Loading...
HomeMy WebLinkAboutSW6220904_Design Calculations_20221102 (5)DATE DESIGN PHASE 07-22-22 PRELIMECT NAME rHidd!en PROJECT NO CONSTR / X Valle Subdivision 1860 REVISIONCATION RECORDewiffle BY Townshi , Raeford, NC BPB OTHER (SPECIFY) CHECKED BY CSB Storm Outlet Structure FES No.= FES-4 Pipe Dia= 24 in Q10 = 16.73 cfs Qfull = 16.90 cfs Vfull = 5.37 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: s Length Storm Outlet Structure FES No.= FES-8 Pipe Dia= 24 in Q10 = 14.95 cfs Qfull = 16.33 cfs Vfull = 5.19 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: s v 3 Length Zone D50 DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Zone D50 DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Q10/Qfu11 = 0.99 V/Vfu I = 1.14 V = 6.1 fps = 2 = 8 in = 12 in = B = 18 in = 12.0 ft = 6 ft = 14.0 ft Q10/QfuI1 = 0.92 V/Vfu 11 = 1.13 V = 5.9 fps = 2 = 8 in = 12 in = B = 18 in = 12.0 ft = 6 ft = 14.0 ft 1860-Storm drainage.xlsx LATEST REVISION: 11/2/2022 6:41 AM PAGE 1 OF 5 • • ` DATE DESIGN PHASE PRELIM 07-22-22 ME riddenValley PROJECT NO CONSTR / X / Subdivision 1860 REVISION RECORD BY Quewiffle Township, Raeford, NC BPB OTHER (SPECIFY) CHECKED BY CSB Storm Outlet Structure FES No.= FES-11 Pipe Dia= 18 in Q10 = 4.94 cfs Qfull = 21.17 cfs Vfull = 11.96 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Storm Outlet Structure FES No.= FES-14 Pipe Dia= 18 in Q10 = 3.96 cfs Qfull = 7.83 cfs Vfull = 4.42 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: s Length Zone D5o DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Zone D5o DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Q10/Qfu11 = 0.23 V/Vfu I = 0.81 V = 9.7 fps = 2 = 8 in = 12 in = B = 18 in = 9.0 ft = 4.5 ft = 10.5 ft Q1 o/Qfu I = 0.51 V/Vfu11 = 1.00 V = 4.4 fps = 2 = 8 in = 12 in = B = 18 in = 9.0 ft = 4.5 ft = 10.5 ft 1860-Storm drainage.xlsx LATEST REVISION: 11/2/2022 6:41 AM PAGE 2 OF 5 • • ` DATE DESIGN PHASE PRELIM 07-22-22 ME riddenValley PROJECT NO CONSTR / X / Subdivision 1860 REVISION RECORD BY Quewiffle Township, Raeford, NC BPB OTHER (SPECIFY) CHECKED BY CSB Storm Outlet Structure FES No.= FES-17 Pipe Dia= 36 in Q10 = 45.21 cfs Qfull = 48.80 cfs Vfull = 6.90 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Storm Outlet Structure FES No.= FES-20 Pipe Dia= 18 in Q10 = 7.96 cfs Qfull = 29.16 cfs Vfull = 16.48 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: s Length Zone D5o DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Zone D5o DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Q10/Qfu11 = 0.93 V/Vfu I = 1.14 V = 7.8 fps = 3 = 10 in = 15 in = 1 = 22.5 in = 24.0 ft = 9 ft = 27.0 ft Q10/QfuI1 = 0.27 V/Vfu11 = 0.83 V = 13.7 fps = 2 = 8 in = 12 in = B = 18 in = 9.0 ft = 4.5 ft = 10.5 ft 1860-Storm drainage.xlsx LATEST REVISION: 11/2/2022 6:41 AM PAGE 3 OF 5 • • ` DATE DESIGN PHASE PRELIM 07-22-22 ME riddenValley PROJECT NO CONSTR / X / Subdivision 1860 REVISION / X / RECORD / X / BY Quewiffle Township, Raeford, NC BPB OTHER / X / (SPECIFY) CHECKED BY CSB Storm Outlet Structure FES No.= FES-23 Pipe Dia= 18 in Q10 = 4.76 cfs Qfull = 7.58 cfs Vfull = 4.28 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Storm Outlet Structure FES No.= FES-25 Pipe Dia= 15 in Q10 = 2.49 cfs Qfull = 13.19 cfs Vfull = 10.73 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: s Length Zone D5o DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Zone D5o DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Q10/Qfu11 = 0.63 V/Vfu11 = 1.06 V = 4.5 fps = 2 = 8 in = 12 in = B = 18 in = 9.0 ft = 4.5 ft = 10.5 ft Q1 o/Qfu I = 0.19 V/Vfu11 = 0.75 V = 8.1 fps = 2 = 8 in = 12 in = B = 18 in = 7.5 ft = 3.75 ft = 8.8 ft 1860-Storm drainage.xlsx LATEST REVISION: 11/2/2022 6:41 AM PAGE 4 OF 5 • ` DATE DESIGN PHASE PRELIMME 07-22-22 rid(denValley PROJECT NO CONSTR / X / Subdivision 1860 REVISION / X / RECORD / X / BY Quewiffle Township, Raeford, NC BPB OTHER / X / (SPECIFY) CHECKED BY CSB Storm Outlet Structure FES No.= PIPE 1 OUT Q10/Qful1 = 0.30 Pipe Dia= 18 in V/Vfull = 0.87 Q10 = 4.40 cfs V = 7.3 fps Qfull = 14.90 cfs Vfull = 8.40 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: s v 3 Length D50 = 8 in DMAX = 12 in Riprap Class = B Apron Thickness = 18 in Apron Length = 9.0 ft Apron Width @ Outlet = 4.5 ft Apron Width @ End = 10.5 ft 1860-Storm drainage.xlsx LATEST REVISION: 11/2/2022 6:41 AM PAGE 5 OF 5