riffle 96 97 98 99 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS -11, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/13/22 Station Elevation 0.3 98.32 98.1 3.3 98.28 6.5 5.5 98.11 13.5 6.6 97.73 99.4 8.1 97.71 50.0 9.5 97.60 1.3 10.2 97.53 1.3 10.8 97.43 0.5 11.9 97.15 28.0 12.7 96.97 3.7 13.5 96.75 1.0 14.1 96.79 14.4 96.87 C/E 14.8 97.64 15.7 97.82 17.3 98.04 19.5 98.06 20.9 98.13 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 12, Riffle 96 97 98 99 100 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 12, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/13/22 Station Elevation 0.2 98.9 97.8 3.3 98.8 13.0 6.3 98.5 9.5 8.1 98.1 NA 9.4 96.2 NA 10.7 95.9 2.0 11.4 95.9 2.2 14.0 96.0 1.4 14.7 96.3 NA 16.2 97.1 NA 17.3 97.7 1.1 18.5 98.1 20.5 98.4 C/E 22.5 98.5 26.1 98.7 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Pool Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 13, Pool 95 96 97 98 99 100 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 13, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/13/22 Station Elevation 0.2 99.20 99.2 2.8 99.10 8.1 5.0 98.84 15.7 5.8 98.65 100.2 6.7 98.39 50.0 7.6 98.28 1.0 8.4 98.19 0.9 9.3 98.47 0.5 10.0 98.38 30.4 10.6 98.34 3.2 11.5 98.29 0.93 12.3 98.52 13.8 98.53 C/E 14.8 98.66 16.1 99.00 16.8 99.22 18.9 99.20 21.3 99.27 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 14, Riffle 98 99 100 101 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 14, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/13/22 Station Elevation -0.1 100.16 99.5 1.9 99.74 6.1 3.4 99.59 11.2 4.6 99.34 100.3 5.6 99.00 50.0 6.8 99.08 0.8 9.1 98.65 0.9 10.2 98.75 0.5 11.4 98.72 20.8 12.7 98.70 4.5 13.5 98.94 1.0 14.2 99.10 15.1 99.52 C/E 16.2 99.64 18.1 99.48 18.3 99.46 20.5 99.57 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 15, Riffle 98 99 100 101 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 15, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation -0.1 100.43 100.2 2.4 100.52 7.7 4.9 100.25 11.9 6.2 99.94 101.7 7.5 99.65 50.0 8.9 99.97 1.5 9.6 99.62 1.5 10.5 99.55 0.6 11.3 99.31 18.4 12.0 99.07 4.2 12.8 98.85 1.0 13.5 98.85 14.3 98.71 C/E 15.1 99.72 15.9 99.97 16.8 100.19 18.8 100.34 20.8 100.52 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 16, Riffle 98 99 100 101 102 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 16, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation -0.2 100.8 100.2 2.5 100.7 6.7 3.9 100.5 7.9 5.0 100.2 NA 7.3 100.2 NA 8.2 98.9 1.6 9.0 98.9 1.5 9.9 98.7 0.9 11.0 98.7 NA 12.0 98.8 NA 12.9 100.3 1.0 14.1 100.6 15.9 100.9 C/E 17.2 100.9 18.5 101.1 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Pool Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 17, Pool 98 99 100 101 102 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 17, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.0 100.68 100.7 2.4 100.75 6.1 4.2 100.55 10.5 4.9 100.40 101.7 5.5 100.15 50.0 6.3 99.68 1.0 7.2 99.63 1.1 8.3 99.76 0.6 9.7 99.79 18.1 10.5 99.83 4.8 11.0 100.16 1.06 11.6 100.20 12.6 100.29 C/E 14.0 100.71 15.9 100.87 18.0 101.13 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 18, Riffle 99 100 101 102 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 18, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.0 101.41 101.4 3.0 101.23 12.6 5.1 101.03 20.4 5.8 100.90 102.5 6.6 100.61 50.0 7.8 100.32 1.1 8.8 100.29 1.0 10.6 100.36 0.6 11.7 100.34 33.1 13.3 100.27 2.4 14.6 100.35 0.94 15.1 100.56 16.0 100.64 C/E 16.8 100.79 18.4 101.03 21.1 101.30 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 19, Riffle Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 99 100 101 102 103 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 19, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.0 101.6 101.9 2.0 101.6 13.3 3.8 101.5 18.5 4.7 101.3 NA 5.2 101.1 NA 6.2 100.8 1.3 7.3 100.8 1.0 8.3 100.7 0.7 9.6 100.7 NA 11.0 100.6 NA 12.6 100.8 0.72 13.9 101.2 14.8 101.2 C/E 15.9 101.6 18.5 101.7 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Pool Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 20, Pool 99 100 101 102 103 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 20, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.2 102.2 102.3 2.2 102.1 11.2 3.4 102.0 15.4 4.3 101.9 NA 5.4 101.7 NA 6.2 100.8 1.6 6.9 100.7 1.0 7.8 100.7 0.7 8.5 100.9 NA 9.3 100.8 NA 10.2 100.9 0.65 10.8 101.1 11.8 101.2 C/E 12.6 101.7 13.3 101.9 14.8 102.1 16.6 102.4 18.5 102.7 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Pool Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 21, Pool 100 101 102 103 104 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 21, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation -0.2 102.78 102.7 2.3 102.82 6.6 5.0 102.50 11.2 6.6 102.17 103.9 7.9 102.15 50.0 8.5 101.92 1.1 9.4 101.73 1.2 10.1 101.69 0.6 10.9 101.68 19.2 11.7 101.59 4.4 12.5 101.84 1.08 12.8 102.16 13.3 102.40 C/E 14.7 102.84 16.5 102.92 19.6 103.05 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 22, Riffle Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 101 102 103 104 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 22, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation -0.2 103.53 103.4 2.5 103.35 12.6 3.9 103.17 14.8 4.8 102.91 105.2 5.3 102.57 50.0 6.0 102.06 1.8 7.0 101.85 1.8 7.9 101.78 0.9 8.0 101.76 17.5 8.8 101.55 3.4 9.3 101.74 1.0 9.8 101.86 10.3 101.97 C/E 10.8 102.00 11.7 102.10 12.4 102.48 13.1 102.76 14.6 102.97 16.4 103.26 18.6 103.62 20.4 103.75 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 23, Riffle 101 102 103 104 105 106 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS -23 Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.0 104.1 103.9 1.8 104.2 7.1 3.8 103.9 10.3 5.1 103.7 NA 6.2 103.5 NA 7.3 103.2 1.1 8.2 102.9 1.4 8.8 102.8 0.7 9.9 102.8 NA 11.1 102.8 NA 12.3 102.9 1.2 12.7 103.0 13.0 103.4 C/E 13.5 103.8 14.5 104.1 16.0 104.2 18.4 104.5 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Pool Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 24, Pool 102 103 104 105 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 24, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.0 104.83 104.3 2.1 104.94 8.2 4.3 104.83 7.2 5.3 104.68 105.8 6.2 103.40 50.0 6.7 103.06 1.6 8.0 103.03 1.6 8.8 102.83 1.1 9.6 102.74 6.4 10.5 102.90 6.9 11.1 103.10 1.0 11.5 103.39 12.3 103.70 C/E 12.7 104.34 14.6 104.41 17.1 104.75 19.7 105.06 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 25, Riffle 102 103 104 105 106 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 25, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/21 Station Elevation 0.0 105.50 105.0 3.2 105.21 7.2 7.0 104.51 10.2 9.5 104.30 106.5 10.7 103.79 50.0 11.2 103.65 1.5 11.8 103.52 1.7 12.6 103.71 0.7 13.2 104.12 14.5 13.7 104.56 4.9 14.8 105.28 1.12 16.6 105.60 20.1 105.93 C/E Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 26, Riffle Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 103 104 105 106 107 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 26, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/21 Station Elevation 0.2 106.43 106.2 3.0 106.46 9.8 5.0 105.96 10.4 5.6 105.12 107.9 5.9 104.79 50.0 6.5 104.49 1.7 6.6 104.49 1.9 7.1 104.51 0.9 8.0 104.71 11.0 9.1 104.80 4.8 10.0 105.03 1.07 10.9 105.22 14.8 106.34 C/E 19.3 106.52 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 27, Riffle 104 105 106 107 108 109 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 27, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/21 