Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6220904_Plansheet - Grading/Drainage Plan_20221102 (2)
2 1/2" EIP LEANING O ERS 1"ANGLE O IRON 1 1 I 1 1 I 1 1 1 1 I 1 1 I 1 1 1 1 I 1 1 ROAD SIDE DITCHES TO BE REINFORCED INV WITH NAG S75 MATTING 1 329.34 STAPLE PATTERN D 1 0 PAUL W. WILKES & WIFE, ° �11 U- HEDI J. WILKES 1 DB 688, PG 459 1 '329.75 li 1 INV 324.90 j PIPE 1 V 62.00 LF @ 2.02% 18" CLASS V RCP I INV I z la n M TEMPORARY CONSTRUCTION 1 PP ' SEE PLAN FOR WIDTH 1 BERMUDA GRASS OR EXISTING EROSION CONTRL LINING GROUND SEE GRADING PLAN( 1 ' 1L J1 2 yid 2 DEPTH 2 1� 1� ( ( �1 "TMM.. COMPACTED SUBGRADE 2.0' UNLESS OTHERWISE SHOWN N- 11 1 CROSS SECTION FOR DITCH 2, 69 & 10 I 1. I 1 TBM I ,\ 4D DISK #1 I\ N 458,931.849 E 1,896,989.414 ELEV 332.09 INC GRID NAD 83 (2011) NAVD 88 EXISTING PIPE LENGTH TO BE REDUCED BY 2' DITCH #1 TO BE REINFORCED Yl WITH NAG SC250 PERMANENT MATTING STAPLE PATTERN E IMMEDIATELY UPON CONSTRUCTION STOCKPILE AREA 327.92��SF --, ( 1 PIPE 2 26.00 LF @ 6.35% 36" RCP_ 1/2" EIP LEGEND: PK 0 PK-PK NAIL E"Z ECM -EXISTING CONCRETE MONUMENT EIP 00 EIP-EXISTING IRON PIPE EIR 00 EIR-EXISTING IRON ROD EIS O EIS -EXISTING IRON STAKE EPKO EPK-EXISTING PK NAIL ECSO ECS-EXISTING COTTON SPINDLE SPKO SPK-SET PK NAIL o COMPUTED POINT N/F - NOW OR FORMERLY R/W - RIGHT OF WAY RCP - REINFORCED CONCRETE PIPE PROPERTY LINE ADJACENT PROPERTY LINE TIE LINE RIGHT-OF-WAY UGT UNDERGROUND TELEPHONE LINE // OVERHEAD UTILITY X FENCE LINE TREE LINE 325 MAJOR CONTOUR 322 MINOR CONTOUR x 329.34' SPOT ELEVATION BENCHMARK © MAILBOX pp UTILITY POLE ❑T TELEPHONE PEDESTAL ,CFIRE HYDRANT LuJ WATER METER ASPHALT 0 SOIL UNSUITABLE SOILS — roc— roc— LIMITS OF CONSTRUCTION — sF — sF — SILT FENCE LINE —.■ — —.■ —JUTE NETTING — DIV — DIV — DIVERSION BERM 0INLET PROTECTION OCHECK DAM 4p s� m 0 NC GRID NAD 83 (2011) C 'Y O� S� N/F SHAUNNA MARIE DUNLAP DB 661, PG 763 DITCH #5 TO BE REINFORCED \ WITH NAG C125BN MATTING l STAPLE PATTERN D 341 �.�. 344 - SF SF SF SF SIF SrSF LOC LOC L0 -� LOC — LOG_7 LOC LOC- 0 \ \ ENTRANCE Sp 0 LFi( 36" RCP \\ \� Sp /— T ^ - J Q o INV 1NV 323.65 323.95 326.24 26.50 LF C� 0.57% �N61 11 11 • f i - 36" CLASS V RCP m \ RIP RAP DISSIPATER! �5 0 off'' M v 1 L=9' W=4.5/10.5' OZ'CI-16 D-8" 10-12„ o FES CLASS B 18" THICK M� , ,, 1 1 I O RIP RAP DISSIPATER I• 325 / L-24' W=9/27' / I1 fn D50=10" D.Ax 15" O \ DITCH #2 CLASS 1 22.5" THICK I i� ' TO BE REINFORCED CI-12 I r l o O 1 O O I N O O O O 10 11 12 WITH NAG S75 MATTING o I� 47 \ O / O o T o N/F STAPLE PATTERN D O \ � o IMMEDIATELY UPON CONSTRUCTION s ARNOLD R. BOWEN &WIFE, / 'AtC 6I-13 \ J y SYLVIA G. BOWEN 1 54.00 LF @ 0.56% 18" RCP � 26.50 LF @ 0.57% 18" RCP I I' z DB 262, PG 473 1 I �1 2' BOTTOM `� J'� �' l I " 0 0 SIDE SLOPE 6'® 3.1 b I�1 � � L 0 1 Q 3 TIE ® 2:1 l SErAE.. I f J�111" y 1LI: % E.�P:':''.' 