Loading...
HomeMy WebLinkAbout20070810 Ver 1_Certification of Completion_20071001GLT ~ ' Certification of Completion ~~ g~ ~s DWQ ProjectNo.: 0`~ ` ~~ ~ ~ County: ~f1~J Applicant: ~i~~ ~NG`I~~~RItJ(~- ~~ ~ ~~ Proj ect Name: ~ U SCE ~w-~A ~ P ~'`~ ~I-A ~ ~ P~ ~~ ST~~ I~ (~~STO I~~ `r~ ~~ Date of Issuance of Wetland Permit: ~~ ~-` ~ Certif.%cate of Completion Upon, completion of all work approved within the 401' Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 40I Oversight/Express Permitting Urut, North Carolina Division of Water Quality, 1650 Ma.il~ Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the .applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. . Applicant's certification ~-- I, ~lE,;,,~ /~,~,.{ ~~., ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification'andBuffcr Rules, the•approved plans and specifications, and other supporting materials. ~~ Signature: ~ ~ ^ Date: ~ ' Z-~' ~0-7 Agent's C`e~ti~cation I, ~ ~ ,hereby state that, to~the best of my abilities, due care and diligence was used in the observation of the construction .such that the construction .was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved .plans and specifications, and other supporting materials. ~ • Signature; Date: If this project was designed by a Certified Professional I, as a duly registered Professional ~ ~ (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to, observe ~ (periodically; weekly,• full time) the construction of the •project, for the Permittee hereby state that, to the best of my abilities, due care 'and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality .Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date • D ~~~ ~ ~ . OG1 4 ~ Z007 ... ,~r,~,oa a"vo sT~~^-`w,a~ sTMw~c-~