Station Elevation 0.0 107.99 107.5 3.0 107.64 13.4 4.8 107.21 14.7 5.2 107.02 109.3 5.6 106.45 50.0 5.8 106.05 1.8 6.5 105.79 1.9 7.5 105.68 0.9 8.2 105.89 16.2 9.6 105.94 3.4 10.6 106.05 1.0 11.4 106.34 13.0 106.71 C/E 18.7 107.56 21.6 107.93 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 28, Riffle 105 106 107 108 109 110 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 28, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/21 Station Elevation 0.2 108.0 107.2 3.4 107.7 11.7 5.0 107.4 11.1 5.8 106.3 NA 6.3 105.9 NA 6.8 105.5 2.0 7.2 105.2 2.0 8.3 105.4 1.1 9.7 105.7 NA 11.6 105.8 NA 12.0 105.9 1.0 12.6 106.5 13.2 106.9 C/E 15.1 107.2 18.2 107.4 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Pool Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 29, Pool 105 106 107 108 109 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 29, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/21 Station Elevation -0.5 108.6 108.4 3.0 108.3 15.2 5.7 107.7 16.5 6.3 107.3 NA 6.5 107.1 NA 7.1 106.8 1.9 8.6 106.8 1.7 9.5 106.9 0.9 10.5 106.9 NA 11.5 106.6 NA 12.7 106.5 0.9 13.3 106.6 13.6 107.5 C/E 14.9 108.2 17.9 108.3 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Pool Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 30, Pool 106 107 108 109 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 30, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/21 Station Elevation -0.2 109.31 108.8 2.8 109.09 11.1 5.2 108.45 11.7 6.9 107.98 110.4 7.5 107.76 50.0 7.8 107.61 1.6 7.9 107.53 1.6 8.8 107.53 0.9 9.3 107.33 12.4 10.2 107.20 4.3 11.2 107.33 1.0 12.5 107.43 13.0 107.56 C/E 13.4 107.91 13.9 107.93 15.5 108.79 20.0 109.20 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 31, Riffle 107 108 109 110 111 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 31, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/21 Station Elevation 0.2 109.33 109.0 3.2 109.12 9.4 4.9 108.89 12.5 5.8 108.44 110.3 6.4 108.21 50.0 6.9 107.82 1.3 7.3 107.68 1.2 9.2 107.77 0.7 10.3 107.79 16.8 11.4 107.95 4.0 12.4 108.14 0.92 13.7 108.42 15.8 108.85 C/E 20.1 109.52 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID Motes, XS - 32, Riffle 107 108 109 110 111 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, Motes, XS - 32, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/21 Station Elevation -0.7 100.69 100.5 1.9 100.67 4.0 4.1 100.47 9.3 5.6 100.12 101.2 5.9 99.97 50.0 7.1 99.96 0.7 7.6 99.96 0.8 8.5 99.74 0.4 9.5 99.72 21.5 10.1 99.81 5.4 10.8 99.89 1.07 11.6 99.82 11.8 100.12 C/E 12.2 100.25 13.5 100.50 15.0 100.44 16.3 100.52 17.5 100.51 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 1, Riffle Flood Prone Area Elevation: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 99 100 101 102 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS -1, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.0 100.98 101.0 3.1 100.94 3.8 4.2 100.93 13.5 5.0 100.92 101.6 5.4 100.56 50.0 6.0 100.55 0.6 7.2 100.51 0.5 8.3 100.45 0.3 9.4 100.46 47.8 9.9 100.45 3.7 10.8 100.52 0.85 12.5 100.83 14.4 101.17 C/E 16.5 101.13 Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 2, Riffle 100 101 102 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS -2, Riffle Bankfull Flood Prone Area MY-00, 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.5 102.3 102.2 3.1 102.2 8.0 4.1 102.0 9.1 4.6 101.8 NA 5.0 101.5 NA 5.5 100.8 1.6 6.2 100.6 1.6 7.7 100.8 0.9 8.5 100.8 NA 9.0 100.9 NA 9.8 101.2 1.0 10.4 101.5 11.0 101.8 C/E 11.6 102.2 13.3 102.4 16.0 102.3 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 3, Pool Flood Prone Area Elevation: Feature Pool Date:1/13/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 100 101 102 103 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS - 3, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.0 105.3 105.1 2.0 105.3 9.2 4.0 104.8 10.0 4.8 104.6 NA 5.1 104.4 NA 5.7 104.1 1.7 6.3 103.8 1.9 7.2 103.5 0.9 7.7 103.5 NA 8.7 103.4 NA 9.6 103.5 1.1 10.2 103.8 10.6 104.1 C/E 11.1 104.5 11.9 104.9 14.1 105.3 16.8 105.1 Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Pool Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 4, Pool 103 104 105 106 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS - 4, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.1 105.32 105.1 3.1 105.11 6.9 4.7 104.82 15.6 5.1 104.68 105.8 5.4 104.51 50.0 6.0 104.40 0.7 6.5 104.38 0.7 7.7 104.43 0.4 9.0 104.49 35.2 9.5 104.41 3.2 10.2 104.40 1.0 11.3 104.54 12.0 104.65 C/E 12.7 104.62 14.0 104.68 18.7 105.07 Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 5, Riffle 104 105 106 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS -5, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation -0.1 106.34 106.0 3.6 106.16 5.9 4.7 105.71 9.8 5.6 105.47 107.0 6.1 105.35 50.0 6.5 105.16 1.0 7.0 105.03 1.0 7.5 105.16 0.6 8.4 105.13 16.2 9.2 105.05 5.1 10.0 105.15 1.0 10.8 105.45 11.5 105.58 C/E 13.9 106.08 16.7 106.06 Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 6, Riffle 104 105 106 107 108 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS -6, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.0 105.96 106.2 3.4 106.00 3.4 4.8 106.06 11.4 6.1 105.92 106.8 6.4 105.79 50.0 6.8 105.73 0.6 7.0 105.64 0.5 7.9 105.60 0.3 8.7 105.57 37.8 9.4 105.62 4.4 9.8 105.69 0.81 10.3 105.86 11.1 106.17 C/E 12.3 106.21 14.1 106.37 Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 7, Riffle 105 106 107 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS -7, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.1 108.25 107.9 4.1 107.87 4.2 6.6 107.51 10.3 7.6 107.31 108.6 8.1 107.25 50.0 9.1 107.26 0.7 10.8 107.26 0.7 11.2 107.43 0.4 12.1 107.52 25.7 12.6 107.64 4.8 13.8 107.91 1.0 16.1 108.09 17.5 108.09 C/E Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 8, Riffle 107 108 109 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS -8, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation -0.1 108.4 108.1 3.1 108.3 8.7 4.4 108.1 10.5 5.1 107.5 NA 6.1 107.6 NA 6.4 107.4 1.4 7.1 107.3 1.6 7.4 107.2 0.8 8.0 107.0 NA 8.6 106.8 NA 9.9 106.7 1.1 10.9 106.7 11.7 106.8 C/E 12.6 107.6 13.1 107.9 16.1 108.3 18.8 108.2 Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Pool Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 9, Pool 106 107 108 109 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS - 9, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.0 108.30 108.2 3.6 108.13 3.7 5.0 108.04 12.4 5.8 107.85 108.8 6.3 107.77 50.0 7.5 107.66 0.6 8.3 107.68 0.6 9.0 107.68 0.3 9.8 107.87 41.1 10.6 107.71 4.0 11.8 107.88 1.0 14.2 108.25 17.0 108.32 C/E Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 10, Riffle 107 108 109 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS - 10, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.0 108.8 108.5 2.3 108.9 5.2 4.3 108.9 5.9 5.6 108.9 NA 6.1 108.4 NA 6.3 107.8 1.2 7.2 107.4 1.4 7.8 107.4 0.9 8.4 107.3 NA 9.4 107.5 NA 10.2 107.5 1.2 10.8 107.8 11.7 108.5 C/E 13.0 108.7 15.2 108.7 17.5 108.7 Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Pool Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 11, Pool 107 108 109 110 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS -11, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.5 108.97 108.9 3.1 109.01 4.5 5.2 108.56 12.7 6.3 108.44 109.6 7.7 108.32 50.0 8.9 108.29 0.8 9.5 108.18 0.7 10.1 108.06 0.4 10.9 108.12 36.0 11.4 108.30 3.9 12.3 108.52 0.91 13.4 108.78 14.1 108.78 C/E 16.6 108.76 Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 12, Riffle 107 108 109 110 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS - 12, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.0 109.76 109.9 3.5 109.87 5.4 4.7 109.72 12.8 5.4 109.53 110.8 5.8 109.32 50.0 6.2 109.18 0.8 7.0 109.18 0.8 7.7 109.08 0.4 8.4 109.19 30.1 9.0 109.19 3.9 9.9 109.28 0.94 11.6 109.34 13.7 109.82 C/E 16.7 109.94 Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 13, Riffle 108 109 110 111 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS - 13, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation -0.3 110.8 110.4 2.9 110.6 7.9 4.2 110.3 9.1 4.7 110.3 NA 5.2 109.6 NA 5.9 109.0 1.5 6.6 108.9 1.4 7.6 108.9 0.9 8.3 109.0 NA 9.4 109.1 NA 10.5 109.4 0.9 10.5 109.6 10.9 109.9 C/E 11.7 110.2 14.6 110.6 17.3 110.7 Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Pool Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 14, Pool 108 109 110 111 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS - 14, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.0 110.49 110.6 4.5 110.22 4.9 6.9 110.30 12.6 7.6 110.09 111.4 8.3 109.98 50.0 8.7 109.98 0.7 9.5 109.92 0.7 10.2 109.94 0.4 10.7 110.18 32.6 11.5 110.49 4.0 12.7 110.65 1.0 14.7 110.68 C/E Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 15, Riffle 109 110 111 112 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS - 15, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.1 111.17 111.2 3.0 111.36 4.8 4.1 111.05 11.0 4.7 110.71 112.1 5.3 110.56 50.0 6.0 110.49 1.0 6.4 110.19 1.0 7.1 110.28 0.4 8.0 110.40 25.0 8.4 110.21 4.6 8.9 110.44 1.0 9.4 110.62 10.6 110.85 C/E 14.8 111.15 Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 16, Riffle 109 110 111 112 113 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS - 16, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.1 111.79 111.4 3.0 111.30 3.2 3.5 111.03 9.8 4.0 110.85 112.1 4.3 110.67 50.0 5.5 110.59 0.8 6.4 110.68 0.7 7.8 110.85 0.3 8.4 111.08 29.5 8.9 111.31 5.1 12.0 111.32 1.0 16.7 111.66 C/E Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 17, Riffle 110 111 112 113 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS - 17, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.0 112.4 112.4 2.7 112.5 6.5 3.5 112.3 12.1 4.4 112.1 NA 4.9 111.7 NA 5.6 111.7 1.1 6.1 111.6 1.0 7.4 111.6 0.5 8.6 111.3 NA 9.6 111.2 NA 10.4 111.4 0.9 11.0 111.7 11.4 112.1 C/E 13.7 112.3 15.5 112.5 Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Pool Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 18, Pool 111 112 113 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS - 18, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.0 101.71 101.6 4.6 101.33 5.0 6.2 101.29 13.4 6.9 100.90 102.4 7.5 100.83 50.0 8.8 100.82 0.8 10.0 100.83 0.8 11.1 100.77 0.4 11.3 101.31 35.8 12.1 101.30 3.7 14.4 101.55 1.0 17.0 101.70 C/E Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 19, Riffle 100 101 102 103 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS - 19, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.3 113.96 113.9 4.0 113.95 5.2 5.5 113.45 11.6 5.8 112.88 115.0 6.8 112.90 50.0 8.2 113.13 1.0 9.2 113.38 1.1 10.5 113.54 0.4 14.6 113.82 25.9 17.7 114.12 4.3 1.0 C/E Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 20, Riffle 112 113 114 115 116 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS - 20, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.0 114.63 114.3 4.0 114.55 3.0 5.1 114.27 8.2 6.4 114.06 115.1 6.8 113.94 50.0 7.3 113.79 0.7 8.2 113.61 0.7 8.8 113.61 0.4 9.8 113.80 22.3 10.5 113.85 6.1 11.3 114.12 1.0 13.2 114.35 16.5 114.39 C/E Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 21, Riffle 113 114 115 116 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS - 21, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.3 115.0 114.8 0.4 115.2 8.1 4.6 115.1 6.5 5.8 115.0 NA 6.2 114.6 NA 6.6 114.0 1.8 7.2 113.8 1.9 8.0 113.6 1.2 8.9 113.3 NA 9.7 113.0 NA 11.0 113.0 1.1 11.8 113.3 12.1 114.6 C/E 12.7 114.9 14.7 115.1 16.6 115.1 Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Pool Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 22, Pool 112 113 114 115 116 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS - 22, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation -1.0 117.48 117.6 2.8 117.58 7.7 5.3 117.24 15.5 7.1 116.84 118.7 8.0 116.59 50.0 9.1 116.57 1.1 10.0 116.49 1.1 11.0 116.49 0.5 11.9 116.63 31.4 12.3 116.99 3.2 12.9 117.39 1.0 14.3 117.50 18.3 117.58 C/E Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Riffle Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 23, Riffle 116 117 118 119 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS - 23, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation 0.0 118.1 117.9 4.7 117.3 16.4 6.4 117.0 18.4 7.0 116.8 NA 7.7 116.3 NA 8.7 116.1 2.1 9.6 116.0 1.8 10.9 115.9 0.9 11.6 116.0 NA 12.9 115.9 NA 13.2 117.0 0.9 13.8 117.2 14.6 117.6 C/E 16.3 117.7 19.2 117.9 Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Feature Pool Date:1/13/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 1, XS - 24, Pool 115 116 117 118 119 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 1, XS - 24, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/12/20 MY-05 1/13/22 Station Elevation -0.2 92.68 92.6 2.3 92.90 9.3 3.8 92.40 10.7 4.9 92.12 94.2 5.8 91.85 50.0 6.5 91.72 1.6 6.9 91.48 1.5 7.3 91.47 0.9 8.4 91.22 12.3 9.2 91.21 4.7 10.1 91.03 1.0 10.6 91.10 11.0 91.42 C/E 11.7 91.74 12.5 92.10 13.6 92.54 14.6 92.86 17.4 93.04 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 1, Riffle 90 91 92 93 94 95 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS -1, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.0 93.35 93.2 1.5 93.12 10.9 3.1 93.11 14.9 4.2 92.86 94.5 5.3 92.48 50.0 5.6 92.18 1.4 6.0 91.88 1.3 6.5 91.87 0.7 7.4 91.87 20.2 9.1 91.80 3.4 10.1 91.83 1.0 10.5 91.96 11.1 92.02 C/E 11.9 92.09 13.6 92.75 17.8 93.48 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 2, Riffle Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 91 92 93 94 95 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS -2, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.1 93.5 93.3 2.5 93.3 7.2 3.7 93.2 10.2 4.8 93.0 NA 6.0 92.7 NA 6.4 92.4 1.6 6.9 92.0 1.5 7.7 91.8 0.7 8.4 91.8 NA 9.1 91.8 NA 9.6 92.0 0.9 10.3 92.5 11.4 93.0 C/E 13.1 93.4 16.3 93.6 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Pool Date:1/18/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 3, Pool 91 92 93 94 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 3, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.0 94.04 93.9 2.9 93.95 6.6 4.2 93.79 12.0 5.6 93.39 95.0 6.6 93.10 50.0 7.4 92.91 1.1 8.1 92.92 1.0 8.8 92.87 0.6 8.9 92.87 21.7 9.5 92.81 4.2 10.3 92.89 1.0 11.1 92.89 11.8 93.53 C/E 13.1 93.73 14.8 93.86 17.2 94.04 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 4, Riffle Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 92 93 94 95 96 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS -4, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.4 94.9 94.9 2.7 95.0 8.4 4.3 94.7 9.3 4.9 94.4 NA 6.0 93.9 NA 6.3 93.5 1.6 6.8 93.5 1.4 7.4 93.4 0.9 8.4 93.3 NA 8.9 93.3 NA 9.7 93.4 0.9 10.3 93.6 10.9 94.5 C/E 13.2 95.1 16.1 95.3 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 5, Pool Feature Pool Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 93 94 95 96 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 5, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.0 95.31 95.2 2.9 95.24 