322 El \ 32 LOC 1 rT1 U ,� I / pRP.:. i.: FES-14 \ m INLET \ /� z m r- :'. N 459,085.466 \ / �� o I PROTECTION `\ DITCH #7 DITCH #8 1 I 1 E 1,897,278.713 _ �i TO BE SEEDED o TO BE SEEDED Q a I �'' NC GRID NAD 83 �'8 JI (T) WITHIN 7 DAYS WITHIN 7 DAYS 1D J . w RIP RAP DISSIPATER (2011) LIMITS OF CONSTRUCTION M o a \ O M 001 001 001 0 1 001 1 co 29L=9' W=4.5/10.5' �` .. 7.8 AC I 001 001 001 001 00l —� n I U 20 DRAINAGE `Oc D,�B" DMA1�12" 3 3 CI-9 \ ` ( ) OT-5 21:75 LF C� 0.69% 24" RCP 001 001 001 ^ 341.. — .. — .. — .. — . — .. — .. — .. — .. — .. — .. — .. — .. —OT-1 — 341.. — .. — .. — F- C .S DITCH #3 CLASS B 18' THICK `OC LOC LOC OC LOC LOC L C LOC LO Ol 001 00 001 00 21.75 LF C� 0.69% 24 RCP EASEMENT 33.50 LF C� 0.90% 18" RCP Z 14� TO BE REINFORCED REDUCED SHOULDER RIP RAP DISSIPATER WITH NAG S75 MATTING 6' SHOULDER @ \ �29.37 CI-6 m L=3' W=1 /3' STAPLE PATTERN D 1.5% FS 2s 1 D-8" D,,, 12" �2e 329.51 \ 4) 26.50 LF @ 0.57% g39 CI-2 26.50 LF @ 0.57% I 3:1 BS \ PINNACLE COURT 1 - TEMPORARY SKIMMER BASIN #1 "3 \ as < 1 `24" CLASS V RCP \ 24" CLASS 3 RCP cA CLASS B 18" THICK ��a, \ ' 332.02 s \ 50' R/W (PUBLIC) 341 34� m 1 \ L=96', W=20', D=3' 331.22 �s 3> CI-7 34p � I r-1 1 SIDE SLOPES= 2:1 \ CI-10 TOP OF BASIN: : 319. ' 32.00 LF @ 4.06% 18" RCP a28 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 1 CI-3 _ m 1 BOTTOM OF BASIN: 319.00' F Sf0� OC LOC _ LOC L C LO LOCH F F F �q F Sao ��o SF F m RIP RAP DISSIPATER gg 6' EMERGENCY SPILLWAY: 321.00 — - SF LOC L0C LOC LO — LO — LO — LOGS —LOGS .. LO Lys.. — .. — .. �Q L=9' W=4.5/10.5' ,FES-11 1—..—..—..—..—..—..—..—..—..—..——..—..—..—.—..—..—..—..—.. —..—.. —.. —.. —..� � \ 1 ) INVERT OF SKIMMER: 319.00' w 48.00 LF @ 0.52% 24" RCP I SIDE SLOPES OF BASIN ARE TO DS0=8" D-12" w I �, 48.00 LF C� 0.56% 24" RCP n 1 CLASS B 18" THICK DITCH 4 M rl of TEMPORARY SKIMMER BASIN 3 ' BE SEEDED WITHIN SEVEN DAYS. # l FES-8 # 1 **ATTACH A 1.5" FAIRCLOTH SKIMMER (OR EQUAL) TO BE REINFORCED L=130', W=40', D=3' ( I \ WITH NAG S75 MATTING SIDE SLOPES= 2:1 RIP RAP DISSIPATER 1 N WITH 1.0" ORIFICE FOR DEWATERING THE STAPLE PATTERN D RIP RAP DISSIPATER Ln - I O � 0 340 1 SEDIMENT BASIN DURING CONSTRUCTION \ / TOP OF BASIN: 336.80' L=12' W=6 14' ""....M " I TEMPORARY SKIMMER BASIN 2 L=12' W=6 14' I < / M DITCH #9 I 1 \ # D-8" DmA 12" v BOTTOM OF BASIN: 333.80' D-8" D—L12" 1\ CA2 0 o I TO BE SEEDED L=73', W=30', D=3' , S" : \":"..:. o � 12' EMERGENCY SPILLWAY: 325.80' CLASS B 18" THICK � 1 SIDE SLOPES= 2:1 CLASS B 18" THICK � w I WITHIN 7 DAYS I TOP OF BASIN: 326.50' "" INVERT OF SKIMMER: 333.80' A r \ I < I SIDE SLOPES OF BASIN ARE TO o v ECM WITH 1 BOTTOM OF BASIN: 323.50' I IU) M BE SEEDED WITHIN SEVEN DAYS. O 1" EIP , 1\ 6' EMERGENCY SPILLWAY: 325.50' \ \ ` r " �� **ATTACH A 2.0" FAIRCLOTH SKIMMER (OR EQUAL) ""."