Loading...
HomeMy WebLinkAbout20141288 Ver 1_CAMA Application_20141210...,�.. F-IMA 2 0 1 4 1 2 8 8 MCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor December 9, 2014 Division of Coastal Management MEMORANDUM TO Karen Higgins 401 Oversight DEMLR - Surface Water Protection John E Skvarla, III Secretary R F=@P=016A -1 DEC 1 0 2014 DENR - WATER RESOURCES FROM Jonathan Howell, NC DENR -DCM Assistant Major Permits Coordinator 400 Commerce Avenue, Morehead City, NC 28557 (Courier 11- 12 -09) SUBJECT CAMA / Dredge & Fill Application Review Applicant: James L. Ratcliff 111 Project Location: 20 Pelican Dr, adjacent to Lee's Cut, in Wrightsville Beach, New Hanover County Proposed Project: replacement of an existing bulkhead 6a&lc I � J/e 111e�17 15, Please indicate below your agency's position or viewpoint on the proposed project and return this form to Jonathan Howell at the address above by January 2, 1015. If you have any questions regarding the proposed project, contact Robb Mairs at (910)796 -7423 when appropriate, in depth comments with supporting data is requested REPLY: This agency has no objection to the project as proposed SIGNED This agency has no comment on the proposed project This agency approves of the project only if the recommended changes are incorporated See attached This agency objects to the project for reasons described in the attached comments DATE N C Division of Coastal Management 127 Cardinal Drive Ext , Wilmington, NC 28405 Phone 910 - 796 -7215 \ FAX 910 - 395 -3964 Internet www nccoastalmanagement net An Equal Opportunity \ Affirmative Action Employer DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME James L Ratcliff III 2 LOCATION OF PROJECT SITE 20 Pelican Dr, adjacent to Lee's Cut, in the Town of Wrightsville Beach, New Hanover County Photo Index — 2006: 24 -7411 T, 6 2000: 24 -308 D, 18 1978 17 -1057 H, 23 State Plane Coordinates - X 2363103 Y 172845 Lat.: 34 °13'8 34 "N Long.: 77 °47'54 60 "W 3 INVESTIGATION TYPE CAMA/D &F ROVER FILE: N/A 4 INVESTIGATIVE PROCEDURE Dates of Site Visit — 12/03/2014 Was Applicant Present — No 5 PROCESSING PROCEDURE Application Received — 12/01/2014 (completed) Office — Wilmington 6 SITE DESCRIPTION (A) Local Land Use Plan — Town of Wrightsville Beach Land Classification From LUP - Developed (Upland), Conservation (Open Water) (B) AEC(s) Involved PT, EW, ES (C) Water Dependent Yes (D) Intended Use Private (E) Wastewater Treatment: Existing — Municipal Planned — N/A (F) Type of Structures Existing — Single- family residence (Duplex), sloping concrete bulkhead, fixed platform, floating docks, boatlift and mooring pilings Planned — New timber bulkhead with backfill, extend left floating dock, and add gazebo over existing fixed platform (G) Estimated Annual Rate of Erosion N/A Source - N/A 7 HABITAT DESCRIPTION [AREA] DREDGFD FILLED OTHER (A) Vegetated Wetlands (B) Non - Vegetated Wetlands (O en water) 312 sq ft 96 sq ft (C) Other (Highground) 930 sq ft (D) Total Area Disturbed 1,338 sq ft (0 031 acres) (E) Primary Nursery Area No (F) Water Classification SB# Open No 8 PROJECT SUMMARY The applicant proposes to install a new timber bulkhead in front of an existing sloping concrete bulkhead, extend an existing floating dock, add a gazebo covering the existing platform within Lee's Cut James L. Ratcliff III Page 2 PROJECT DESCRIPTION: The project site is located at 20 Pelican Drive, adjacent to Lee's Cut, adjacent to Greenville Sound in the Town of Wrightsville Beach, New Hanover County To locate the property from the Wilmington Regional Office (WiRO) travel east on Eastwood Road approximately 3 miles towards Wrightsville Beach From the AIW W drawbridge, continue to travel east on West Salisbury Street (US HWY 74) for approximately one mile Turn left onto Pelican Drive and travel east The property of interest will be located on the left The property is approximately 0 2 acres with an elevation of approximately 6' above normal high water (NHW) There is approximately 62' of shoreline frontage along Lee's Cut, which is currently stabilized by an old sloping concrete bulkhead with asbestos sheeting located at the toe of the existing concrete bulkhead The NHW boundary was observed approximately 5' landward of the toe of the existing concrete bulkhead This type of bulkhead is also located along the adjacent riparian property to the west The applicant