7.8 4.0 94.99 11.7 4.7 94.70 96.4 5.1 94.50 50.0 6.4 94.43 1.2 7.6 94.44 1.2 8.3 94.23 0.7 9.5 94.01 17.5 12.2 94.40 4.3 13.0 94.56 1.0 13.5 95.05 14.9 95.20 C/E 17.6 95.43 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 6, Riffle Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 93 94 95 96 97 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS -6, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation -0.2 95.69 95.4 2.6 95.53 5.9 4.8 95.11 11.6 5.9 94.81 96.4 6.2 94.62 50.0 6.6 94.63 1.0 7.4 94.44 0.8 8.2 94.30 0.5 9.2 94.59 23.0 9.8 94.78 4.3 11.0 94.65 0.81 12.5 94.70 13.5 95.12 C/E 17.1 95.51 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 7, Riffle Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 94 95 96 97 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS -7, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation -0.2 95.55 95.5 2.7 95.58 5.7 4.3 95.40 10.4 5.1 95.17 96.4 5.7 95.08 50.0 6.4 94.67 0.9 7.0 94.63 0.9 7.7 94.64 0.5 8.5 94.73 18.8 9.1 94.73 4.8 9.8 94.82 1.0 11.1 94.80 11.7 94.94 C/E 12.4 95.23 14.0 95.74 18.1 95.88 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 8, Riffle Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 94 95 96 97 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS -8, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.8 96.3 96.2 3.1 96.3 8.3 4.5 95.9 9.0 5.2 96.0 NA 5.9 95.4 NA 6.1 95.1 2.1 6.7 94.6 1.9 7.4 94.4 0.9 8.0 94.1 NA 8.3 94.6 NA 9.1 95.1 0.9 9.5 95.0 10.6 95.1 C/E 11.2 95.5 11.8 96.0 13.0 96.5 16.7 96.5 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 9, Pool Feature Pool Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 93 94 95 96 97 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 9, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.1 98.71 98.7 3.1 98.73 6.6 4.6 98.22 10.9 5.5 98.06 99.8 6.0 97.62 50.0 6.9 97.62 1.1 7.7 97.63 1.1 8.4 97.60 0.6 9.4 97.62 18.1 9.8 97.75 4.6 10.4 98.10 1.0 10.9 98.20 13.2 98.98 C/E 15.7 99.27 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 10, Riffle Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 97 98 99 100 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 10, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.0 99.44 99.2 0.3 99.34 8.7 3.5 99.36 11.0 5.0 98.55 100.3 6.4 98.29 50.0 7.0 98.23 1.1 8.3 98.14 1.2 9.1 98.14 0.8 10.6 98.11 13.9 11.4 98.17 4.5 12.1 98.27 1.12 12.5 98.43 13.3 98.71 C/E 13.9 99.03 14.9 99.26 17.2 99.66 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 11, Riffle Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 97 98 99 100 101 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS -11, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation -0.2 100.38 100.2 3.4 100.08 4.9 5.8 99.82 11.3 6.8 99.62 100.9 7.2 99.52 50.0 8.0 99.35 0.8 9.0 99.48 0.8 9.6 99.40 0.4 10.5 99.41 26.1 11.2 99.50 4.4 12.0 99.68 1.0 12.6 99.88 13.6 100.14 C/E 15.7 100.24 17.6 100.26 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 12, Riffle Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 99 100 101 102 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 12, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation -0.3 100.7 100.6 1.8 100.7 7.9 3.9 100.3 12.0 5.2 100.2 NA 5.9 100.0 NA 6.3 99.8 1.4 6.8 99.6 1.2 7.1 99.4 0.7 7.3 99.4 NA 7.8 99.3 NA 8.5 99.2 0.8 9.1 99.2 10.0 99.3 C/E 10.5 99.5 11.2 99.9 11.8 100.1 13.5 100.5 16.3 100.8 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 13, Pool Feature Pool Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 99 100 101 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 13, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation -0.3 100.71 100.6 2.0 100.73 4.5 4.6 100.51 10.1 5.2 100.11 101.2 8.5 99.99 50.0 9.6 99.98 0.6 10.4 99.98 0.7 11.6 100.03 0.4 12.5 100.04 22.6 12.7 100.23 4.9 14.2 100.66 1.14 17.3 101.11 C/E Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 14, Riffle Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 99 100 101 102 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 14, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation -0.1 101.93 101.6 3.2 101.67 3.4 5.1 101.19 8.7 6.4 101.25 102.4 7.0 101.26 50.0 7.6 101.01 0.8 8.1 100.78 0.9 8.6 100.99 0.4 10.6 101.13 22.2 11.4 101.21 5.7 11.7 101.37 1.12 12.8 101.76 C/E Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 15, Riffle Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 100 101 102 103 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 15, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.0 102.0 101.8 2.5 102.0 7.3 3.7 101.7 8.5 4.8 101.5 NA 5.1 101.3 NA 5.7 101.1 1.5 6.2 100.9 1.4 7.0 100.6 0.9 7.7 100.5 NA 8.1 100.4 NA 8.6 100.3 0.9 9.4 100.4 10.4 100.6 C/E 11.1 101.1 11.7 101.8 13.6 101.9 16.5 102.0 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 16, Pool Feature Pool Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 100 101 102 103 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 16, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation -0.3 101.94 102.0 3.4 102.03 4.5 4.2 101.76 12.8 4.8 101.60 102.7 5.5 101.51 50.0 6.8 101.32 0.7 7.1 101.27 0.8 7.7 101.34 0.4 8.2 101.25 36.0 8.6 101.28 3.9 9.1 101.33 1.09 9.6 101.42 10.2 101.51 C/E 10.5 101.71 11.1 101.69 12.6 101.75 16.3 101.94 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 17, Riffle Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 101 102 103 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 17, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.0 104.60 104.3 2.9 104.52 6.1 4.2 104.24 10.1 5.2 104.05 105.8 6.2 103.75 50.0 6.7 103.71 1.5 6.9 103.63 1.3 7.3 103.14 0.6 7.6 103.09 17.0 8.4 103.06 4.9 8.9 102.89 0.89 9.4 103.32 9.9 103.60 C/E 10.5 103.79 11.8 103.85 12.6 104.18 15.2 104.51 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 18, Riffle Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 102 103 104 105 106 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 18, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.0 105.0 104.8 2.0 104.9 9.7 3.9 104.4 10.7 5.2 104.2 NA 5.5 104.0 NA 5.8 103.7 1.7 6.5 103.5 1.8 7.0 103.4 0.9 7.9 103.2 NA 8.2 103.1 NA 9.0 103.1 1.0 9.5 103.1 9.9 103.3 C/E 10.4 103.8 11.2 104.1 12.1 104.5 13.7 105.1 15.4 105.5 17.6 105.5 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 19, Pool Feature Pool Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 102 103 104 105 106 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 19, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation -0.2 105.12 105.0 3.2 104.99 4.9 5.2 104.56 9.1 5.5 104.23 105.8 6.5 104.21 50.0 7.6 104.17 0.8 8.2 104.16 0.8 8.6 104.21 0.5 9.2 104.24 17.0 9.8 104.37 5.5 10.6 104.40 1.0 11.5 104.71 13.2 105.25 C/E 16.0 105.61 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 20, Riffle 103 104 105 106 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 20, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.1 105.6 105.6 2.2 105.6 9.3 4.0 105.3 10.3 5.3 104.9 NA 5.6 104.7 NA 6.0 104.4 1.9 6.5 104.2 1.9 7.4 104.0 0.9 7.9 103.9 NA 8.7 103.8 NA 9.4 103.7 1.0 9.7 103.8 10.4 104.1 C/E 10.9 105.0 11.2 105.4 12.5 105.7 13.5 105.8 15.5 105.9 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Pool Date:1/18/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 21, Pool 103 104 105 106 107 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 21, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.5 106.41 106.4 2.5 106.47 2.8 3.5 106.38 8.4 4.4 106.11 107.0 5.0 105.74 50.0 5.5 105.90 0.6 6.3 105.81 0.6 6.9 105.80 0.3 7.0 105.77 