." J ,\ INVERT OF SKIMMER: 323.50' ) \ STOCKPILE 1 20' DRAINAGE _j WITH 1.7" ORIFICE FOR DEWATERING THE 0 SIDE SLOPES OF BASIN ARE TO / 1 \ AREA ` EASEMENT SEDIMENT BASIN DURING CONSTRUCTION. 1/2� BE SEEDED WITHIN SEVEN DAYS. I • "".. 37 1 EIP **ATTACH A 1.5" FAIRCLOTH SKIMMER (OR EQUAL) \ \ 46 45 44 IN o O O o 1 \ 1 43 42 41 40 39 38 � 1 ERS 1 WITH 1.1" ORIFICE FOR DEWATERING THE �� N I 1\ N F SEDIMENT BASIN DURING CONSTRUCTION. ` ( I H. P. WALTERS & WIFE, �I co o. I� N/F 1 I BETTY WALTERS \ l \ t I r O RICHARD L. MUMMA JR. &WIFE, 1 1 DB 200, PG 187 �o ` / SILT FENCING ::", - n M `: Z::" J SHARON D. MUMMA I 1 s�o \\ (TYP) v>11 DB 834, PG 150 \ CO o M. 1 \ \ \ ..:""."":.D :. RIP RAP DISSIPATE 1 Ii I ( TEMPORARY SKIMMER BASIN 4 cn L=3 W=1 3 # O m/ \ L=180', W=45', D=3' D-8" D-12" 1 RIP RAP DISSIPATER I _ m" I 1 1 0 2' BOTTOM Z .". CLASS B 18" THICK L=3' W=1 3' SIDE SLOPES- 2:1 DIVERSION BERM / o \ TO BE SEEDED D-8" D-12" SIDE SLOPE 6'® 3:1 TOP OF BASIN: 339.50' l BOTTOM OF BASIN: 336.50' 1 I\ WITHIN 7 DAYS (TYP) DITCH #6 CLASS B 18" THICK �. A TIE ®2:1 r I 1 , > TO BE REINFORCED I U) vl c 12' EMERGENCY SPILLWAY: 338.50' o V 1 20' `DRAINAGE WITH NAG SC150 MATTING a40 INVERT OF SKIMMER: 336.50' 0 o I EASEMENT STAPLE PATTERN D �I U SIDE SLOPES OF BASIN ARE TO I 00-1 0 ✓\ BE SEEDED WITHIN SEVEN DAYS. -1)01 001 00 11 \ LOC L0('■ I 1 1 1 1 0 USE NCDOTSTOCKPILE W 838.01.� ' L--ZjX l X X R X X �J . 001 —*OI _DOl` DOl 340 DOI DOI �0 z 0 D w 25' DRAINAGE EASEMENT \— SF w \ O 00 1 N 459,255.995 00 1 I IV DI **ATTACH A 2.5 FAIRCLOTH SKIMMER (OR EQUAL) 1 , • E 1,897,675.999 NC GRID NAD 83\ D V 328 333 WITH 2.1" ORIFICE FOR DEWATERING THE SEDIMENT BASIN DURING CONSTRUCTION. 1 (2011) 1/2" 31/2"° I , O EIP X 2" FLAT STEEL EIR 1EIIR X - I I Know what's below. \ � \ ' 1 Call before dig. I N/F I you N/F ELIZABETH MARIE DAYTON-FRUM DB 1178, PG 995 CHARLES R. BEECHER & WIFE, _ SHERRIE A. LANDON 1 I1 , N/F (� 2 TRACT 2 OF DB 1187, PG 651 ANTHONY HUBERT & WIFE, CHERYL M. HUBERT -� N/F I 1 1 DB 954, PG 142 CHARLES R. BEECHER & WIFE, I GRAPHIC SCALE *ALL STORM PIPE TO BE CLASS III PC 3-14, MAP 3 SHERRIE A. LANDON TRACT 1 OF I1 ECS RCP UNLESS OTHERWISE NOTED. DB 1187, PG 651 50 0 25 50 100 I PC 3-14, MAP 3 I 1 , ( IN FEET ) 1 1 inch - 50 ft. ERS � 1 I , I I 1 1 THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED 1 1 1 1 200 I I 4 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, INC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com IICAR9 �% .•••• ••. •% `9 i ,•4� SEA �� •; 0274 0 REVISIONS PROJECT NAME HIDDEN VALLEY SUBDIVISION DETAILED GRADING AND EROSION CONTROL PLAN CLIENT TG VENTURES LLC 9820 US Hwy 301 North Lumberton, North Carolina 28360 Phone: (910) 802-4959 PROJECT INFORMATION DESIGNED BY: BRETT DRAWN BY: BRETT CHECKED BY: SCOTT PROJECT NUMBER: 1860 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED AUGUST 9, 2022 SHEET NUMBER C-3m 1