Loading...
HomeMy WebLinkAboutSW6220902_Design Calculations (Storm Drains)_20221102" ''DDESIGN 7RO'ECTNAME 01-20-22 PROJECT NO 1632 PHASE PRELIM CONSTR / X REVISION Carolina BY CJP RECORD // OTHER / / CHECKED BY CSB (SPECIFY) n= 0.013 9= 226 h= 26 STORM DRAINAGE SCHEDULE CONTINUED AREAS (INLETS) INLET AREA (AC) INLET Cc RUNOFF COEFF. INLET DISCHARGE (CFS) 0(+) UPSTREAM BYPASS (CFS) CIO INLET BYPASS (CFS) CAPTURED INLET DISCHARGE (CFS) TOTAL AREAS (AC) INLET TIME (MIN) PIPE TIME (MIN) Tc TIME OF CONC. (MIN) I INTENSITY (IN/HR) Cc RUNOFF COEFF. FROM TO 0.45 2.63 0.00 0.10 2.52 0.85 0.41 0.00 0.00 0.41 CI Cl2 CI 1.46 1.46 5.00 0.00 5.00 7.29 0.45 Cl2 P03 C12 0.12 1.58 5.00 0.08 5.08 7.27 0.48 0.40 8.99 0.00 0.00 8.99 0.75 1.17 0.10 0.00 1.17 0.75 0.69 0.00 0.00 0.69 DAforPO4 adjusted for 25yr flow 5.00 7.29 0.40 5.01 7.29 0.42 PO4 C15 PO4 5.62 5.62 5.00 0.00 CI5 CI6 C15 0.36 5.98 5.00 0.01 CI6 P07 C16 0.23 6.20 5.00 0.04 5.04 7.28 0.43 0.40 1.62 0.00 0.10 1.51 0.80 0.32 0.00 0.00 0.32 CI CI C18 1.01 1.01 5.00 0.00 5.00 7.29 0.40 CI P010 CI 0.10 1.11 5.00 0.08 5.08 7.27 0.44 0.40 2.00 0.00 0.17 1.82 0.85 0.48 0.00 0.01 0.47 CI 11 C112 CI 11 1.25 1.25 5.00 0.00 5.00 7.29 0.40 Cl 12 P013 Cl 12 0.14 1.39 5.00 0.08 5.08 7.27 0.45 0.70 0.73 0.00 0.01 0.71 0.85 0.51 0.00 0.00 0.50 0.65 1.27 0.00 0.09 1.18 0.80 0.21 0.00 0.00 0.21 Cl 14 C115 Cl 14 0.26 0.26 5.00 0.00 5.00 7.29 0.70 Cl 15 C116 Cl 15 0.15 0.41 5.00 0.08 5.08 7.27 0.75 Cl 16 C117 Cl 16 0.49 0.90 5.00 0.16 5.16 7.25 0.70 Cl 17 P018 Cl 17 0.07 0.97 5.00 0.27 5.27 7.23 0.70 0.50 2.02 0.00 0.23 1.78 0.85 0.63 0.00 0.01 0.62 CI 19 C120 CI 19 1.01 1.01 5.00 0.00 5.00 7.29 0.50 C120 PO 21 C120 0.18 1.19 5.00 0.08 5.08 7.27 0.55 0.40 3.15 0.00 0.00 3.15 0.85 0.76 0.00 0.00 0.76 0.85 0.62 0.00 0.00 0.62 PO 22 C123 PO 22 1.97 1.97 5.00 0.00 5.00 7.29 0.40 C123 C124 C123 0.22 2.19 5.00 0.03 5.03 7.28 0.45 C124 PO 25 C124 0.18 2.38 5.00 0.09 5.09 7.27 0.48 0.45 2.50 0.00 0.35 2.15 0.85 0.67 0.00 0.05 0.62 0.45 1.47 0.00 0.12 1.35 0.85 0.51 0.00 0.01 0.50 0.90 0.19 0.00 0.00 0.19 0.90 0.15 0.00 0.00 0.15 C126 C127 C126 1.39 1.39 5.00 0.00 5.00 7.29 0.45 C127 C128 C127 0.20 1.59 5.00 0.08 5.08 7.27 0.50 C128 C129 C128 0.82 2.40 5.00 0.18 5.18 7.25 0.48 C129 C130 C129 0.15 2.55 5.00 0.25 5.25 7.23 0.50 C130 C131 C130 0.05 2.61 5.00 0.32 5.32 7.22 0.51 C131 PO 32 C131 0.04 2.65 5.00 0.37 5.37 7.20 0.52 0.85 1.42 0.00 0.10 1.32 0.85 0.96 0.00 0.03 0.92 C133 C134 C133 0.42 0.42 5.00 0.00 5.00 7.29 0.85 C134 PO 35 C134 0.28 0.70 5.00 0.08 5.08 7.27 0.85 0.45 2.50 0.00 0.35 2.15 0.85 0.67 0.00 0.05 0.62 C136(DBL) C137 C136(DBL) 1.39 1.39 5.00 