HomeMy WebLinkAboutJohnson Tract/Woodleif RoadNORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF. WATER QUALITY
April 13, 2000 RALEIGH REGIONAL OFFICE
W. Graham Cawthorne
Cawthorne, Moss, & Panc_iera
239 East Owens St.
Post Office Box 1253
Wake Forest, N.C. 27588
Subject: Neuse River Basin
Riparian Buffer Rules
Johnson Tract/Woodleif Road
NBRRO 00 -080
Wake County
Dear Mr. Cawthorne:
On March 17, 2000, I met with you at the subject property to conduct an evaluation of the stream features
present to determine whether the site would require compliance with the Neuse Buffer Rule. This specific
project is referenced by the Raleigh Regional Office as NBRRO 99 -080.
The features represented on the Wake County Soils and the Creedmore USGS maps were evaluated to
determine their subjectivity to the Neuse Buffer Rule. It was determined from the site visit that the there are
several features present on this property that are subject to the Neuse River Basin: Nutrient Sensitive Waters
Management Strategy; Protection and Maintenance of Existing Riparian Areas, Administrative Code
T15A:02B.0233 (NCAC 0233). The required buffer protection is delineated around the main creek and the
other features on the map received by this Office on March 21, 2000.
Thank you for your attention to this matter and if this Office can be of any assistance or if you have
additional questions, please do not hesitate to contact us. This letter only addresses the applicability of the
Neuse Riparian Buffer.
Sincerely,
Steve Mitchell
Environmental Scientist
cc: RRO /John Dorney
Wake County
H:\nbrlet.fbr\99nbr\woodleif.080
TF -7
2 0 1 0
1628 MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699 -1628
PHONE 919 -571 -4700 FAX 919- 571 -4718
AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - SO% RECYCLED /10% POST- CONSUMER PAPER
NOTES
1) ALL NEW ROADS WILL BE BUILT TO
N.C. D.O.T. SPECIFICATIONS AND I
DESIGNATED AS PUBLIC,
2) ALL LOTS VALL HAVE INDIVIDUAL I
WELLS AND INDIVIDUAL SEPTIC
TANKS.
3) ALL LOT. AREAS ARE GREATER %
THAN 4O.ODO SQUARE FEET.
4) THIS SUBDIVISION WILL COMPLY
WITH WAKE CO. SOIL AND EROSION
ORDINANCE.
5) NO BUILDING IS PERMITTED WITHIN 20 OF
A DRAINAGEWAY OR WATERSHED BUFFER.
6) THERE SHALL BE NO FILLING OR THE - ••• ---------- - -
ERECTION OF PERMANENT STRUCTURES
IN THE AREAS OF WAKE COUNTY ------
FLOOD HAZARD SOILS OR FEDERAL %
EMERGENCY MANAGEMENT AGENCY (FEMA)
100 YEAR FLOOD ZONES UNTIL A FLOOD
STUDY IS APPROVED BY WAKE COUNTY
OR FEMA-
7) BEFORE ACQUIRING A BUILDING PERMIT
FOR LOTS MARKED BY - THE BUILDER
MAY NEED TO OBTAIN A FLOOD HAZARD
AREA USE PERMIT FROM WAKE COUNTY
ENVIRONMENTAL
SERVICES. THE BUILDER'S ENGINEER. ARCH , TECT AND OR SURVEYOR
(AS APPROPRIATE) MUST CERTIFY ON ANY
PERMIT THAT ALL FLOOD HAZARD
%
REQUIREMENTS ARE MET. f
•
- - ----------
. ..............
LT
N,
j
-----------
..........
X"
%
%
%
EIP B):
J
'XI
CWHORNE. MOSS & PANCIERA, P.C. PRNE330M LAW MVEMM UP AYE. P.O. WX 1253 REST, PLC- 27M. (ft
73V NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
April 13, 2000 RALEIGH REGIONAL OFFICE
W. Graham Cawthorne
Cawthorne, Moss, & Panciera
239 East Owens St.
Post Office Box 1253
Wake Forest, N.C. 27588
Subject: Neuse River Basin
Riparian Buffer Rules
Johnson Tract/Woodleif Road
NBRRO 00 -080
Wake County
Dear Mr. Cawthorne:
On March 17, 2000, I met with you at the subject property to conduct an evaluation of the stream features
present to determine whether the site would require compliance with the Neuse Buffer'Rule. This specific
project is referenced by the Raleigh Regional Office as NBRRO 99 -080.
The features represented on the Wake County Soils and the Creedmore USGS maps were evaluated to
determine their subjectivity to the Neuse Buffer Rule. It was determined from the site visit that the there are
several features present on this property that are subject to the Neuse River Basin: Nutrient Sensitive Waters
Management Strategy; Protection and Maintenance of Existing Riparian Areas, Administrative Code
T15A:02B.0233 (NCAC 0233). The required buffer protection is delineated around the main creek and the
other features on the map received by this Office on March 21, 2000.
Thank. you for your attention to this matter and if this Office can be of any assistance or if you have
additional questions, please do not hesitate to contact us. This letter only addresses the applicability of the
Neuse Riparian Buffer.
