HomeMy WebLinkAboutU-5839_PermitDrawings_2022-10-28(Version 3.00; Released August 2021)50230.1.1TIP/Proj No:U-5839County(ies):Haywood Page 1of 2TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?NoDesign/Future:Year:2041Existing:Year:City/Town:21.8Typical Cross Section Description: Surrounding Land Use: NoWetlands within Project Limits?20.51.19Project DescriptionProposed ProjectFrench BroadRiver Basin(s): Jon Moore, PE1000 Birch Ridge DriveWBS Element:Roadway WideningWBS Element:NV5 / David P. Bocker, PENCDOT Contact:919-707-6738Suite 100Charlotte, NC 28227Contractor / Designer:704-566-43427500 East Independence Blvd.david.bocker@nv5.comHaywoodWaynesvilleProject Built-Upon Area (ac.)26475A typical section is a 4-lane (11' width lane) roadway with divided raised median. Including 5' bicycle lanes with 2'-6" curb and gutter and a 4' planting strip with 5' sidewalk for pedestrian accommodations.2021jlmoore6@ncdot.govAnnual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.ac.North Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:Hydraulics UnitAddress:General Project InformationU-583950230.1.1Raleigh, NC 27610Address:10/28/2022Typical section consists of a 4-lane roadway with a shared center turn lane and 2'-6" curb and gutter with sidewalk and no planting strip. 29975Mix of commercial development, residential neighborhoods and very few forested areas.The North Carolina Department of Transportation (NCDOT) is proposing to widen 1.1 miles of Russ Avenue (US 276) from the intersection of SR 1202 (Phillips Rd) to US 23 Business (Main Street). A 4-lane median divided facility is proposed including bicycle and pedestrian accommodations. Bridge number 430186 over Richland Creek will be replaced as part of this project.General Project Narrative:(Description of Minimization of Water Quality Impacts)
(Version 3.00; Released August 2021)50230.1.1TIP/Proj No.:U-5839County(ies):Haywood Page 2of 2Aquatic T&E Species?NoComments:YesN/ANoAquatic T&E Species?Comments:Aquatic T&E Species?Comments:North Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSWBS Element:Supplemental Classification: Surface Water Body (2): Deck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative)NRTR Stream ID:N/ASurface Water Body (1): Richland CreekNCDWR Stream Index No.:5-16-(11.5)General Project InformationSupplemental Classification: NoneWaterbody InformationNCDWR Surface Water Classification for Water BodyNRTR Stream ID:Buffer Rules in Effect:NRTR Stream ID:Other Stream Classification: Impairments:Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?Deck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)Impairments:Primary Classification: Class B(If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)Richland CreekBuffer Rules in Effect:Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?N/AImpairments:NoneOther Stream Classification: NoneSupplemental Classification: NCDWR Surface Water Classification for Water BodyPrimary Classification: Other Stream Classification: Surface Water Body (3): NCDWR Stream Index No.:Buffer Rules in Effect:Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer?NCDWR Stream Index No.:NCDWR Surface Water Classification for Water BodyPrimary Classification: (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)Deck Drains Discharge Over Water Body?
40240340440540840941041141241341441541641741841942042142242342442542642742842943043143243343443543643743843944044244344444544644744844945045145245345445545645745845946046146246346446546646746846947047147247347447554" RCPINV=2685.07’INV=2685.76’
INV=2690.75’54" RCP
54" RCP
INV=26
91.94’
INV=2692.19’
INV=2694.70’BK 69.71 RT-L- 55+95.563" PlasticElv. 2674.94’TH 1
118.40 RT-L- 55+90.033" PlasticElv. 2676.10’TH 2
VICINITY MAPNAD 83PROJECT
BEGIN
D
T
V
=
=
=
=
=
=
%
%
MPH
ADT
ADT
% *
FUNC CLASS =
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
K
0
0
0
PROFILE (HORIZONTAL)
PROJECT LENGTH
RIGHT OF WAY DATE:
LETTING DATE:
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATA
SIGNATURE:
SIGNATURE:
P.E.