recently purchased the property and currently maintains a two - story single family residence (Duplex) on the property Upland vegetation consists of maintained lawn grass and ornamental landscaping There are currently no Coastal Wetlands on the property The applicant currently maintains a private docking facility in Lee's Cut An existing platform, measuring approximately 12' in length by 30' in width extends waterward over the existing sloping concrete bulkhead, in a northerly direction towards Lee's Cut Extending from the northern side of the existing platform are two (2) existing floating docks running perpendicular to the shoreline, the first measuring approximately 32' in length by 6' in width on the eastern end of the existing platform and the second, measuring approximately 16' in length by 6' in width on the western end of the existing platform There are four (4) existing mooring pilings which are located on the waterward side of the floating dock There is also one boatlift measuring approximately 13' in length by 13' in width on the eastern side of the eastern floating dock The existing docking facility currently accommodates up to six (6) vessels and it appears through aerial photography review that the existing sloping concrete bulkhead was built prior to the CAMA regulations (See Sheets 1 through 3 of 3 and Project Narrative) The Wrightsville Beach Land Use Plan classifies adjacent waters as Conservation, and the adjacent high ground portion of the project area as Developed The waters of Lee's Cut, in Greenville Sound are classified as SB #, by the NC Division of Water Quality These waters are NOT designated as Primary Nursery Area (PNA), by the NC Division of Marine Fisheries and they are CLOSED to the harvest of shellfish PROPOSED PROJECT: The applicant proposes to install a new timber bulkhead in front of an existing sloping concrete bulkhead, extend an existing floating dock, add a gazebo covering the existing platform within Lee's Cut A new approximately 62 linear foot timber bulkhead would be constructed along the water ward toe of the existing sloping concrete bulkhead to encapsulate the asbestos at the toe of the existing bulkhead The new bulkhead would be located approximately 5' below the NHW boundary, aforementioned and the area behind the bulkhead would be encapsulated with clean sand fill with the associated tie -back anchor system The proposed new bulkhead would cross the property boundary to tie into the existing timber bulkhead located to the east The proposed new bulkhead would cross the property line approximately 1' to 2' to tie into the adjacent bulkhead to the east The applicant has received a letter of no objection from the adjacent riparian property owner to the east as well The application states the existing platform would be reconstructed within the same footprint A new gazebo covering a portion of the existing platform is also proposed and would be constructed on the eastern end of the existing platform, measuring approximately 12' in length by 12' in width The application also states a new extension of the existing western floating dock would be constructed, measuring approximately 16' in length by 6' in width and would extend from the waterward end of this floating dock and oriented towards the north creating an approximately 32' in length by 6' in width floating dock to match the existing eastern floating dock The application states that the existing water depths at the location of the proposed and existing structures range from approximately -4' to -7' at normal low water (NLW) The proposed new docking facility configuration would potentially provide docking space for eight (8) vessels at this location (See Sheets 1 through 3 of 3 and Project Narrative) James L. Rateliff III Page 3 10. ANTICIPATED IMPACTS: The proposed new timber bulkhead would incorporate 312 sq ft of Public Trust Area and Estuarine Waters, which has been essentially usurped by the existing sloped concrete bulkhead and asbestos Approximately 930 sq ft of Estuarine Shoreline would be impacted for the tie -back anchor system The proposed new bulkhead would cross the property line to tie into the adjacent bulkhead to the east As stated, the applicant has received a letter of no objection from the adjacent riparian property owner to the east as well The extension of the existing floating dock would incorporate