Loading...
HomeMy WebLinkAboutNC0074268_authorization to construct_20011120City of Gastonia Crowders Creek WWTP Permit No. NC0074268 ENGINEER'S CERTIFICATION FOR 1 SOURCE BRANCH CONSTRUCTION OF WASTEWATER TREATMEN + • ITIES Wt\\t'aw T. S o.V)a a am a duly registered Professional Engineer (please print) in the State of North Carolina and have been authorized to observe (circle one: periodically weekly, full time) the construction of the subject project for the Permittee: Project No.: 074268ACA Project: City of Gastonia Crowders Creek WWTP BNR Upgrades The project consists of: • modification of the existing aeration basins to accommodate step -feed denitrification; • replacement of manhole number 2 with a new splitter box for delivering primary effluent to the biological reactors; • replacement of manhole number 5 with a new splitter box for delivering reactor effluent to the secondary clarifiers; • installation of a nitrate recycle pump station in support of denitrification efforts; • installation of.a dissolved oxygen (DO) control system in support of biological,nutrient removal efforts; • replacement of diffusers in the aeration basins with a fine bubble membrane disk system; • modification to the existing raw sludge pumping station; and . • all piping. valves and appurtenances as illustrated on the attached approved design documents. I hereby certify that I did regularly observe this project with due care and diligence and that the construction was comma substantial conformance with the Authorization to Construct and with the approved plates "� : r jw • ns. Signature *A' 4 I Date Qcto<' Registration No. 1t6 I2 The Division of Water Quality hereby acknowledges receipt and acceptance of thbe - ()Delineation tfZ01oi Upon completion of construction and prior to operation of the modified facility, the Permittee shall provide the Division with a certification from a professional engineer certifying that the pennitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct, and the approved plans and specifications. The Certification should be submitted to: NCDENR/DWQ, NPDES Unit, 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director May 3, 2000 Mr. Coleman Keeter City of Gastonia Post Office Box 1748 Gastonia, North Carolina 28053 Dear Mr. Keeter: rA NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Subject: Authorization to Construct ATC No. 074268ACA NPDES Permit No. NC0074268 Crowders Creek WWTP Gaston County The Division of Water Quality's NPDES Unit has reviewed your request for an Authorization to Construct at the Crowders Creek WWTP. The Division finds the proposed improvements to be satisfactory and hereby grants authorization for the following: • modification of the existing aeration basins to accommodate step -feed denitrification; • replacement of manhole number 2 with a new splitter box for delivering primary effluent to the biological reactors; • replacement of manhole number 3 with a new splitter box for delivering reactor effluent to the secondary clarifiers; • installation of a nitrate recycle pump station in support of denitrification efforts; • installation of a dissolved oxygen (DO) control system in support of biological nutrient removal efforts; • replacement of diffusers in the aeration basins with a fine bubble membrane disk system; • modification to the 'existing raw sludge pumping station; and • all piping, valves and appurtenances as illustrated on the attached approved design documents. Completion of the above treatment plant improvements does not alter the permitted capacity of the treatment facilities, which remains 6.0 MGD. This Authorization to Construct is issued in accordance with NPDES Permit No. NC0074268, currently in the process of renewal, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the terms and conditions of the permit. The Permittee shall notify the Water Quality Supervisor of the Mooresville Regional Office, telephone number (704) 663-1699, at least forty-eight (48) hours prior to operation of the installed facilities, so that an in -place inspection can be made. Notification shall be made during the normal office hours of 8:00 a.m. until 5:00 p.m., Monday through Friday. Engineer's Certification Upon completion of construction and prior to operation of the modified facility, the Permittee shall provide the Division with a certification (copy enclosed) from a professional engineer registered in North Carolina certifying that the 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone (919) 733-5083 FAX (919) 733-0719 An Equal Opportunity Affirmative Action Employer Internet: http://h2o.enr.state.nc.us/NPDES y A Crowders Creek WWTP NPDES Permit No. NC0074268 ATC No. 074268ACA Page 2 permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct, and the approved plans and specifications. The Certification should be submitted to: NCDENR / DWQ, NPDES Unit, 1617 Mail Service Center, Raleigh, North Carolina 27699-1617. Requirements for Certified Operator The Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8G, .0200. The ORC of the facility must visit each Class 1 facility at least weekly and each Class 1I, III, and IV facility at least daily, excluding weekends and holidays; and must properly manage and document daily operation and maintenance of the facility and comply with all other conditions of Title 15A, Chapter 8G, .0200. Additional Requirements The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143-215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. The Permittee shall maintain a copy of the approved plans and specifications on file for the life of the facility. One (1) copy of the approved plans and specifications is enclosed for your records. If you have any questions about this Authorization to Construct, please contact Mark McIntire, at (919) 733-5083, extension 553. Sincerely, (Kerr T. Stevens Director Enclosures: Project Plans and Specifications (approved) Engineer's Certification Form cc: Mr. Ross Stroud, Arcadis, Geraghty `d? Miller (w/ certification form) 2301 Rexwoods Dr., Suite 200, Raleigh, NC, 27607-3366 Mooresville Regional Office, Water Quality Technical Assistance and Certification Unit Central Files NPDES Unit Files at„