P.E.
2018 STANDARD SPECIFICATIONS
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEER
ROADWAY DESIGN
LOCATION:
TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0
00
10/28/2022R:\Hydraulics\PERMITS_Environmental\Drawings\U-5839_HYD_TSH.dgnDavid.BockerCONTRACT:TIP PROJECT:ARTMEN
N ASO
H
DEPT
O
F TRA SPORTTIONTATEOFNRTCAR
O
LI
NASee Sheet 1A For Index of Sheets
HAYWOOD COUNTY
-BORDER ST--Y8-
-N MAI
N ST-
-US
2
3 BUSI
NESS-
-Y1-
-LOVE LN-
-Y12-
-BIBLE BAPTIST DR-
-Y15--Y21RPA-NAD 83/95U-5839PROJECT
END
-BRANNER AVE-
-Y3-
-B OUNDAR Y ST --Y2-
-WAYNESVILLE PLAZA--Y18-
-LEE ST--Y7-
-DELLWOOD RD--Y9-
-HOWELL MI
LL RD-
-Y10--ORCHARD VIEW RD--Y11--BARBER BLVD--Y13--FRAZIER ST--Y14--Y21RPB-
-Y21LPB-
-
Y21
LP
D--Y21RPD--PHI
LLI
PS RD-
-Y16-45
6
7
8 9 10 11 12 13
1
41
5
1
61719
18
2
0 2122232440
U-5839
MOUNTAINS EXPWY) TO US 23 BUS (N MAIN ST)
RUSS AVE - US 276 FROM US 23/74 (GREAT SMOKY
FOR THE NORTH CAROLINA DEPT. OF TRANSPORTATION
20 10 20 40
50 1002550
10 5 10 20
2021 26,650
2041 30,150
8
55
4
* TTST =1%DUAL 3%
URBAN ARTERIAL
STATEWIDE TIER
STEVE DRUM, PE
MICHAEL HOLT, PE
NCDOT CONTACT:
1.193 MilesTOTAL LENGTH TIP PROJECT U-5839 .........................
0.067 MilesLENGTH STRUCTURE TIP PROJECT U-5839 .................
1.126 MilesLENGTH ROADWAY TIP PROJECT U-5839 ..................TO LAKE J
UNALUSKAP.E.50230.1.1
STA. 23+69.90
BEGIN BRIDGE
STA. 25+44.37
END BRIDGE
STA. 30+55.00
BEGIN BRIDGE
STA. 32+35.00
END BRIDGE
DIVISION PROJECT ENGINEER-W MARSHALL ST--Y17--B OUNDAR Y ST --Y2A -
-L- POT STA. 10+19.45
BEGIN TIP PROJECT U-5839
-L- POC STA. 73+20.00
END TIP PROJECT U-5839
UPGRADE EXISTING SIGNAL
-HAZEL ST--Y4--WALNUT ST--Y5--BETSY ACRE LN-
-Y20-
JUNE 3, 2019
STRUCTURES, AND CULVERT
GRADING, DRAINAGE, PAVING, SIGNALS,
MAY 16, 2023
CONTROL OF ACCESS ON THIS PROJECT EXCEPT INTERCHANGES & U-TURN BULBS HAVE FULL CONTROL OF ACCESS
THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF THE TOWN OF WAYNESVILLE. THERE IS NO
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II
-WALNUT ST-
-L- US 276-RUSS AVE--L- US 276 US
7
4MOUNTAIN EXP
RES
S
WAYGREAT
S
MOKYWETLAND AND SURFACE WATER IMPACTS PERMIT
SHEET 1 OF 5
PERMIT DRAWING
SITE 1
50230.2.1 R/W, UTL.
Prepared in the Office of:
KENNETH McDOWELL, PE
50230.3.1 CONST.
CR
CR
CR
CR
CR
CR
CR
CRCRCRCR
CR
CR
CR
CR
CR
CR
CRCR
CR
CR
CR CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CRCRCR CR
CR
CR
CR
CR
CR
CR
CR
CR
CRCRCRCRCR
CRC
R CRCR
CR
CR
CR
CR
CR
CR
CR
CRCRCR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR CR
.003
.04
10.00’10.00’Industrial D
r.S.MainSt.