an additional 96 sq ft of Public Trust Area and Estuarine Waters and would not encroach into the 15' riparian corridor setback requirement of the adjacent riparian properties The proposed structures would extend approximately 60' mto a waterbody, which measures approximately 400' across. This distance appears to conform to the 1/4 width rule and would not exceed the established Town of Wrightsville Beach pier head line The proposed structures would accommodate up to eight (8) vessels at this location within current water depths ranging from approximately 4' to -7' @ NLW Minor increases in turbidity should be expected during the construction phase of the project, however, turbidity levels should return to normal once the project is complete Submitted by Robb L. Mairs Date 12/09/2014 Office Wilmington P0,) q :�- T The existing bulkhead at 20 Pelican is constructed of concrete and a corrugated material suspect of having asbestos. I propose going behind the existing bulkhead and constructing a new bulkhead of treated wood, not to disturb the asbestos and once constructed backfill with clean sand to encapsulate the suspect asbestos material. This new bulkhead will tie into the bulkhead on each side of 20 Pelican. In order to build the new bulkhead, the front part of the platform closest to the bulkhead will have be deconstructed along with the front 5 pilings holding it up. Once the new bulkhead is complete, the platform would be reconstructed to come back to the new bulkhead. The platform size would remain the same size as it is now 1200. I would like to build a cabana top over the right side of the platform, measuring 12x12. I propose to replace all decking boards and railings on the existing platform and replace both ramps with aluminum 3x 16 ramps which are the same size. I also propose extending the left side floating dock 16 ft to match the right side. Lastly, I propose removing 4 excess pilings surrounding the existing dock. Thanks for your consideration in this matter. If you have any questions, please call me at 910-367-0189. Jim Ratcliff RECEIVED uCM WlLM1NGTON, NC oJEc 1 2014 new mr-1 APPLICATION for 7 mamer Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 0 ihddwndir-ln 6riftbu Business Name Project Name (if applicable) Jb CA )a f" Applicant 1 First Name Ml Last Name OL '% es C. Applicant 2 First Name Ml Last Name If additional applicants, please attach an additional page(s) with names listed Mailing Address /1/� CA4,VAIJ k'A PO Box City State -102 ZIP Country 4 Phone No /2 L 0 - 367 - W I ext FAX No -T� Street Address different from above) A0 ve'LICA A& R City State ZIP Y-41 910 Email Last Name a D C Mi WILANfiINGTON, NO, <Form continues on back> DEC, 0 ^6 .252 -808 2 8 0 3 i-888-4RCOAST * 'Alwim "Iccoastalmanagement net Business Name Agent/ Contractor 1 rst Name Ml Last Name Agent/ Contractor 2 First Name Ml Last Name Mailing Address PO Box City State ZIP Pho ne No 1 Phone No 2 VIC - q �3qrxt ext FAX No Contractor Street Address (if different from above) City State ZIP Email RECEIVED D C Mi WILANfiINGTON, NO, <Form continues on back> DEC, 0 ^6 .252 -808 2 8 0 3 i-888-4RCOAST * 'Alwim "Iccoastalmanagement net Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit - Pr'ojecf= Location` - L—.5 - _ _ _ -S F� _ __ _ _ - =4 -.. -- _ p'..r_ { 1 _ _ _ W _ _ _ _ i " —_ _ :.� -�i_ - _ County (can be multiple) Street Address State Rd # 0 yee- A0 L I c A 1v d Approximate elevation of tract above NSW (normal high water) or Subdivision Name City Staa�te% Zip Phone No Lot No (s) (if many, attach additional page with list) - 1�� ext f Man -made features and uses now on tract / -�%rrn � {�'•1 S f �/i> �? �.e' fj lG';�le''� -� J a In which NC river basin is the project t located? b Name of body of water nearest to proposed project : }' �'Llii/ i_ee S �� z, r c Is the water identified in (b) above, natural or manmade? d Name the closest major water body to thee Sroposed-pr ct site ❑ Natural Manmade ❑Unknown / ed w ork within city limits or planning jurisdiction? f If applicable, list the planning jurisdiction or city limit the proposed EF_eps ❑No work falls within 14/ &2.1 ,-4 k Has a professional archaeological assessment been done for the tract? If yes, attach a copy ❑Yes ❑No 011A If yes, by whom? 4 ,_ Sits ®escoption. - J.- if x s3v• 1'^ - L—.5 - _ _ _ -S F� _ __ _ _ - =4 -.. -- _ p'..r_ { 1 _ _ _ W _ _ _ _ i " —_ _ :.