Sincerely,
Steve Mitchell
Environmental Scientist
cc: RRO /John Dorney
Wake County
H:\nbrlet.f6r\99nbr\woodleif.080
1628 MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699 -1628
PHONE 919 -571 -4700 FAX 919 -571 -4718
AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED /10% POST - CONSUMER PAPER
NOTES
1) ALL NEW ROADS WILL BE BUILT TO
N.C. O.O.T. SPECIFICATIONS AND
DESIGNATED AS PUBLIC
2) ALL LOTS WILL HAVE INDIVIDUAL I
WELLS AND INDIVIDUAL SEPTIC
TANKS. •THAN 4O.ODO SQUARE FEET. t
3) ALL LOT.AREAS ARE GREATER
4) THIS SUBDIVISION VAU. COMPLY
WITH WAKE CO. SOIL AND EROSION
ORDINANCE.
5) NO BUILDING IS PERMITTED WITHIN 20- OF
A DRAINAGEWAY OR WATERSHED BUFFER.
6) THERE SHALL BE NO FILUNG OR THE - -------------- --
ERECTION OF PERMANENT STRUCTURES
IN THE AREAS .
WAKE COUNTY
FLOOD HAZARD SOILS OR FEDERAL
EMERGENCY MANAGEMENT AGENCY (FOAA)
JOG YEAR
FLOOD ZONES UNTIL A FLOOD
STUDY IS APPROVED BY WAKE COUNTY I
OR FEMA-
V
7) BEFORE AC(MRING A BUILDING PERMIT
FOR LOTS MARKED BY • THE 8 UDER
MAY NEED TO OBTAIN A FLOOD U
HAZARD
NUSE PERMIT FROM WAKE COUNTY
AREA T
ENVIRONMENTAL SERVICES. THE BUILDER'S
ENGINEER ARCHITECT AND OR SURVEYOR
(AS APPROPRIATE) MUST CERTIFY ON ANY \,`-
16
PERMIT THAT ALL FLOW HAZARD %
%
REQUIREMENTS ARE MET,
- ---------
----------
..........
7
%
%
J,
%
% II, ...............
I J
-------------
...........
4`y
Eli B)i
J,
%
CAWFHORNE. MOSS be PANCIERA. P.C. PMfMMMX LAW SWOMM '231 FAST OVM AW— P.O. OW 125& WAK FORM. N.C.. 27W (in
April 13, 2000
W. Graham Cawthorne
Cawthorne, Moss, & Panciera
239 East Owens St.
Post Office Box 1253
Wake Forest, N.C. 27588
Dear Mr. Cawthorne:
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
RALEIGH REGIONAL OFFICE
Subject: Neuse River Basin
Riparian Buffer Rules
Johnson Tract/Woodleif Road
NBRRO 00 -080
Wake County
On March 17, 2000, I met with you at the subject property to conduct an evaluation of the stream features
present to determine whether the site would require compliance with the Neuse Buffer Rule. Thi- specific
project is referenced by the Raleigh Regional Office as NBRRO 99 -080 ^ _
The features represented on the Wake Count Soils and the reedmore SGS maps w evaluated
P Y P
to determine their subjectivity to the Neuse Buffer Rule t was determined from the site visit that the
there are several features present on this property that are subject to the Neuse River Basin: Nutrient
Sensitive Waters Management Strategy; Protection and Maintenance of Existing Riparian Areas,
Administrative Code T15A:02B.0233 (NCAC 0233). The re fired buffer protection is delineated around
the main creek and the other features on the map received bhis Office on March 21, 2000.
Thank you for your attention to
additional questions, please do no
Neuse Riparian %Rer.
cc:
Wake County
H:\nbrlet.for\99nbr\woodleif.080
1,t nd if this ffice can be of any assistance or if you have
to c tact uV This letter only addresses the applicability of the
Scientist
1628 MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699 -1628
PHONE 919 - 571 -4700 FAX 919 -571 -4718
AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED /10% POST- CONSUMER PAPER
Cawthorne, Moss & Panciera, P.C., Professional Land Surveyors
W. Graham Cawthorne, Jr. PLS L-2923 e ep one -
Michael A. Moss, PLS L -3794 Fax (919) 554 -1370
Jason L. Panciera, PLS L -3835
239 East Owen Avenue
PO Box 1253
Wake Forest, North Carolina
March 20, 2000
Mr. Steve Mitchell
NCDEHNR/ DWQ
Raleigh Regional Office
4800 Barrett Dr. Suite 101
Raleigh, NC 27609
27588
RE: Johnson Tract - Woodnef Rd., Wake County
Dear Steve,
Attached is a reduced copy of the Johnson Property. I have shaded the
Neuse buffer streams on this map to represent the streams we discussed. Wake County
Soil & Erosion would like for me to submit a letter from DWQ acknowledging your
acceptance of these buffer locations. Please contact me with questions or concerns.
Thank you for your prompt response to this request.
Sin(
X(A
President
WGC /sel
encl.
i