Mill
R
d.Cal
hounRd.Radi
oTowe
r
Rd.
Sunnyside
D
r.
CampSchaub
Rd.
Rd.
Hughes
Mauney
Cove
Rd.
Mauney
Golf
Course Rd.Carl
ArringtonRd.Mountain
Ln.
Happy
HillRd.Woodl
andDr.FelmetSt.2ndAve.1stAv e .
Test
Rd.
Reinertson
D r.
Howell
MillRd.
SouthernCorp.NorfolkSt.Stanly
SouthernCorp.Ratcliffe
Church Rd.
Maple Grove
Church Rd.
Phillips
Rd.
Hall
Top
Rd.Fairl
aneDr.
Chestnut
Park Rd.
Shingles
Cove Rd.
East
St.RacoonRacoonRd.Rd.SimsCir.
Sims
Rd.Circle%276
%276
%BUS
23
74
%BYP
23
%276
%276
%74
%BYP
23 %BUS
23
%19
Far
m%BUS
23
%
1192 1191
1193
1194
1190
1813
1818
1812
1809
1808
1810
1810
1811
1812
1809
1175
1177
1177
1244
1244
1181
1251
1185
1184
1186
1199
1198
1204
1201
1202
1202
1250
1188
1939
1193
1195
119211881189
1257
1187
1184
1196
1255
1256
1197
1197
1254
1204
1267
R uss A ve.
Russ Ave.
N Main St.Howell Mill Rd.
Pigeon St.
RICHLAND CREEK
RICHLAND CREEK
WAYNESVILLE
DI
12" RCP
18" RCP18" RCPCB
S
S
SS
S
36" CMP
24" CMP
24" CMP
1
5
" RCP
36" RCP18" CMP12" CMP8" PVCDRAINFRENCH
15" CMP
DI
15" CMP
CB SCONC.CONC.SCONC.
6’ WD
BOLLARD(4)
48" CONC
48" CONC
BST
6" CURB
6" CURB
30" C&G
30" C&G 30" C&G
BST
30" C&G
RET POND
CONC SPILLWAY
SIG
3’MTL RAIL
3’MTL RAIL
CONC
2S STUCCO BUS
WALL
RET
BLK
BST
CONC
CONC
BST
BST
BST
CONC
COLUMNSOTCB
S
S
S
S
S
S HHHE
XIS
TI
N
G
R/WEXISTING R/W
DB 899 PG 252
YOUNTS PROPERTIES, INC.
DB 455 PG 757
DI-CAROLINAS, LLC, A TEXAS LLC
DB 772 PG 2328
WILLIAM D. SCHULHOFER
DB 465 PG 2054
E. JAKE SCHULHOFER
WILLIAM D. SCHULHOFER AND
DB 286 PG 748
DB 357 PG 974
DB 270 PG 081
HARDEE’S RESTAURANTS LLC
DB 844 PG 517
KAREN D. WOOD
GEORGE T. WOOD AND WIFE,
D
B
772
P
G
2328
2
0
’
S
ANI
TARY
S
EWER EAS
EENT(CAB C-
1
7
9
0
)
EXISTING R/W (BY MAINTENANCE)
1SBK BUS
1SFG
(DIR. UNK.)