� -�i_ - _ a Total length of shoreline on the tract (ft ) b Size of entire tract (sq ft) 6 Z �3 ;/ , -T c Size of individual lot(s) d Approximate elevation of tract above NSW (normal high water) or a NWL (normal water ZHW .- (If many lot sizes, please attach additional page with a list) or ❑N WL e Vegetation on tract Ile }� G 5 f Man -made features and uses now on tract / -�%rrn � {�'•1 S f �/i> �? �.e' fj lG';�le''� -� J �/ r'" Jtr _ /= / i'rf�'.� �- �� �, I.a. g Identify and describe the existing land uses adjacent to the proposed project site R P. i Cif le, A \ CX, - h How does local government zone the tract? i Is the proposed project consistent with the applicable zoning? / (Attach zoning compliance certificate, it applicable) es []No ❑NA r j Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes [2fq6- k Has a professional archaeological assessment been done for the tract? If yes, attach a copy ❑Yes ❑No 011A If yes, by whom? I Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ❑No VA National Register listed or eligible property? <Form continues on next page> DCM WILMINGTON, �G,TON, NC �. c 0 1 201 257 808 -2806 1- 888- 4RCOASI vrrvJW 41CCOasta;i,:anagament net ,;,Ick I Form DCM MP -1 (Page 3 of 4) m (i) Are there wetlands on the site? (ii) Are there coastal wetlands on the site? (m) If yes to either (i) or (u) above, has a delineation been conducted? (Attach documentation, if available) n Describe existing wastewater treatment facilities C, IiY o Describe existing drinking water supply source p Describe existing storm water management or treatment s stems APPLICATION for Major Development Permit []Yes ZNo ❑Yes IJNo []Yes to 5; ``Act�irifies =arid #ft0acfs - a Will th pro Act be for comm aal, ublic, yr pri ate use? S� ❑C mercial ❑Public /Government Private /Community �aaVE �+1C� ZED �i/Z Zvi �. N� �t� '*; '. vv b Give a brief description of purpose, use, Mid daily operations of the project when` omplete �J beg L101'10%a OJ ire /0� () aav eklls /A Aoo; C AQ- / P, v/aia I/ Ze c Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored % ase jt� k? &I�Ae4d, , � � ,� *@./ Act 6A d z� back :1y em back-�, 11, L`-'c*ru;PAie-t/f C d List all development activities you propose e Are the proposed activities maintenance of an existing project, new work, or both?' =1 %'�✓ f What is the approximate total disturbed land area resulting from the proposed project? ❑Sq Ft or ❑Acres 1U g Will the proposed project encroach on any public easement, public accessway or other area ❑Yes o ❑NA that the public has established use of? h Describe location and type of existing and proposed discharges to waters of the state i Will wastewater or stormwater be discharged into a wetland? ❑Yes ❑No ® A If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes []No ❑NA I Is there any mitigation proposed? ❑Yes ❑No E9KA If yes, attach a mitigation proposal H L.i,s1--6%'?' m DCM VAJILN1iNG i 0Ida, NC NE C 0 12014 <Form continues on back> F 31�IS 1;1F.2 540813818 1- 688 -4RCi ASI w l-vv CO — %t11 "nail aUS -MP'It 132-�t Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6: Additionallnformafior► �SF�a Cr addRr6if -fri this mp /eted_applrcatron four; (A iP l tfie ff911oTij9_1dems-be16W i applrcab /e,.musJ be submrtferf rn orderf6r tP-e app icatt9rf= = package to be comp/e>e_Ttteemsyj'a) (fj are= a(waysaapp�ca le to.any majpr deve/opmerrt application Please consulk the`appficaUon -F-: _ Instai6tron booklet on'how to properly prepare thie required riems pe/ow a A p j`ect- narrative «i y="' -z 5 b An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale Please give the present status of the proposed project Is any portion already complete9 if previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed c A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site d'73 'A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties e The appropriate application fee Check or money order made payable to DENR °� 1 f A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mad Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management Nam Phone No Addre '__ - Name RCS Phone No Address Aa kl'1 e.