25.3 7.6 105.83 6.0 8.3 105.85 1.05 8.7 105.94 9.2 106.09 C/E 10.7 106.23 12.7 106.40 14.8 106.51 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 22, Riffle 105 106 107 108 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 22, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.0 107.5 107.3 2.3 107.6 6.3 3.3 107.5 10.9 4.1 107.2 NA 4.6 107.0 NA 5.0 106.3 1.3 5.4 106.2 1.2 6.0 106.0 0.6 7.0 106.0 NA 7.5 106.0 NA 8.2 106.1 0.9 8.8 106.3 9.1 106.7 C/E 9.8 106.7 12.6 107.2 15.3 107.3 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Pool Date:1/18/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 23, Pool 105 106 107 108 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 23, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.0 107.92 107.4 2.6 107.98 2.6 4.8 107.15 7.7 6.4 107.17 108.0 6.9 107.04 50.0 7.0 106.78 0.5 7.8 106.80 0.6 9.1 106.83 0.3 9.9 106.82 22.6 10.4 106.86 6.5 12.3 107.39 1.10 15.1 107.20 C/EStream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 24, Riffle 106 107 108 109 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 24, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.2 107.92 108.0 2.3 107.88 4.6 3.7 107.66 11.3 4.5 107.51 108.9 5.6 107.46 50.0 5.9 107.32 0.9 6.1 107.23 0.8 6.5 107.04 0.4 6.9 107.08 28.2 7.3 107.11 4.4 7.6 107.19 0.91 8.1 107.12 8.5 107.14 C/E 8.8 107.48 9.3 107.62 10.7 107.70 11.7 108.03 15.1 107.98 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 25, Riffle 106 107 108 109 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 25, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.3 108.63 108.6 2.1 108.83 3.0 3.4 108.73 8.6 4.3 108.72 109.2 4.9 108.54 50.0 5.4 108.24 0.7 5.9 108.09 0.6 6.5 108.16 0.3 7.5 108.17 24.7 8.1 108.19 5.8 8.5 108.18 1.0 9.0 108.12 9.4 108.28 C/E 9.8 108.47 10.1 108.49 11.3 108.70 14.9 108.94 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 26, Riffle 108 109 110 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 26, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.0 109.0 108.6 2.3 109.1 5.8 3.3 109.2 5.9 3.8 108.4 NA 4.0 108.0 NA 4.4 107.8 1.4 5.0 107.6 1.7 5.8 107.3 1.0 6.3 107.1 NA 6.8 107.2 NA 7.8 107.3 1.2 8.7 107.6 9.2 108.3 C/E 9.8 108.8 10.4 108.9 12.8 109.0 15.4 109.0 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Pool Date:1/18/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 27, Pool 107 108 109 110 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 27, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.4 109.46 109.5 2.8 109.55 5.0 4.1 109.27 12.2 4.7 108.99 110.4 5.5 108.83 50.0 5.9 108.73 0.9 6.3 108.58 1.0 6.7 108.58 0.4 7.2 108.63 29.5 7.7 108.79 4.1 8.5 108.76 1.08 8.7 108.84 9.4 108.87 C/E 12.1 109.35 15.3 109.41 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 28, Riffle 108 109 110 111 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 28, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.2 110.65 110.5 2.4 110.63 5.1 3.9 110.17 10.6 4.8 109.91 111.2 5.2 109.73 30.0 5.8 109.71 0.8 6.3 109.66 0.9 7.1 109.74 0.5 7.8 109.69 22.0 8.5 109.74 2.8 9.2 109.81 1.18 9.9 109.86 10.5 110.01 C/E 11.1 110.15 12.4 110.19 14.3 110.59 17.3 110.72 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 29, Riffle 109 110 111 112 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 29, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.1 111.0 110.7 2.0 110.9 10.2 4.3 110.5 11.4 5.2 110.3 NA 5.6 110.1 NA 6.1 108.7 2.0 6.8 108.7 1.6 7.6 108.8 0.9 8.5 108.9 NA 9.2 109.1 NA 9.8 109.3 0.8 10.4 109.5 10.9 109.6 C/E 11.3 109.9 12.0 110.3 13.5 110.6 16.1 110.8 18.1 111.0 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Pool Date:1/18/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 30, Pool 108 109 110 111 112 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 30, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.1 112.38 112.0 1.9 112.00 7.2 3.4 111.74 12.0 4.8 111.32 112.9 5.9 111.23 19.0 6.9 111.05 1.0 8.3 111.04 1.0 9.3 110.96 0.6 10.2 111.13 19.9 10.7 111.16 1.6 11.4 111.32 1.0 12.2 111.50 12.3 111.50 C/E 13.6 111.74 14.9 112.26 16.9 112.85 19.3 113.23 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 31, Riffle 110 111 112 113 114 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 31, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.2 113.3 113.0 2.1 113.3 14.9 3.4 112.8 13.8 4.5 112.4 NA 5.9 112.0 NA 6.3 111.8 2.4 7.0 110.8 1.9 7.7 110.8 1.1 8.1 110.6 NA 9.0 110.6 NA 9.7 110.7 0.8 10.5 110.8 10.8 111.1 C/E 11.1 111.7 11.4 111.9 12.0 112.1 12.7 112.5 14.0 112.7 16.1 112.9 19.7 113.4 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Pool Date:1/18/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 32, Pool 110 111 112 113 114 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 32, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.5 113.94 113.6 3.1 113.71 7.7 5.0 113.61 11.5 5.9 113.36 114.9 6.9 112.76 30.0 7.5 112.65 1.3 8.2 112.32 1.3 8.9 112.39 1.2 9.8 112.44 9.6 10.3 112.57 2.6 11.2 112.68 1.0 12.2 113.07 13.0 113.08 C/E 15.2 113.33 17.5 114.00 19.9 114.28 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 33, Riffle 112 113 114 115 116 0 10 20 30 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 33, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.3 114.6 113.6 3.6 114.2 7.4 5.5 113.8 5.5 6.5 113.6 NA 7.1 111.9 NA 7.9 111.8 1.8 8.5 111.9 1.7 10.0 111.9 1.3 11.0 112.4 NA 11.7 113.7 NA 13.1 114.0 1.0 15.0 114.5 18.2 114.9 C/EStream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Pool Date:1/18/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 34, Pool 111 112 113 114 115 116 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 34, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.0 115.21 115.1 3.1 114.96 7.4 4.7 114.67 11.7 5.4 114.56 116.2 6.0 114.08 30.0 6.9 113.95 1.1 8.1 113.97 1.0 9.2 114.01 0.6 10.3 114.26 18.5 11.0 114.21 2.6 11.6 114.72 0.87 12.2 114.75 13.5 115.32 C/E 15.5 115.71 18.0 116.04 Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 2, XS - 35, Riffle 113 114 115 116 117 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 2, XS - 35, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.2 104.00 104.1 3.1 103.98 4.1 3.7 103.87 10.1 3.9 103.76 105.0 4.0 103.69 50.0 4.5 103.59 0.9 5.1 103.56 0.8 5.8 103.25 0.4 6.3 103.22 25.3 6.8 103.42 4.9 7.5 103.59 0.92 7.9 103.63 8.5 103.65 C/E 9.4 103.64 9.8 103.94 10.5 104.20 11.6 104.30 13.2 104.28 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 3, XS - 1, Riffle Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 103 104 105 106 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 3, XS -1, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.3 104.46 104.5 3.4 104.36 5.0 4.3 104.32 12.0 5.3 104.04 105.4 6.4 103.78 50.0 7.5 103.61 0.9 8.1 103.56 0.8 8.8 103.72 0.4 9.6 103.64 28.6 10.7 103.85 4.2 11.2 104.10 0.93 11.9 104.40 13.3 104.69 C/E 16.4 104.76 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 3, XS - 2, Riffle Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 103 104 105 106 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 3, XS -2, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-02 2/10/20 MY-05 1/18/22 Station Elevation 0.3 104.7 104.7 3.0 104.5 4.0 4.4 104.6 10.3 5.1 104.5 NA 5.6 104.4 NA 6.0 104.1 1.0 6.5 104.0 0.9 6.8 103.9 0.4 7.2 103.8 NA 7.7 103.8 NA 8.2 103.8 0.9 8.5 103.9 8.9 104.1 C/E 9.5 104.4 10.3 104.6 11.4 105.1 14.5 105.4 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 3, XS - 3, Pool Feature Pool Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 103 104 