15" CMP
EIP
1SBR BUS
E
XIS
TI
N
G
R/WE
XIS
TI
N
G
R/WEXISTING R/W
A
T
E
X
A
S
L
L
C
DI-
C
A
R
O
LI
N
A
S,
L
L
C,
REVOCABLE TRUST
J R HOWARD
DB 944 PG 1724
BST
LEE ST
(BY MAINTENANCE)
EXISTING R/W
BST
BST
CONC
BST
CB
EIP
COLUMNS
COLUMNS
WATER VALVES
EXISTING R/W
EXISTING R/W
EIP100.00’ROGERS FAMILY HOLDINGS, LLC
DB 879 PG 715
EXISTING R/W
EIP
EIP
RFLP MOUNTAIN CREEK, LLC
DB 1045 PG 900
MAP CABINET D - PAGE 1508
DB 816 PG 1751 DB 816 PG 1756
MAP CABINET D - PAGE 1508
TOWN OF WAYNESVILLE11’11’11’11’11’5’5’5’5’11’11’11’11’11’E
XIS
T
E
XIS
T
100’ LEFT TURN TAPER
10’
GUARDRAIL
PROPOSED
10’ CONC. SIDEWALK& GUTTER2’-6" CURB5’-6" CONC. SIDEWALK
5’-6" CONC. SIDEWALK
2’-6" CURB & GUTTER
5’ CONC. SIDEWALK
2’-6" CURB & GUTTER
30’+70.00+70.00+90.00+90.00SIDEWALK10’ CONC..02
PROPOSED SHOP CURVED GUARDRAIL
60’ R
35’ R
150’ LEFT TURN STORAGE
150’ LEFT TURN STORAGE
2.5’ R
2.5’ R
6.5’6.5’TURN TAPER
100’ LEFT
5’ CONC. SIDEWALK
5’ BIKE LANE5’ BIKE LANE
CONC. SIDEWALK THRU RADIUS
TRANSITION FROM 10’ TO 5’
6’ TO 5’ S/W
TRANSITION
29.5’.02.02.025’
C
O
N
C. S/W
C
&G
TIE
T
O
E
X.+00.5443.25’+64.0047.25’+78.0043.25’+00.0047.25’+30.0025.50’
+70.1535.75’+24.1910’ R
30’ R
30’ R +96.00+41.76+70.39+63.19LANE
5’ BIKE
SHEET 2 OF 5
PERMIT DRAWING
STREAM & WETLAND IMPACTS
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S S SURFACE WATER
DENOTES IMPACTS IN
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.10/28/2022R:\Hydraulics\PERMITS_Environmental\Drawings\U5839_HYD_PRM_PSH_08.dgnDavid.Bocker8/17/99DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
NAD 83/95
8
MATCHLINE -L- STA. 34+75 SEE SHEET 9MATCHLINE -L- STA. 30+00 SEE SHEET 7U-5839
FOR -L- PROFILE SEE SHT. 27
formerly CALYX Engineers & Consultants
NC License # F-1333
P: 704.537.7300 www.NV5.com
CHARLOTTE, NC 28227
7500 E. INDEPENDENCE BLVD, STE 100
NV5 ENGINEERS & CONSULTANTS, INC.
CONCRETE SIDEWALK/MEDIAN
EFFECTS BOUNDARY
AREA OF POTENTIAL
PAVEMENT REMOVAL
FOR STRUCTURE PLANS SEE SHT. S2-1 THRU S2-4930-L--RUSS AVE-
TYPE-III
TYPE-III
GREU, TL-2
TL-2
GREU
CR
CR
CR
CR
F
F
F F
F
F
F
F
F
F
C C
F
F
C
F
F
F
F
F
F
F
F
F
C
FF
F
F
F
13
14
15
10
15
16
44
11B
11
RICHLAND CREEK
RICHLAND CREEK
SITE 1SITE 1
RETAIN
REMOVE
REMOVE
REMOVEREMOVEREMOVEREMOVE
REMOVE
REMOVEREMOVEREMOVEREMOVE
RETAIN
RETAINRETAIN
RETAIN
REMOVEREMOVE
REMOVEREMOVEREMOVE
REMOVE
RETAIN
REMOVE 180 LF AND RETAIN
JB w/MH
0803
0802
JB w/MH
CBCB
CB
CB
15" RCP-IV
15" RCP-IV
18" RCP-IV
24" RCP-IV
24" RCP-IV
36" RCP-IV
36" RCP-IV
36" RCP-IV
0804
0805
0806
0813
0816
0814 0815 0817
0808
0807
0809
0801
w/MH
JB
CB
0818 0819
EXTEND
AND
COLLAR
0820
( Not to Scale)
RIP RAP AT EMBANKMENT
10’min.
