HomeMy WebLinkAboutNC0060534_Report_20170126North Carolina
January 20, 2017
Mr. G. Landon Davidson, P.G., Regional Office Supervisor
Surface Water Protection Section
North Carolina Division of Water Quality
2090 US Highway 70
Swannanoa, North Carolina 28778
RECEIVEDI►NCDEQIDIIVR
JAN 2 6 2017
Water Quality
Permitting Section
Subject: Environmental Management Commission Settlement Agreement
Quarterly Status Report
City of Brevard Collection System
NPDES Permit N£OO2 1 4/-
C44c5 / Transylvania County
Dear Mr. Davidson,
As requested, the City of Brevard offers the following documentation regarding compliance
activities with regard to the Environmental Management Commission Settlement Agreement
requirements. The reporting period includes Collections System activities for October, November
and December of 2016.
1. The city remains actively dedicated to fulfilling collection system management
requirements and has continued to provide funding for system improvements each fiscal
year. Funds budgeted for FY 2016-2017 include $100,000 for inflow and infiltration
elimination.
City of Brevard Public Works Department
232 Cashiers Valley Road
Brevard, NC 28712
828-884-2171, Option 4
During this quarter there were no sewer discharge events in the city. The Tennessee
Valley Authority reported a total of 5.39" of precipitation was received in the Brevard area
during this quarter. This amount of rainfall was 4.22" less than the previous quarter
reported. It is believed l&I elimination on the system and less rainfall attribute to the lack
of events this reporting period.
2. CDM Smith progressed during this quarter with the following work for the Neely Road
pump station, force main, and equalization storage project.
• Pump Station and Equalization Tank Project
o Contractors for Wharton -Smith, Inc. began installation of the foundation
and wet well walls for the new pump station facility in October, 2016.
Steel used for wet well wall footings.
Steel mats airlifted into place
for wet well wall installation.
Forms prepared to assist with
installation of wet well walls.
Installation of steel mats
for wet well walls.
City of Brevard Public Works Department
232 Cashiers Valley Road
Brevard, NC 28712
828-884-2171, Option 4
Installation of 24" line from bar
screen into new wet well wall.
Relocation of existing 24" manhole at
the Waste Water Treatment Plant.
o Terratec Incorporated, contractors specializing in foundation repair and
soil stabilization, mobilized on -site and began micro pile installations at the
equalization tank.
o Public Works personnel assisted Wharton -Smith, Inc. with installation of
278' of 8" pipe at the Equalization Tank on Wilson Road.
• Force Main Project
o Of the projected total of 13,300 LF at project completion, 6,099 LF of pipe,
including DI (Ductile Iron), PVC (Poly Vinyl Chloride) and HDPE (High
Density Polyethylene) have been installed by Hall Contracting Corporation
as of December 31, 2016.
Pipe directed with track hoe as boring
is performed beneath the French
Broad River.
Inserted pipe pulled beneath the
French Broad River.
City of Brevard Public Works Department
232 Cashiers Valley Road
Brevard, NC 28712
828-884-2171, Option 4
o Contractors for Trull Paving & Grading conducted milling operations along
Neely Road utilizing water accessible through the City of Brevard Public
Works facility and a fire hydrant at the existing pump station.
24" back reamer enlarging pilot
hole for Gilbreath Branch bore.
Gilbreath Branch HDPE pipe insertion.
o Bore and pipe installation beneath the French Broad River for the Force
Main project commenced in November, 2016.
o The NCDOT replaced one of four culverts scheduled for replacement prior
to completion of the Force Main project.
o A total of 55' of 3/4" water service line and 6' of 4" sewer service line were
replaced by Public Works personnel due to damage by contractor during
sewer installation.
o Utility lines were located by the Public Works Collections staff on Neely
Road and Old Hendersonville Highway as requested by the contractor.
o Routine site inspections and monthly progress meetings were conducted
throughout this reporting period.
3. Brown Consultants, PA accomplishments consist of the following items this quarter:
• Kings Creek Phase II
o Dillard Excavating, Inc. replaced a total of 1,555' of existing 6" line along
Batson Road, Grove Circle and Willow Drive with new 8" pipe.
o Four (4) new manholes were installed along Batson Road and Willow Drive.
City of Brevard Public Works Department
232 Cashiers Valley Road
Brevard, NC 28712
828-884-2171, Option 4
Batson Road sewer service installation.
• Kings Creek Phase III
Batson Road manhole installation.
o Dillard Excavating, Inc. replaced a total of 2,418' of existing 6" line with
new 8" pipe along Dogwood Drive, Gaston Street, Grove Circle, Harold
Street, Lakeview Avenue, Miner Street, Pine Street and Varsity Street.
o Six (6) new manholes were installed along Miner Street and Varsity Street.
o Restoration included asphalt paving of all affected streets.
This information is offered on behalf of the City of Brevard Collections System. As projects
progress and additional compliance issues are addressed, further documentation will be
provided. Should you have any questions or require any further information, please feel free to
contact me at 828-884-2171, Option 4.
DL/js
Respectfully Submitted,
CITY OF BREVAR
David Lutz, Director
Public Works Department
City of Brevard Public Works Department
232 Cashiers Valley Road
Brevard, NC 28712
828-884-2171, Option 4
cc: Pretreatment Emergency Response and Collection System Unit, Division of Water Quality
Tim Heim, DWQ Asheville Regional Office Environmental Specialist
Randy Hintz, DWQ Asheville Regional Office Regional Supervisor
Jim Fatland, City Manager
Billy Dodson, Collections System Supervisor, City of Brevard
Nathaniel Littleton, Collections System Operator, City of Brevard
Jeffrey Brown, P.E., Brown Consultants, PA
Wayne Miles, P.E., BCEE, CDM Smith
Michael K. Sloop, P.E., CDM Smith
City of Brevard Public Works Department
232 Cashiers Valley Road
Brevard, NC 28712
828-884-2171, Option 4