105 106 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 3, XS - 3, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.6 106.43 106.3 2.3 106.45 3.1 3.6 106.25 10.6 4.3 106.18 106.9 4.6 106.23 50.0 4.8 106.10 0.6 5.2 106.02 0.7 5.5 105.86 0.3 5.9 105.74 36.4 6.2 105.75 4.7 6.6 105.85 1.15 7.0 105.88 7.5 105.81 C/E 7.9 105.76 8.2 105.81 8.6 105.83 9.9 105.97 10.4 105.99 11.3 106.06 11.6 106.12 12.1 106.23 13.1 106.4 15.6 106.2 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 3, XS - 4, Riffle Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 105 106 107 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 3, XS -4, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.0 106.5 106.2 2.4 106.5 4.9 3.5 106.4 9.4 4.0 106.2 NA 4.6 106.1 NA 5.0 105.5 1.1 5.4 105.4 1.1 5.8 105.2 0.5 6.4 105.1 NA 7.4 105.1 NA 8.0 105.1 1.0 8.8 105.2 9.3 105.3 C/E 9.8 105.6 10.4 106.1 10.8 106.2 11.7 106.2 13.1 106.1 15.0 106.1 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 3, XS - 5, Pool Feature Pool Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 104 105 106 107 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 3, XS - 5, Pool Bankfull MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Station Elevation 0.4 106.18 106.1 3.2 106.24 1.3 4.0 106.10 11.0 4.3 106.05 106.3 4.8 106.04 30.0 5.9 106.01 0.2 6.9 105.98 0.2 7.4 105.98 0.1 7.9 105.83 93.7 8.5 105.92 2.7 8.9 105.91 0.95 9.3 105.85 10.8 105.95 C/E 11.7 105.86 12.4 105.95 13.5 106.01 15.2 105.83 Site Motes Creek Watershed:Cape Fear, 0303002 XS ID UT 3, XS - 6, Riffle Feature Riffle Date:1/18/2022 Field Crew:Adams, Perkinson, Smith SUMMARY DATA Bankfull Elevation: Bankfull Cross-Sectional Area: Bankfull Width: Flood Prone Area Elevation: Stream Type Flood Prone Width: Max Depth at Bankfull: Mean Depth at Bankfull: W / D Ratio: Entrenchment Ratio: Bank Height Ratio: Low Bank Height: 105 106 107 0 10 20 El e v a t i o n ( f e e t ) Station (feet) Motes Creek, UT 3, XS -6, Riffle Bankfull Flood Prone Area MY-00 2/22/18 MY-01 8/27/18 MY-02 3/5/19 MY-03 2/10/20 MY-05 1/18/22 Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Appendix C. Vegetation Data Table 8. Total and Planted Stems by Plot and Species Vegetation Plot Photographs Table 8. Total Planted Stems by Plot and Species  Project Code 1500701.  Project Name: Motes Creek PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T Acer rubrum red maple Tree Betula nigra river birch Tree 8 8 8 11 11 11222666555666333333222111 Celtis occidentalis common hackberry Tree 111 Cercis canadensis eastern redbud Tree 111 Cornus amomum silky dogwood Shrub 222666222111111121212 222 444121212 Diospyros virginiana common persimmon Tree 3 3 3 111 Fraxinus pennsylvanica green ash Tree 444444779333111333777889444888444 Liquidambar styraciflua sweetgum Tree 1 51 Liriodendron tulipifera tuliptree Tree 2 112 Nyssa sylvatica blackgum Tree Pinus taeda loblolly pine Tree 1 1 22 Platanus occidentalis American sycamore Tree 1 2229911111112222222 Prunus serotina black cherry Tree Quercus oak Tree 111 Quercus alba white oak Tree 2 2 2 Quercus nigra water oak Tree 3 3 3 1 1 1 111111222 Quercus pagoda cherrybark oak Tree 111 Quercus phellos willow oak Tree 1 333222 Quercus rubra northern red oak Tree 2 Sambucus canadensis Common Elderberry Shrub 222 Ulmus alata winged elm Tree Ulmus americana American elm Tree Unknown Shrub or Tree 19 19 22 21 21 23 15 15 20 21 21 21 20 20 21 19 19 21 13 13 13 14 14 21 9 9 12 21 21 23 22 22 23 557335557444445444444445446889666 768.9 768.9 890.3 849.8 849.8 930.8 607 607 809.4 849.8 849.8 849.8 809.4 809.4 849.8 768.9 768.9 849.8 526.1 526.1 526.1 566.6 566.6 849.8 364.2 364.2 485.6 849.8 849.8 930.8 890.3 890.3 930.8 Color for Density Exceeds requirements by 10%PnoLS = Planted excluding livestakes Exceeds requirements, but by less than 10% P‐all = Planted including livestakes Fails to meet requirements, by less than 10% T = All planted and natural recruits including livestakes Fails to meet requirements by more than 10%T includes natural recruits 1 0.02 1 0.02 1 0.02 1 0.02 1 0.02 1 0.02 Stems per ACRE 1 0.02 1 0.02 1 0.02 Stem count size (ares) size (ACRES) Species count 1 0.02 1 0.02 1500701‐01‐0007 1500701‐01‐0008 1500701‐01‐0009 1500701‐01‐0010 1500701‐01‐0011 Scientific Name Common Name Species Type 1500701‐01‐0001 1500701‐01‐0002 1500701‐01‐0003 1500701‐01‐0004 1500701‐01‐0005 1500701‐01‐0006 Current Plot Data (MY5 2022) Table 8. Total Planted Stems by Plot and Species (continued)  Project Code 1500701.  Project Name: Motes Creek PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T Acer rubrum red maple Tree 113 Betula nigra river birch Tree 222888222111444444686868696969717171737373100100100 Celtis occidentalis common hackberry Tree 111111 Cercis canadensis eastern redbud Tree 1 1 1 222666101010111111111111121212 Cornus amomum silky dogwood Shrub 2 2 2 444222222 616161636363636363686868636363 Diospyros virginiana common persimmon Tree 4444411338337222 Fraxinus pennsylvanica green ash Tree 444222111222222 646467636375646469666675727272 Liquidambar styraciflua sweetgum Tree 1 21043 28 Liriodendron tulipifera tuliptree Tree 114113111113111 Nyssa sylvatica blackgum Tree 111666151516141414363637363636373737393939353535 Pinus taeda loblolly pine Tree 1 1 1 1 10 Platanus occidentalis American sycamore Tree 444555333 292933292941292931313136363636 Prunus serotina black cherry Tree 2 Quercus oak Tree 222 333222222777262626 Quercus alba white oak Tree 1 1 1 333333333333444 Quercus nigra water oak Tree 1 1 1 1 1 1 10 10 10 12 12 12 12 12 12 13 13 13 11 11 11 Quercus pagoda cherrybark oak Tree 111111222222777 Quercus phellos willow oak Tree 111111 555 121213101010141414131313111 Quercus rubra northern red oak Tree 2 111 111 Sambucus canadensis Common Elderberry Shrub 222224333333111 Ulmus alata winged elm Tree 7 Ulmus americana American elm Tree 8 Unknown Shrub or Tree 666 9 9 11 18 18 19 13 13 13 14 14 15 33 33 34 24 24 28 305 305 340 307 307 397 316 316 328 334 334 390 366 366 366 446778555556888336151519151519151515141416151515 364.2 364.2 445.2 728.4 728.4 768.9 526.1 526.1 526.1 566.6 566.6 607 1335 1335 1376 971.2 971.2 1133 726.1 726.1 809.4 730.8 730.8 945.1 752.2 752.2 780.8 795.1 795.1 928.4 871.3 871.3 871.3 Color for Density Exceeds requirements by 10%PnoLS = Planted excluding livestakes Exceeds requirements, but by less than 10% P‐all = Planted including livestakes Fails to meet requirements, by less than 10% T = All planted and natural recruits including livestakes Fails to meet requirements by more than 10%T includes natural recruits Species count Stems per ACRE Current Plot Data (MY5 2022) 17 0.42 17 0.42 17 0.42 17 0.42 17 0.42 1 0.02 1 0.02 1 0.02 1 0.02 1 0.02 1 0.02 MY1 (2018) MY0 (2018) Scientific Name Common Name Species Type Stem count size (ares) size (ACRES) 1500701‐01‐0013 1500701‐01‐0014 1500701‐01‐0015 1500701‐01‐0016 1500701‐01‐0017 Annual Means MY5 (2022)MY3 (2020) MY2 (2019)1500701‐01‐0012 Motes Creek Site MY5 (2022) Vegetation Monitoring Photographs (taken September 2022) Motes Creek Site Appendix A: Visual Assessment Data MY5 Monitoring Report –November 2022 Plot 1 Plot 2 Plot 3 Plot 4 Plot 5 Plot 6 Motes Creek Site MY5 (2022) Vegetation Monitoring Photographs (taken September 2022) Motes Creek Site Appendix A: Visual Assessment Data MY5 Monitoring Report –November 2022 Plot 7 Plot 8 Plot 9 Plot 10 Plot 11 Plot 12 Motes Creek Site MY5 (2022) Vegetation Monitoring Photographs (taken September 2022) Motes Creek Site Appendix A: Visual