1.0’min.Ditch
Grade
-L- STA. 31+84 LT, 9 Tons CL-I, 12 SY Geotextile
-L- STA. 32+04 RT, 12 Tons CL-I, 17 SY Geotextile
DETAIL 8-A
1.5’
GEOTEXTILE
Type of Liner= CL-I, Rip-Rap
SEE DETAIL 8-A
RIPRAP AT EMBANKMENT
SEE DETAIL 8-A
RIPRAP AT EMBANKMENT
7 SY GEOTEXTILE
2 TONS
CL B RIP RAP
DI
15" RCP-IV
36" RCP-IV
36" RCP-IV
24" RCP-IV
18" RCP-IV
18" RCP-IV
18" RCP-IV
RCP-IV
36"
08220823
15" RCP-IV
SPECIAL CB SPECIAL CB SPECIAL CB
1-1/2" COVER (TYP.)
6"CLEAR
8" MIN.
9-3/4"
EXISTING UTILITY LINE
12" MINIMUM COVER OR AS SPECIFIED BY UTILITY COMPANY.
OFFSET CATCH BASIN EXISTING
UTILITY CONFLICT
STANDARD FRAME, GRATE AND HOOD
MANHOLE FRAME AND COVER
NOT TO SCALE
#4 REBAR @ 6" O.C. BOTH WAYS (TYP.).
PROPOSED SIDEWALK OR PLANTING STRIP
2" KEY MIN.
SLOPE 1"/FT.
OR FLOWABLE FILL
SELECT BACKFILL
SEE CATCH BASIN DETAIL
@ 6" O.C.
#4 REBAR DOWEL
SEE DETAIL
12"
24"
DOWEL DETAIL
1/2" CEMENT MORTAR TYP.
6" MIN.
SEE APPROPRIATE ROADWAY SECTION
NCDOT 840.66)
SEE STEP DETAIL (STD 20.12 OR
C/L1’-5INSIDE WALL1
2
/"
PIPE SIZE ALLOWABLE
SEE NCDOT DETAIL 840.01 FOR MAXIMUM 1.
:NOTES
8’ MAX.
SEE DETAIL 8-B SEE DETAIL 8-B
SPECIAL CB
15"15"DETAIL 8-A
OFFSET CATCH BASIN
DI
12" RCP
18" RCP18" RCPCB
S
S
SS
S
36" CMP
24" CMP
24" CMP
1
5
" RCP
36" RCP18" CMP12" CMP8" PVCDRAINFRENCH
15" CMP
DI
15" CMP
CB SCONC.CONC.SCONC.
6’ WD
BOLLARD(4)
48" CONC
48" CONC
BST
6" CURB
6" CURB
30" C&G
30" C&G 30" C&G
BST
30" C&G
RET POND
CONC SPILLWAY
SIG
3’MTL RAIL
3’MTL RAIL
CONC
2S STUCCO BUS
WALL
RET
BLK
BST
CONC
CONC
BST
BST
BST
CONC
COLUMNSOTCB
S
S
S
S
S
S HHHE
XIS
TI
N
G
R/WEXISTING R/W
DB 899 PG 252
YOUNTS PROPERTIES, INC.
