Loading...
HomeMy WebLinkAboutBells Bridge Credit Release Request Form Task 1 2 3 11.3.2022Restoration Systems, LLC 1101 Haynes St. Suite 211 Raleigh, North Carolina Ph: (919) 755-9490 Fx: (919) 755-9492 11/3/2022 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Barrett Jenkins, bienkins&restorationsystems.com, 512.230.0424 Through: RESTORATION SYSTEMS, LLC We formally request a credit release for the Bells Bridge Nutrient Offset Site (2020-1937v3) for completion of Task 1, 2, and 3 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Tasks 1, 2, and 3: conservation easement, survey, asbuilt memo, monitoring financial assurances, and asbuilt report. Credits requested for release are detailed below: Credit Type % Release Credit Amount include Units Notes/Comments Buffer Restoration Buffer Preservation Buffer Enhancement Generated Nitrogen Nutrient Offset 50% 40,668.93 lbs Asbuilt credits diff from approved BPDP credit table Delivered Nitrogen Nutrient Offset Jordan sites only) Generated Phosphorus Nutrient Offset 50% 2,619.39 lbs Asbuilt credits diff from approved BPDP credit table Delivered Phosphorus Nutrient Offset Jordan sites only Signature: Attachments: 1) Approved Project Credit Table from BPDP (Updated credit table in asbuilt report not yet approved), 2) Approved Credit Release Schedule, 3) Asbuilt Credit Table (not yet approved) a -! !!/ \z // } j( EE EE & \\�aa as §&k }!k (!t { ) E6 )E § § k �k as \ § ]!I y | \ /_ \/) \ ] i §¥ _ ■)® _2 22 ; 22 f # # � u 2!! k k uko § E -- -- E a)0U \ \ § ; � »(\z » N, ±�|!JJ \ : \ ! & �co ��� -- -- m « ) � ) tA � „ „ m 6 2 -- -- � \ } i/2aaa _ �! §�© )! § ƒ tz § t� (§;£0-a ! � 2 | J. z 2 ■)§ §3vg;2e)-.. =wk �jk A VIII. CREDIT RELEASE SCHEDULE FOR EACH BANK PARCEL A. Upon submittal of all appropriate documentation by the Sponsor, and subsequent approval by DWR, it is agreed that Nutrient Offset Credits associated with each Bank Parcel will become available to sell to a third parry in accordance with the Credit Release Schedule in Table 3.0. Table 3.0 - Credit Release Schedule for Nutrient Offset Credits % Credit Task Project Milestone Available for Sale I Instrument and BPDP Approved by DWR, Conservation Easement 20 Recorded*, Financial Assurance Posted All Riparian Earthwork, Planting and Installation of Monitoring Devices 2 Completed, Easement Boundaries are marked, and all applicable permits 20 obtained. A site visit by DWR is required for this task. 3 Monitoring Financial Assurance Posted and Approval of As -Built Report 10 4 Monitoring Report #1: Approved by the DWR** & financial assurance 10 renewed 5 Monitoring Report #2: Approved by the DWR** & financial assurance 10 renewed 6 Monitoring Report #3: Approved by the DWR** & financial assurance 10 renewed 7 Item B (1) of Section X in this Instrument has been completed and approved 5 by DWR. No remaining credits will be released until the conservation easement has been assigned to an approved land trust or stewardship 8 Monitoring Report #4: Approved by the DWR** & financial assurance 5 renewed 9 Monitoring Report #5: Approved by the DWR** and final site visit by DWR 10 has been conducted Total 100% For specification, please see Section V in this Instrument * * DWR Approval provided upon a determination that the site is meeting success criteria contained within the approved BPDP B. DWR may modify the credit release schedule based on the information submitted or the order in which required information is received. DWR will notify the Sponsor of any modification to the credit release schedule. C. Any major deviations to the Bank Parcels that were not authorized in writing by DWR prior to implementation may affect the amount of nutrient offset credits that will be generated by the Bank Parcels. IZ )�4o6 j /� »J \\ « \( 33 33 a § \/§aa as a Q )2\ go uM )!; kkk _ ]/co 0 �}w (( ££ lo _ o _v )) % f ! lo !§§ ) ƒ�2 ) )k% aso a \\aa \�N ) )) )) ) \ // // / / ci )!) § o o q »- � 7= %\_:__§\ } § (; )2 �22W.2Z0 _ #§!§)\9 �tb$ ] §2�§�76 § o