0.00 5.00 7.29 0.45 C137 PO 38 C137 0.20 1.59 5.00 0.08 5.08 7.27 0.50 1632P2 STORM I. 16-YEAR Oaie: 111212822 Time: 708 AM Page 1 of 4 • " PROJECT NAME Woodlake II Ph, II DATE 01-20-22 PROJECT NO 1632 DESIGN PHASE PRELIM / / CONSTR / X / REVISION / / LOCATION Hoke County, North Carolina BY CJP RECORD / / OTHER CHECKED BY CSB (SPECIFY) n= 0.013 9= 226 h= 26 STORM DRAINAGE SCHEDULE -CONTINUED Q DISCHARGE (CFS) Q SIDE- STREAM (CFS) SLOPE DIA. (IN) CAPACITY (FULL) (CFS) V FULL (FPS) LENGTH (FT) SEGMENT TIME (MIN) UPPER INV. (FT) LOWER INV. (FT) UPSTREAM TOP ELEV. (FT) FROM TO 5.2 26 0.08 11.4 25 0.04 214.25 217.83 213.07 217.83 CI Cl2 4.79 0.00 0.0096 15 6.3 214.50 Cl2 P03 5.52 0.00 0.0472 15 14.0 214.25 19.89 21.82 23.06 15.9 9 0.01 209.94 213.19 209.05 213.19 208.70 213.19 PO4 C15 0.00 0.0365 30 78.3 210.25 209.94 209.05 CI5 CI6 0.00 0.0342 30 75.9 15.4 26 0.03 CI6 P07 0.00 0.0053 30 30.0 6.1 66 0.18 5.2 26 0.08 210.75 214.32 210.00 214.32 CI CI9 2.95 0.00 0.0096 15 6.3 211.00 210.75 CI P010 3.52 0.00 0.0368 15 12.4 10.1 20 0.03 K2 26 0.08 212.00 215.58 211.50 215.58 CI 11 Cl 12 3.64 0.00 0.0096 15 6.3 212.25 212.00 Cl 12 P013 4.49 0.00 0.0189 15 8.9 7.2 26 0.06 5.2 26 0.08 214.75 218.36 212.10 218.36 211.80 215.42 211.50 215.21 CI 14 Cl 15 1.32 0.00 0.0096 15 6.3 215.00 214.75 Cl 15 Cl 16 2.24 0.00 0.0481 15 14.2 11.5 55 0.08 Cl 16 Cl 17 4.54 0.00 0.0091 15 6.2 5.0 33 0.11 212.10 Cl 17 P018 4.91 0.00 0.0135 15 7.5 6.1 22 0.06 211.80 5.2 26 0.08 201.45 205.04 200.50 205.04 CI 19 C120 3.68 0.00 0.0096 15 6.3 201.70 C120 PO 21 4.81 0.00 0.0586 15 15.6 12.7 16 0.02 201.45 13.1 24 0.03 193.20 196.84 192.86 196.84 190.50 196.84 PO 22 C123 10.06 4.32 0.0332 24 41.2 194.00 193.20 CI23 Cl 24 11.45 0.00 0.0118 24 24.6 7.8 29 0.06 C124 PO 25 12.55 0.00 0.0846 24 65.8 20.9 28 0.02 192.86 5.6 26 0.08 196.40 199.95 194.11 199.95 193.81 197.61 191.11 197.61 190.65 194.21 190.30 194.21 Cl 26 Cl 27 4.55 0.00 0.0115 15 6.9 196.70 196.40 Cl 27 C128 5.76 0.00 0.0368 15 12.4 10.1 62 0.10 C128 C129 8.40 0.00 0.0115 18 11.3 6.4 26 0.07 194.11 193.81 C129 C130 9.31 0.00 0.0490 18 23.2 13.1 55 0.07 Cl 30 C131 9.64 0.00 0.0177 18 14.0 7.9 26 0.05 191.11 190.65 Cl 31 PO 32 9.90 0.00 0.0173 18 13.8 7.8 20 0.04 5.2 26 0.08 206.45 209.99 205.50 209.99 CI 33 Cl 34 2.59 0.00 0.0096 15 6.3 206.70 Cl 34 PO 35 4.32 0.00 0.0345 15 12.0 9.8 28 0.05 206.45 5.6 26 0.08 186.60 190.20 186.00 190.20 Cl 36(DBL) C137 4.55 0.00 0.0115 15 6.9 186.90 186.60 C137 PO 38 5.76 0.00 0.0249 15 10.2 8.3 24 0.05 1632P2 STORM A. 16-YEAR Date: 111212822 Time: 708 AM Page 2 of 4 0.0 26 1632P2 STORM I. 10-YEAR O t. 111212022 Time: 708 AM