DB 455 PG 757
DI-CAROLINAS, LLC, A TEXAS LLC
DB 772 PG 2328
WILLIAM D. SCHULHOFER
DB 465 PG 2054
E. JAKE SCHULHOFER
WILLIAM D. SCHULHOFER AND
DB 286 PG 748
DB 357 PG 974
DB 270 PG 081
HARDEE’S RESTAURANTS LLC
DB 844 PG 517
KAREN D. WOOD
GEORGE T. WOOD AND WIFE,
D
B
772
P
G
2328
2
0
’
S
ANI
TARY
S
EWER EAS
EENT(CAB C-
1
7
9
0
)
EXISTING R/W (BY MAINTENANCE)
1SBK BUS
1SFG
(DIR. UNK.)
15" CMP
EIP
1SBR BUS
E
XIS
TI
N
G
R/WE
XIS
TI
N
G
R/WEXISTING R/W
A
T
E
X
A
S
L
L
C
DI-
C
A
R
O
LI
N
A
S,
L
L
C,
REVOCABLE TRUST
J R HOWARD
DB 944 PG 1724
BST
LEE ST
(BY MAINTENANCE)
EXISTING R/W
BST
BST
CONC
BST
CB
EIP
COLUMNS
COLUMNS
WATER VALVES
EXISTING R/W
EXISTING R/W
EIP100.00’ROGERS FAMILY HOLDINGS, LLC
DB 879 PG 715
EXISTING R/W
EIP
EIP
RFLP MOUNTAIN CREEK, LLC
DB 1045 PG 900
MAP CABINET D - PAGE 1508
DB 816 PG 1751 DB 816 PG 1756
MAP CABINET D - PAGE 1508
TOWN OF WAYNESVILLE 2613 26132614261426162
6
16
2616
261626162616261726172617
261726172617261826182618261826182619261926192619261926212
6
2
1
2621
262126212622262226222622
26222622 26222622
2622
2622
2622262226232623262326232623262326232623 2623
2623262326232623262326242624262426242624
26242624
2624262426262626
2626262626262
6
2
6 26262626262626272627262726272627262726282628262826292629262926312632
26152
6
1
5
26152615
26152615
2615261526152615
2615262026202
6
2
0
2620
2620
26202620262026202625
2
6
2
5262526252625262526252625262526252625262526252625 2625262526252625262526252625262526252625
26252
6
2
5
262526252625
262526252625263026302630263011’11’11’11’11’5’5’5’5’11’11’11’11’11’E
XIS
T
E
XIS
T
100’ LEFT TURN TAPER
10’
GUARDRAIL
PROPOSED
10’ CONC. SIDEWALK& GUTTER2’-6" CURB5’-6" CONC. SIDEWALK
5’-6" CONC. SIDEWALK
2’-6" CURB & GUTTER
5’ CONC. SIDEWALK
2’-6" CURB & GUTTER
30’+70.00+70.00+90.00+90.00SIDEWALK10’ CONC..02
PROPOSED SHOP CURVED GUARDRAIL
60’ R
35’ R
150’ LEFT TURN STORAGE
150’ LEFT TURN STORAGE
2.5’ R
2.5’ R
6.5’6.5’TURN TAPER
100’ LEFT
5’ CONC. SIDEWALK
5’ BIKE LANE5’ BIKE LANE
CONC. SIDEWALK THRU RADIUS
TRANSITION FROM 10’ TO 5’
6’ TO 5’ S/W
TRANSITION
29.5’.02.02.025’
C
O
N
C. S/W
C
&G
TIE
T
O
E
X.+00.5443.25’+64.0047.25’+78.0043.25’+00.0047.25’+30.0025.50’
+70.1535.75’+24.1910’ R
30’ R
30’ R +96.00+41.76+70.39+63.19LANE
5’ BIKE
SHEET 3 OF 5
PERMIT DRAWING
STREAM & WETLAND IMPACTS
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
S S SURFACE WATER
DENOTES IMPACTS IN
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.10/28/2022R:\Hydraulics\PERMITS_Environmental\Drawings\U5839_HYD_PRM_PSH_08_Cont.dgnDavid.Bocker8/17/99DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
NAD 83/95
8
MATCHLINE -L- STA. 34+75 SEE SHEET 9MATCHLINE -L- STA. 30+00 SEE SHEET 7U-5839
FOR -L- PROFILE SEE SHT. 27
formerly CALYX Engineers & Consultants
NC License # F-1333
P: 704.537.7300 www.NV5.com
CHARLOTTE, NC 28227
7500 E. INDEPENDENCE BLVD, STE 100
NV5 ENGINEERS & CONSULTANTS, INC.
