Loading...
HomeMy WebLinkAbout[External] 401 coordination for Camp Davis Runway, Camp LejeuneFrom:Shaver, Brad E CIV USARMY CESAW (USA) To:Bowers, Todd; 401-R4notices Cc:Sprinkle, Hannah H Subject:[External] 401 coordination for Camp Davis Runway, Camp Lejeune Date:Monday, November 7, 2022 8:20:32 AM Attachments:20211369 Approval Letter v.2.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Todd, In accordance with 40 CFR 121.12(a) the attached 401 Certification was received October 31,2022 and dated the same by the NC DEQ Division of Water Resources. This decision was for fillimpacts associated with the upgrade of an existing runway at Camp Davis, Onslow County,action ID 2021-01633. This project is being verified under Nationwide 14. The Corps looks forward to your feedback to the above 401(a)(2) notification. If any questions arise please don’t hesitate to reach out to me, Brad Brad Shaver Project Manager US Army Corps of Engineers 69 Darlington Ave Wilmington, NC 28403 (910) 251-4611 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: https://regulatory.ops.usace.army.mil/customer-service-survey/