Page 3 of 4 7NAME ATE 1-20-22 PROJECT NO 1632 DESIGN PHASE PRELIM CONSTR / X REVISION BY CJP RECORDCarolina OTHER / / CHECKED BY CSB (SPECIFY) n= g= h= 0.013 226 26 HYDRAULIC GRADE LINE -CONTINUED DESIGN CRITERIA: 1. DESIGN FORTHE 10YR STORM 2. ASSUME TIME OF CONCENTRATION TO AN INDIVIDUAL INLET = 5 MIN. (Unless otherwise noted) 3. INTENSITY =g/(h+T), FOR 10 YR STORM (g and h were denied from Raleigh -Durham Intensity - Duration -Frequency Charts, REF: INC Erosion and Sediment Control Planning and Design Manual) 4. MANNINGS "n" FACTOR= 0.013 5. RUNOFF COEFICIENT C-0.50 (Per CR-7107) OUTLET W.S. ELEV (FT) INLET W.S. ELEV. FLOW CONDITION CONTROL FREE- BOARD T) HGL TO CROWN COMMENTS CAPACITY VS DISCHARGE FROM TO OUTLET CONTOL (FT) INLET CONTROL (FT) USE (FT) CI 1 Cl 2 215.75 216.03 215.78 216.03 OUTLET 1.80 (0.28) OK 1.54 C12 P03 214.07 214.44 215.75 215.75 INLET 2.08 (0.25) OK 8.51 PO4 C15 212.04 212.21 212.21 212.21 OUTLET 0.98 0.54 OK 58.44 C15 CI6 211.29 211.55 212.04 212.04 INLET 1.15 0.40 OK 54.06 CI6 P07 210.70 211.29 211.25 211.29 OUTLET 1.90 0.26 OK 6.90 C18 C19 211.75 211.86 211.87 211.87 INLET 2.45 0.38 OK 3.39 CI9 P010 211.00 211.14 211.73 211.73 INLET 2.59 0.27 OK 8.87 CI 11 Cl 12 213.20 213.37 213.25 213.37 OUTLET 2.21 0.13 OK 2.70 Cl 12 P013 212.50 212.75 213.20 213.20 INLET 2.38 0.05 OK 4.39 Cl 14 Cl 15 215.75 215.77 215.68 215.77 OUTLET 2.59 0.48 OK 5.01 Cl 15 Cl 16 213.52 213.65 215.52 215.52 INLET 2.84 0.48 OK 11.92 Cl 16 Cl 17 213.12 213.52 213.32 213.52 OUTLET 1.90 (0.17) OK 1.62 Cl 17 P018 212.50 212.85 213.12 213.12 INLET 2.09 (0.07) OK 2.60 CI 19 C120 202.74 202.90 202.71 202.90 OUTLET 2.14 0.05 OK 2.66 C120 PO 21 201.50 201.73 202.74 202.74 INLET 2.30 (0.04) OK 10.84 PO 22 C123 194.80 194.94 195.44 195.44 INLET 1.40 0.56 OK 31.15 C123 C124 194.55 194.74 194.77 194.77 INLET 2.07 0.43 OK 13.13 C124 PO 25 192.10 192.33 194.55 194.55 INLET 2.29 0.31 OK 53.25 C126 C127 197.98 198.23 197.92 198.23 OUTLET 1.72 (0.28) OK 2.39 C127 C128 196.32 197.21 197.98 197.98 INLET 1.97 (0.33) OK 6.63 C128 C129 195.76 196.32 195.84 196.32 OUTLET 1.29 (0.71) OK 2.88 C129 C130 193.50 194.42 195.76 195.76 INLET 1.85 (0.45) OK 13.93 C130 C131 192.75 193.50 193.14 193.50 OUTLET 0.71 (0.89) OK 4.33 C131 PO 32 191.50 191.97 192.75 192.75 INLET 1.46 (0.60) OK 3.92 C133 C134 207.61 207.69 207.52 207.69 OUTLET 2.30 0.26 OK 3.74 C134 PO 35 206.50 206.74 207.61 207.61 INLET 2.38 0.09 OK 7.68 C136(DBL) C137 188.18 188.62 188.12 188.62 OUTLET 1.58 (0.47) OK 2.39 C137 PO 38 187.00 187.70 188.18 188.18 INLET 2.02 (0.33) OK 4.44 1632P2 STORM A. 16-YEAR Oar.: 111212822 Time: 708 AM Page 4 of 4