Loading...
HomeMy WebLinkAboutSW6220903_Design Calculations_20221102 (4)Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Wednesday, Jul 6 2022 PIPE 3 Invert Elev Dn (ft) = 115.95 Calculations Pipe Length (ft) = 64.00 Qmin (cfs) = 1.63 Slope (%) = 0.55 Qmax (cfs) = 1.63 Invert Elev Up (ft) = 116.30 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 15.0 Shape = Circular Highlighted Span (in) = 15.0 Qtotal (cfs) = 1.63 No. Barrels = 1 Qpipe (cfs) = 1.63 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 1.77 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 3.29 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 116.83 HGL Up (ft) = 116.83 Embankment Hw Elev (ft) = 117.01 Top Elevation (ft) = 119.10 Hw/D (ft) = 0.57 Top Width (ft) = 30.00 Flow Regime = Inlet Control Crest Width (ft) = 5.00 Ele (R) 120.00 119 00 118 M 117 M 116 M 11500 PIPE 3 Hw Depth i$i 3.70 2.70 170 070 -030 -130 114 00 -2311 0 5 10 15 ZO 25 30 35 40 d6 50 55 fi0 65 70 75 80 05 CSraiar Glverl HGL EmI—k Rmrh (t)