&ar (Aru, 1 a i0c -,Phonef�o. _ �cA:Lr =S =,r Address ,rr�:1`t Z: ° t o * �% i 7 _ ti g A list of previous state or federal permits issued for work on the project tract Include permit numbers, permittee, and issuing dates A/ h Signed consultant or agent authorization form, if applicable Wetland delineation, if necessary A111 I A signed AEC hazard notice for projects in oceanfront and inlet areas (Must be signed by property owner) ' s k A statement of compliance with the N C Environmental Policy Act (N C G 5 113A 1 -10), if necessary If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act 7:==Getf ficaffiorr nd-Nail' jiw,an° :anal _ _ i _. _ -- _ -_ ='� I understand that any permit Issued In response to this application will allow only the development described In the application The project will be subject to the conditions and restrictions contained In the permit I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating Information related to this permit application and follow -up monitoring of the project I further certify tha the In ormation provided In this application Is truthful to t e best of my knowledge ­Date P 1 °-Z +A a ' - ' �T -� Pnnt;Name-r � :=�) � ,M �.�, iR �'. ►'1` Signature: Pl_ease-tndlcate application attachments pertaining to your proposed project [DCM MP -2 Excavation and FIII Information []DCM MP -5 Bridges and Culverts ❑D�,M MP -3 Upland Development CM MP -4 Structures Information RECEIVED DCM WILMINGTON, NO D ;L: C ti 1 2014 `S2 -13ft8 -2808 1- 888.4RCOASa „vv v ricco33,alma, ageravr,t.ra't Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Mayor Permit, Form DCM MP -1 Be sure to complete all other sections of the Joint Application that relate to this proposed project Please include all supplemental information Describe below the purpose of proposed excavation and /or fill activities. All values should be given in feet Access Other Channel Rock (excluding (NLW or Canal Boat Basin Boat Ramp Rock Groin Breakwater shoreline N W L) stabilization) Length Width Avg. Existing Depth Final Project Depth a Amount of material to be excavated from below NHW or NWL in cubic yards c (i) Does the area to be excavated include coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected ❑CW ❑SAV ❑SB ❑WL []None (u) Describe the purpose of the excavation in these areas a Location of disposal area c (i) Do you claim title to disposal area? ❑Yes ❑No ❑NA (u) If no, attach a letter granting permission from the owner e (i) Does the disposal area include any coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected [-]CW ❑SAV ❑SB ❑WL ❑None (u) Describe the purpose of disposal in these areas b Type of material to be excavated d High- ground excavation in cubic yards Dimensions of disposal area d (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA (u) If yes, where? f (i) Does the disposal include any area in the water? ❑Yes []No ❑NA (u) If yes, how much water area is affected? •se�v_onQ_�ssarna .. 7_gasesa_.rma+nanc� ., ,a.aenu no- rnzm+rkimanaaaprnent.net revised: 12/26/00 Form DCM MP-2 (Excavation and Fill, Prigs 2 of 2) a Typ of shoreline stabilization [((Bulkhead ❑Riprap ❑Breakwater /Sill ❑Other c Average distance waterward of NHW or NWL e Type of stabilization material t, AA&a e . g Number of square feet of fill to be placed below water level 3tJ Bulkhead backfdl 'aja Riprap Breakwater /Sill Other I Source of fill material b Length (Od,- Width V d Maximum distance waterward of NHW or NWL S -'/1 141 f (i) Has there been shoreline erosion during preceding 12 V hs? s ❑No ❑NA (u) If yes, state amount of erosion and source of erosion amount information h Type of fill material yea A! - C, c ���xcud���S Q►'g'`�� tabifrzatiort�� r �w �Y skr� �. ,�:�.,���..�.�'�; � �� =��.:fi r��- �n`���� ,� � ��;�- � �, �3j a (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA b (i) Will fill material be placed in coastal wetlands /marsh (CW), If yes, (u) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill submerged aquatic vegetation (SAV), shell bottom (Sts), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected ❑CW ❑SAV EISB ❑WL ❑None (n) Describe the purpose of the fill in these areas a How will excavated or fill material be kept on site and erosion b What type of construction equipment will be used (e g, dragline, controlled? I A � backhoe, or hydraulic dredge)? tt;r LA, A.1U la c (i) Will naviggateaids be required as a result of the project? ❑Yes [jj o RNA (n) if yes, explain what type and how they will be implemented d (i) Will wetlands be crqped in transporting equipment to project site? ❑Yes KKo ETNA (u) If yes, explain steps that will be taken to avoid or minimize environmental impacts 252 -808 -2808 -: 1- 888- 4RCOAS'T :: www nCCO2s43lmanagement.net revised- 92/26/06 (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Mayor Permit, Form DCM MP -1 Be sure to complete all other sections of the Joint Application that relate to this proposed project Please include all supplemental information a^ i � ��` w< �'F.,.,.k «✓ a, `�:s �t�'�.