CONCRETE SIDEWALK/MEDIAN
EFFECTS BOUNDARY
AREA OF POTENTIAL
PAVEMENT REMOVAL
FOR STRUCTURE PLANS SEE SHT. S2-1 THRU S2-4930-L--RUSS AVE-
TYPE-III
TYPE-III
GREU, TL-2
TL-2
GREU
CR
CR
CR
CR
F
F
F F
F
F
F
F
F
F
C C
F
F
C
F
F
F
F
F
F
F
F
F
C
FF
F
F
F
13
14
15
10
15
16
44
11B
11
RICHLAND CREEK
RICHLAND CREEK
SITE 1SITE 1
RETAIN
REMOVE
REMOVE
REMOVEREMOVEREMOVEREMOVE
REMOVE
REMOVEREMOVEREMOVEREMOVE
RETAIN
RETAINRETAIN
RETAIN
REMOVEREMOVE
REMOVEREMOVEREMOVE
REMOVE
RETAIN
REMOVE 180 LF AND RETAIN
JB w/MH
0803
0802
JB w/MH
CBCB
CB
CB
15" RCP-IV
15" RCP-IV
18" RCP-IV
24" RCP-IV
24" RCP-IV
36" RCP-IV
36" RCP-IV
36" RCP-IV
0804
0805
0806
0813
0816
0814 0815 0817
0808
0807
0809
0801
w/MH
JB
CB
0818 0819
EXTEND
AND
COLLAR
0820
( Not to Scale)
RIP RAP AT EMBANKMENT
10’min.
1.0’min.Ditch
Grade
-L- STA. 31+84 LT, 9 Tons CL-I, 12 SY Geotextile
-L- STA. 32+04 RT, 12 Tons CL-I, 17 SY Geotextile
DETAIL 8-A
1.5’
GEOTEXTILE
Type of Liner= CL-I, Rip-Rap
SEE DETAIL 8-A
RIPRAP AT EMBANKMENT
SEE DETAIL 8-A
RIPRAP AT EMBANKMENT
7 SY GEOTEXTILE
2 TONS
CL B RIP RAP
DI
15" RCP-IV
36" RCP-IV
36" RCP-IV
24" RCP-IV
18" RCP-IV
18" RCP-IV
18" RCP-IV
RCP-IV
36"
08220823
15" RCP-IV
SPECIAL CB SPECIAL CB SPECIAL CB
1-1/2" COVER (TYP.)
6"CLEAR
8" MIN.
9-3/4"
EXISTING UTILITY LINE
12" MINIMUM COVER OR AS SPECIFIED BY UTILITY COMPANY.
OFFSET CATCH BASIN EXISTING
UTILITY CONFLICT
STANDARD FRAME, GRATE AND HOOD
MANHOLE FRAME AND COVER
NOT TO SCALE
#4 REBAR @ 6" O.C. BOTH WAYS (TYP.).
PROPOSED SIDEWALK OR PLANTING STRIP
2" KEY MIN.
SLOPE 1"/FT.
OR FLOWABLE FILL
SELECT BACKFILL
SEE CATCH BASIN DETAIL
@ 6" O.C.
#4 REBAR DOWEL
SEE DETAIL
12"
24"
DOWEL DETAIL
1/2" CEMENT MORTAR TYP.
6" MIN.
SEE APPROPRIATE ROADWAY SECTION
NCDOT 840.66)
SEE STEP DETAIL (STD 20.12 OR
C/L1’-5INSIDE WALL1
2
/"
PIPE SIZE ALLOWABLE
SEE NCDOT DETAIL 840.01 FOR MAXIMUM 1.