Assessment Data MY5 Monitoring Report –November 2022 Plot 13 Plot 14 Plot 15 Plot 16 Plot 17 Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Appendix D. Hydrology Data Table 9A. UT1 Upstream Channel Evidence Table 9B. UT1 Downstream Channel Evidence Stream Gauge Graphs Table 10. Verification of Bankfull Events Table 11. Groundwater Hydrology Data Groundwater Gauge Graphs Soil Temperature Graph Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Table 9A. UT1 Upstream Channel Evidence UT1 Upstream Channel Evidence Year 1 (2018) Year 2 (2019) Year 3 (2020) Year 4 (2021) Year 5 (2022) Max consecutive days channel flow 75 147 100 63 153 Presence of litter and debris (wracking) Yes Yes Yes Yes Yes Leaf litter disturbed or washed away Yes Yes Yes Yes Yes Matted, bent, or absence of vegetation (herbaceous or otherwise) Yes Yes Yes Yes Yes Sediment deposition and/or scour indicating sediment transport Yes Yes Yes Yes Yes Water staining due to continual presence of water Yes Yes Yes Yes Yes Formation of channel bed and banks Yes Yes Yes Yes Yes Sediment sorting within the primary path of flow Yes Yes Yes Yes Yes Sediment shelving or a natural line impressed on the banks Yes Yes Yes Yes Yes Change in plant community (absence or destruction of terrestrial vegetation and/or transition to species adapted for flow or inundation for a long duration, including hydrophytes) Yes Yes Yes Yes Yes Development of channel pattern (meander bends and/or channel braiding) at natural topographic breaks, woody debris piles, or plant root systems Yes Yes Yes Yes Yes Exposure of woody plant roots within the primary path of flow No No No No No Other: Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Table 9B. UT1 Downstream Channel Evidence UT1 Downstream Channel Evidence Year 1 (2018) Year 2 (2019) Year 3 (2020) Year 4 (2021) Year 5 (2022) Max consecutive days channel flow 80 135 101 127 264 Presence of litter and debris (wracking) Yes Yes Yes Yes Yes Leaf litter disturbed or washed away Yes Yes Yes Yes Yes Matted, bent, or absence of vegetation (herbaceous or otherwise) Yes Yes Yes Yes Yes Sediment deposition and/or scour indicating sediment transport Yes Yes Yes Yes Yes Water staining due to continual presence of water Yes Yes Yes Yes Yes Formation of channel bed and banks Yes Yes Yes Yes Yes Sediment sorting within the primary path of flow Yes Yes Yes Yes Yes Sediment shelving or a natural line impressed on the banks Yes Yes Yes Yes Yes Change in plant community (absence or destruction of terrestrial vegetation and/or transition to species adapted for flow or inundation for a long duration, including hydrophytes) Yes Yes Yes Yes Yes Development of channel pattern (meander bends and/or channel braiding) at natural topographic breaks, woody debris piles, or plant root systems Yes Yes Yes Yes Yes Exposure of woody plant roots within the primary path of flow No No No No No Other: 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 1/ 1 / 2 2 1/ 1 5 / 2 2 1/ 2 9 / 2 2 2/ 1 2 / 2 2 2/ 2 6 / 2 2 3/ 1 2 / 2 2 3/ 2 6 / 2 2 4/ 9 / 2 2 4/ 2 3 / 2 2 5/ 7 / 2 2 5/ 2 1 / 2 2 6/ 4 / 2 2 6/ 1 8 / 2 2 7/ 2 / 2 2 7/ 1 6 / 2 2 7/ 3 0 / 2 2 8/ 1 3 / 2 2 8/ 2 7 / 2 2 9/ 1 0 / 2 2 9/ 2 4 / 2 2 10 / 8 / 2 2 10 / 2 2 / 2 2 11 / 5 / 2 2 11 / 1 9 / 2 2 12 / 3 / 2 2 12 / 1 7 / 2 2 12 / 3 1 / 2 2 Ra i n f a l l  Am o u n t s  (i n ) Wa t e r  Le v e l  (i n ) Motes Creek Stream Flow Gauge UT1 Upstream Year  5 (2022 Data) 153 days 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 1/ 1 / 2 2 1/ 1 1 / 2 2 1/ 2 1 / 2 2 1/ 3 1 / 2 2 2/ 1 0 / 2 2 2/ 2 0 / 2 2 3/ 2 / 2 2 3/ 1 2 / 2 2 3/ 2 2 / 2 2 4/ 1 / 2 2 4/ 1 1 / 2 2 4/ 2 1 / 2 2 5/ 1 / 2 2 5/ 1 1 / 2 2 5/ 2 1 / 2 2 5/ 3 1 / 2 2 6/ 1 0 / 2 2 6/ 2 0 / 2 2 6/ 3 0 / 2 2 7/ 1 0 / 2 2 7/ 2 0 / 2 2 7/ 3 0 / 2 2 8/ 9 / 2 2 8/ 1 9 / 2 2 8/ 2 9 / 2 2 9/ 8 / 2 2 9/ 1 8 / 2 2 9/ 2 8 / 2 2 10 / 8 / 2 2 10 / 1 8 / 2 2 10 / 2 8 / 2 2 11 / 7 / 2 2 11 / 1 7 / 2 2 11 / 2 7 / 2 2 12 / 7 / 2 2 12 / 1 7 / 2 2 12 / 2 7 / 2 2 Ra i n f a l l  Am o u n t s  (i n ) Wa t e r  Le v e l  (i n ) Motes Creek Stream  Flow Gauge UT1 Downstream Year  5 (2022 Data) 264 days Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Table 10. Verification of Bankfull Events Date of Data Collection Date of Occurrence Method Photo (if available) March 3, 2019 January 13, 2019 Stream gauges and trail cameras captured a bankfull event after 1.03 inches of rain was documented between January 12 and 13, 2019 at an onsite rain gauge 1 March 3, 2019 February 23, 2019 Stream gauges and trail cameras captured a bankfull event after 3.27 inches of rain was documented between February 21-23, 2019 at an onsite rain gauge 2 May 2, 2019 March 21, 2019 Stream gauges and trail cameras captured a bankfull event after 2.18 inches of rain was documented between March 20 and 21, 2019 at an onsite rain gauge 3 May 2, 2019 April 8, 2019 Stream gauges and trail cameras captured a bankfull event after 1.8 inches of rain was documented between April 5 and 9, 2019 at an onsite rain gauge 4 May 2, 2019 April 13, 2019 Stream gauges and trail cameras captured a bankfull event after 4.59 inches of rain was documented between April 12 and 13, 2019 at an onsite rain gauge 5 May 2, 2019 April 19, 2019 Stream gauges and trail cameras captured a bankfull event after 2.03 inches of rain was documented between April 19 and 20, 2019 at an onsite rain gauge 6 February 10, 2020 February 6, 2020 Motes Creek cross-section photos capture wrack and laid-back vegetation in the floodplain after 3.44 inches of rain was documented on February 6, 2020 at an onsite rain gauge. 7 June 12, 2020 June 11, 2020 Wrack and laid-back vegetation were observed in the floodplain after 2.61 inches of rain was documented on June 11, 2020 at an onsite rain gauge. 8 June 3, 2021 July 14, 2021 Stream gauges captured a bankfull event after 2.76 inches of rain was documented between June 2 and 3, 2021 at an onsite rain gauge. -- January 18, 2022 January 3, 2022 Wrack and laid-back vegetation were observed in the floodplain after 1.93 inches of rain was documented on January 3, 2022 at an onsite rain gauge. 9 October 25, 2022 September 30, 2022 Wrack was observed along the top of bank and floodplain of UT1 after 2.68 inches of rain was documented on September 30, 2022 at an onsite rain gauge due to tropical storm Ian. 10 Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Photo 1: UT1 at bankfull stage Photo 2: UT1 at bankfull stage Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Photo 4: UT1 at bankfull stage Photo 3: UT1 at bankfull stage Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Photo 5: UT1 at bankfull stage Photo 6: UT1 at bankfull stage Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Photo 7: Wrack and laid-back vegetation along Motes Creek Photo 8: Wrack and laid-back vegetation along floodplain Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Photo 9: Wrack and laid-back vegetation along floodplain Photo 10: Wrack along UT1 top of bank and floodplain Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Table 11. Groundwater Hydrology Data * Gauge 3 malfunctioned during the beginning of the year 1 growing season. # Gauge 4 appears to have malfunctioned during the beginning of the year 5 growing season. It is expected to have captured a longer hydroperiod if functioning properly. Gauge Success Criteria Achieved/Max Consecutive Days During Growing Season (Percentage) Year 1 (2018) Year 2 (2019) Year 3 (2020) Year 4 (2021) Year 5 (2022) Year 6 (2023) Year 7 (2024) 1 Yes/64 days (27.8 percent) Yes/79 days (33.6 percent) Yes/71 days (30.3 percent) Yes/61 days (24.0 percent) Yes/59 days (25.1 percent) 2 Yes/93 days (40.4 percent) Yes/71 days (30.2 percent) Yes/35 days (15.0 percent) Yes/52 days (20.5 percent) Yes/42 days (17.9 percent) 3 No*/13 days (5.6 percent) Yes/60 days (25.5 percent) Yes/33 days (14.1 percent) Yes/50 days (19.7 percent) Yes/42 days (17.9 percent) 4 Yes/120 days (52.2 percent) Yes/136 days (57.9 percent) Yes/136 days (53.8 percent) Yes/151 days (59.4 percent) Yes#/24 days (10.2 percent) 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 2 1/ 1 1 / 2 2 1/ 2 1 / 2 2 1/ 3 1 / 2 2 2/ 1 0 / 2 2 2/ 2 0 / 2 2 3/ 2 / 2 2 3/ 1 2 / 2 2 3/ 2 2 / 2 2 4/ 1 / 2 2 4/ 1 1 / 2 2 4/ 2 1 / 2 2 5/ 1 / 2 2 5/ 1 1 / 2 2 5/ 2 1 / 2 2 5/ 3 1 / 2 2 6/ 1 0 / 2 2 6/ 2 0 / 2 2 6/ 3 0 / 2 2 7/ 1 0 / 2 2 7/ 2 0 / 2 2 7/ 3 0 / 2 2 8/ 9 / 2 2 8/ 1 9 / 2 2 8/ 2 9 / 2 2 9/ 8 / 2 2 9/ 1 8 / 2 2 9/ 2 8 / 2 2 10 / 8 / 2 2 10 / 1 8 / 2 2 10 / 2 8 / 2 2 11 / 7 / 2 2 11 / 1 7 / 2 2 11 / 2 7 / 2 2 12 / 7 / 2 2 12 / 1 7 / 2 2 12 / 2 7 / 2 2 Ra i n f a l l  Am o u n t s  (i n ) Gr o u n d w a t e r  Le v e l  (i n ) Motes Creek Groundwater Gauge 1 Year  5 (2022 Data) October 22 Growing Season  End59 days ‐25.1% March 1 Growing Season Start 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 2 1/ 1 1 / 2 2 1/ 2 1 / 2 2 1/ 3 1 / 2 2 2/ 1 0 / 2 2 2/ 2 0 / 2 2 3/ 2 / 2 2 3/ 1 2 / 2 2 3/ 2 2 / 2 2 4/ 1 / 2 2 4/ 1 1 / 2 2 4/ 2 1 / 2 2 5/ 1 / 2 2 5/ 1 1 / 2 2 5/ 2 1 / 2 2 5/ 3 1 / 2 2 6/ 1 0 / 2 2 6/ 2 0 / 2 2 6/ 3 0 / 2 2 7/ 1 0 / 2 2 7/ 2 0 / 2 2 7/ 3 0 / 2 2 8/ 9 / 2 2 8/ 1 9 / 2 2 8/ 2 9 / 2 2 9/ 8 / 2 2 9/ 1 8 / 2 2 9/ 2 8 / 2 2 10 / 8 / 2 2 10 / 1 8 / 2 2 10 / 2 8 / 2 2 11 / 7 / 2 2 11 / 1 7 / 2 2 11 / 2 7 / 2 2 12 / 7 / 2 2 12 / 1 7 / 2 2 12 / 2 7 / 2 2 Ra i n f a l l  Am o u n t s  (i n ) Gr o u n d w a t e r  Le v e l  (i n ) Motes Creek Groundwater Gauge 2 Year  5 (2022 Data) October 22 Growing Season  End 42 days ‐17.9% March 1 Growing Season Start 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 2 1/ 1 1 / 2 2 1/ 2 1 / 2 2 1/ 3 1 / 2 2 2/ 1 0 / 2 2 2/ 2 0 / 2 2 3/ 2 / 2 2 3/ 1 2 / 2 2 3/ 2 2 / 2 2 4/ 1 / 2 2 4/ 1 1 / 2 2 4/ 2 1 / 2 2 5/ 1 / 2 2 5/ 1 1 / 2 2 5/ 2 1 / 2 2 5/ 3 1 / 2 2 6/ 1 0 / 2 2 6/ 2 0 / 2 2 6/ 3 0 / 2 2 7/ 1 0 / 2 2 7/ 2 0 / 2 2 7/ 3 0 / 2 2 8/ 9 / 2 2 8/ 1 9 / 2 2 8/ 2 9 / 2 2 9/ 8 / 2 2 9/ 1 8 / 2 2 9/ 2 8 / 2 2 10 / 8 / 2 2 10 / 1 8 / 2 2 10 / 2 8 / 2 2 11 / 7 / 2 2 11 / 1 7 / 2 2 11 / 2 7 / 2 2 12 / 7 / 2 2 12 / 1 7 / 2 2 12 / 2 7 / 2 2 Ra i n f a l l  Am o u n t s  (i n ) Gr o u n d w a t e r  Le v e l  (i n ) Motes Creek Groundwater Gauge 3 Year  5 (2022 Data) October 22 Growing Season End 42 days ‐17.9% March 1 Growing Season Start 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 2 1/ 1 1 / 2 2 1/ 2 1 / 2 2 1/ 3 1 / 2 2 2/ 1 0 / 2 2 2/ 2 0 / 2 2 3/ 2 / 2 2 3/ 1 2 / 2 2 3/ 2 2 / 2 2 4/ 1 / 2 2 4/ 1 1 / 2 2 4/ 2 1 / 2 2 5/ 1 / 2 2 5/ 1 1 / 2 2 5/ 2 1 / 2 2 5/ 3 1 / 2 2 6/ 1 0 / 2 2 6/ 2 0 / 2 2 6/ 3 0 / 2 2 7/ 1 0 / 2 2 7/ 2 0 / 2 2 7/ 3 0 / 2 2 8/ 9 / 2 2 8/ 1 9 / 2 2 8/ 2 9 / 2 2 9/ 8 / 2 2 9/ 1 8 / 2 2 9/ 2 8 / 2 2 10 / 8 / 2 2 10 / 1 8 / 2 2 10 / 2 8 / 2 2 11 / 7 / 2 2 11 / 1 7 / 2 2 11 / 2 7 / 2 2 12 / 7 / 2 2 12 / 1 7 / 2 2 12 / 2 7 / 2 2 Ra i n f a l l  Am o u n t s  (i n ) Gr o u n d w a t e r  Le v e l  (i n ) Motes Creek  Groundwater Gauge 4 Year  5 (2022 Data) October 22 Growing Season End 14 days ‐6.0% before apparent  gauge malfunction. Gauge relaunched  4/28/22 and again  7/10/22. March 1 Growing Season Start 24 days ‐10.2% 35 40 45 50 55 60 65 70 75 80 1/ 1 / 2 2 1/ 1 1 / 2 2 1/ 2 1 / 2 2 1/ 3 1 / 2 2 2/ 1 0 / 2 2 2/ 2 0 / 2 2 3/ 2 / 2 2 3/ 1 2 / 2 2 3/ 2 2 / 2 2 4/ 1 / 2 2 4/ 1 1 / 2 2 4/ 2 1 / 2 2 5/ 1 / 2 2 5/ 1 1 / 2 2 5/ 2 1 / 2 2 5/ 3 1 / 2 2 6/ 1 0 / 2 2 6/ 2 0 / 2 2 6/ 3 0 / 2 2 7/ 1 0 / 2 2 7/ 2 0 / 2 2 7/ 3 0 / 2 2 8/ 9 / 2 2 8/ 1 9 / 2 2 8/ 2 9 / 2 2 9/ 8 / 2 2 9/ 1 8 / 2 2 9/ 2 8 / 2 2 10 / 8 / 2 2 10 / 1 8 / 2 2 10 / 2 8 / 2 2 11 / 7 / 2 2 11 / 1 7 / 2 2 11 / 2 7 / 2 2 12 / 7 / 2 2 12 / 1 7 / 2 2 12 / 2 7 / 2 2 So i l  Te m p  °F Date Motes Creek Soil Temperature Year  5 (2022 Data) March 1  47.59oF Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Appendix E. Benthic Data Results Field Habitat Forms AXIOM, CAPE FEAR, MOTES CREEK, ALAMANCE CO. NC, BENTHIC MACROINVERTEBRATES COLLECTED 6/7/2022. PAI ID NO 55816 55817 55818 STATION Motes Crk Motes Crk Motes Crk UT 1UT 3 DATE 6/7/2022 6/7/2022 6/7/2022 SPECIES Tolerance  Value Functional  Feeding Group MOLLUSCA Bivalvia Veneroida Sphaeriidae FC Pisidium sp.6.6 FC 11 Gastropoda Basommatophora Physidae Physella sp.8.7 CG 1 ANNELIDA Clitellata Oligochaeta CG Tubificida Naididae CG Tubificinae w.h.c.CG 1 Lumbriculida Lumbriculidae CG Lumbriculus sp.CG 2 Hirudinea P Rhynchobdellida Glossiphoniidae P Helobdella triserialis 9.3 P 1 ARTHROPODA Crustacea Isopoda Asellidae SH Caecidotea sp.8.4 CG 21 Amphipoda CG Crangonyctidae Crangonyx sp.7.2 CG 11 Hyalellidae Hyalella azteca 7.2 CG 2 Insecta Ephemeroptera Baetidae CG Callibaetis floridanus 9.2 CG 71 Caenidae CG Caenis sp.6.8 CG 2 Heptageniidae SC Stenonema femoratum 6.9 SC 16 Odonata PAI, Inc.Page 1 of 2 AxiommotesCrk 6 22cl AXIOM, CAPE FEAR, MOTES CREEK, ALAMANCE CO. NC, BENTHIC MACROINVERTEBRATES COLLECTED 6/7/2022. PAI ID NO 55816 55817 55818 STATION Motes Crk Motes Crk Motes Crk UT 1UT 3 DATE 6/7/2022 6/7/2022 6/7/2022 SPECIES Tolerance  Value Functional  Feeding Group Aeshnidae P Aeshna sp.P 23 Coenagrionidae P Argia sp.8.3 P 2 Ischnura sp.9.5 4 Corduliidae Somatochlora sp.8.9 P 3 Gomphidae P Stylurus sp.P 1 Libellulidae P Libellula sp.9.4 P 1 Coleoptera Dryopidae Helichus fastigiatus SC 1 Dytiscidae P 4 Neoporus sp.5 22 Haliplidae Peltodytes sp. 8.4 SH 1 Hydrophilidae P 1 Cymbiodyta rotunda CG 1 Diptera Chironomidae Ablabesmyia mallochi 7.4 P 12 Clinotanypus sp.7.8 P 2 Dicrotendipes neomodestus 7.9 CG 1 Natarsia sp.9.6 P 1 Paratendipes albimanus/duplicatus 5.6 1 Polypedilum flavum 5.7 SH 1 Procladius sp.8.8 P 3 Tribelos jucundum 5.7 CG 1 Culicidae FC Anopheles sp. 8.6 FC 3 Dixidae CG Dixella sp.CG 2 Tabanidae PI Chrysops sp. 6.7 PI 1 TOTAL NO. OF ORGANISMS 46 20 21 TOTAL NO. OF TAXA 14 14 13 EPT 3 1 0 BIOTIC INDEX ASSIGNED VALUES 8.04 7.53 7.51 PAI, Inc.Page 2 of 2 AxiommotesCrk 6 22cl Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Appendix F. Photo Log Motes Creek MY-05 (2022) Photo Log Photo 1: Fencing and Buffer Vegetation along UT 1 Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Photo 2: Fencing and Buffer Vegetation along Motes Creek near Crossing Motes Creek MY-05 (2022) Photo Log Photo 3: Motes Creek Piped Crossing Upstream Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Photo 4: Motes Creek Piped Crossing Downstream Motes Creek MY-05 (2022) Photo Log Photo 5: UT 1 Piped Crossing Upstream Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Photo 6: UT 1 Piped Crossing Downstream Motes Creek MY-05 (2022) Photo Log Photo 7: UT 2 Piped Crossing Upstream Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Photo 8: UT 2 Piped Crossing Downstream Motes Creek MY-05 (2022) Photo Log Photo 9: Bud Burst of Carya sp. Photo Taken 2/28/22 Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC Photo 10: Bud Burst of Cornus amomum Photo taken 2/28/22 Motes Creek MY-05 (2022) Photo Log Photo 11: Bud Burst of Liriodendron tulipifera Photo Taken 2/28/22 Motes Creek Bank Site Year 5 (2022) Annual Monitoring Report Appendices Cape Fear 02 Umbrella Mitigation Bank Restoration Systems, LLC