:NOTES
8’ MAX.
SEE DETAIL 8-B SEE DETAIL 8-B
SPECIAL CB
15"15"DETAIL 8-A
OFFSET CATCH BASIN
SHEET 4 OF 5
PERMIT DRAWING
28+00 29+00 30+00 31+00 32+00 33+00 34+00
PROFILE ALONG ROADWAY
2630
2600
2620
2610
BRIDGE
REMOVE EXISTING
CENTER LINE
PROFILE ALONG
STEEL = 2620.68’
PROP. LOWEST LOW
(+)0.3031%
(-)6
.0784%
ELEV. = 2626.7’
PROP. 100 YR
(-)0.4661%
K = 94
VC = 526’
EL = 2,627.41
PI = 30+02.00
KEYED 3.5 FT DEEP
CLASS ’II’ RIP RAP
1.5:1 SLOPE
1.5:1 SLOPE
KEYED 3.5 FT DEEP
CLASS ’II’ RIP RAP
DOWNSTREAM
NATURAL GROUND
UPSTREAM
NATURAL GROUND
3@60’ SPANS
45" PSCG BRIDGE
SKEW = 90
G.P. ELEV. 2627.51
-L- STA 31+45.00
EXISTING ROADWAY GRADE
K = 216
VC = 166’
EL = 2,625.76
PI = 33+56.00
PROPOSED ROADWAY GRADE
(8-4-2016)
SURVEY = 2614.7
WS ON DATE OF
RECENT DRIFT = 2615.7
4.0’ DEEP CAP
DDE = 490 CY
EXCAVATE BERM TO EL. 58.8’
0.5%
0.5%
TO -L- STA. 35+21
FLOODPLAIN LIMITS EXTEND
TO -L- STA. 35+21
FLOODPLAIN LIMITS EXTEND
TO -L- STA. 30+65
FLOODPLAIN LIMITS EXTEND
DDE = 280 CY
EXCAVATE BERM TO EL. 58.8’
ELEV. = 2625.4’
PROP. 50 YR
SCOUR PROFILE
100 YR THEORETICAL
SCOUR PROFILE
500 YR THEORETICAL
DEVELOPED/BUSINESS.
COBBLES. FLOODPLAIN IS WOODED &
BED MATERIAL IS ROCKY W/ LARGE
BANKS ABOVE NWS; STABLE BANKS.
CHANNEL IS 30-55 FT. WIDE W/ 4’-5’ HIGH
STREAM NOTE:
SITE 1
-L- STA 31+45 3@60’ SPANS
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.10/28/2022R:\Hydraulics\PERMITS_Environmental\Drawings\U5839_HYD_PRM_Richland_Creek.dgnDavid.Bocker8/17/99DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
8
MATCHLINE -L- STA. 34+75 SEE SHEET 9MATCHLINE -L- STA. 30+00 SEE SHEET 7U-5839
FOR -L- PROFILE SEE SHT. 27
formerly CALYX Engineers & Consultants
NC License # F-1333
P: 704.537.7300 www.NV5.com
CHARLOTTE, NC 28227
7500 E. INDEPENDENCE BLVD, STE 100
NV5 ENGINEERS & CONSULTANTS, INC.
CONCRETE SIDEWALK/MEDIAN
EFFECTS BOUNDARY
AREA OF POTENTIAL
PAVEMENT REMOVAL
FOR STRUCTURE PLANS SEE SHT. S2-1 THRU S2-49
Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)1 -L- 31+07/31+95 3@60', 45' Girder Bridge 0.02 0.50 118 128 TOTALS*: 0.02 0.50 118 128 0*Rounded totals are sum of actual impactsNOTES:Revised 2018 Feb SHEET 5OF 5 WETLAND AND SURACE WATER IMPACTS SUMMARYWETLAND IMPACTSSURFACE WATER IMPACTSHAYWOODU-5839 NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS10/28/2022