�` a, a„n:�� � s � yr ^�'�'c" Det`"x x" G i ��i�C�I�G��CIL!-, � �R %d��� .i����'�2 /���CS,�:ti��;..�`�. ;3� z��x�.�wt�� =����- 4�;✓; G7Thr��sectro ,'��"�;otapplicabfe` -' a (i) Is the docking facility /manna b (Q Will the facil be open to the general public? ❑Commercial ❑Publlc/Government - nvate /Community ❑Yes No i Check the proposed type of siting j Describe the typical boats to be served (e g , open runabout, ❑ Land cut and access channel charter boats, sail boats, mixed types) ❑O water, dredging for basin and /or channel l pen water, no dredging required ❑Other, please describe k Typical boat length "�� I (i) Will the facihty open to the general public? ❑Yes o m (i) Will the facilit ve tie pilings? RECEIVED ❑Yes o (u) If yes number of tie pilings ?WILMINGTON, �f DEC 0 1201114 252 - 808 -2808 s: 1- 888- 4RCOAST ,> www nccoastaimanaggMe .n et remised; 12/27/06 c (i) Dock(s) and /or pier(s) d (i) Are Finger Piers included? ❑Yes I�No (u) Number If yes (in) Length (u) Number (iv) Width (w) Length (v) Floating ❑Yes ONO (iv) Width (v) Floating ❑Yes ❑No No e (i) Are Platforms included? es ❑No f (i) Are Boatlifts included? ❑Yes If yes If yes (u) Number (u) Number (w) Length (w) Length (iv) Width 2� _ (iv) Width (v) Floating es ❑No Note Roofej areas are calculated from drnpline dimensions g (i) Number of slips proposed h Check all the types of services to be provided 2 ❑ Full service, including travel lift and /or rail, repair or maintenance service (u) umber of slips existing ❑ ckage, fuel, and marine supplies "wet ") of slips Dockage ( slips only, number ❑ Dry storage, number of boats ❑ Boat ramp(s), number of boat ramps ❑ Other, please describe i Check the proposed type of siting j Describe the typical boats to be served (e g , open runabout, ❑ Land cut and access channel charter boats, sail boats, mixed types) ❑O water, dredging for basin and /or channel l pen water, no dredging required ❑Other, please describe k Typical boat length "�� I (i) Will the facihty open to the general public? ❑Yes o m (i) Will the facilit ve tie pilings? RECEIVED ❑Yes o (u) If yes number of tie pilings ?WILMINGTON, �f DEC 0 1201114 252 - 808 -2808 s: 1- 888- 4RCOAST ,> www nccoastaimanaggMe .n et remised; 12/27/06 Form DC P -4 (Structures, Page 2 of 4) NS -M, �,. ,: ^:+.' t Y ,ry;`r`., `!, "" v ,: r .. ,% , r i.±Y.'t `, � ��,,.`� a -_jr �,,:�60. ✓i S� .? :' HOC i�IC= ��CA�li"Y /f�i4 AAl� xOP� r :AO . , AR�, �'7 `�`is`Ji -`z yi �.�;�c "?'zl ��:{�s��s ,'<�'�e �,�'-- °c..��,'ti.Fr zr ei h: x� k v3�C4�' wi`T: ,1M1�,. ,�� srt" ��n.�'°_ `•4r - r:fi 4.' 4��3n`ar�.�x`r'4`n.�ii_ 3� a Check each of the following sanitary facilities that will be included in the proposed project ❑ Office Toilets ❑ Toilets for patrons, Number Location N* ❑ Showers ❑ Boatholdmg tank pumpout, Give type and location b Describe treatment type and disposal location for all sanitary wastewater C Describe the disposal of solid waste, fish offal and trash d How will overboard discharge of sewage from boats be controlled? e (i) Give the location and number of "No Sewage Discharge" signs proposed (n) Give the location and number of " Pumpout Available" signs proposed f Describe the special design, if applicable, for containing industrial type pollutants, such as paiht, sandblasting waste and petroleum products g Where will residue from vessel maintenance be disposed of? h Give the number of channel markers and "No Wake" signs proposed i Give the location of fuel - handling facilities, and describe the safety measures planned to protect 1 What will be the marina policy on overnight and live- aboard dockage? k Describe design measures that promote boat basin flushing? I If this project is an expansion of an existing marina, what types of services are currently m Is the manna/ cking facility proposed within a primary or secondary nursery area? ❑Yes o 252 -808 -2808 :. I- 888- 4RCOAST :: www.nccoas4aleatiaatagement.net water quality RECEIVED DCM OJIL I )TON, NC i 2u14 revised- 12127/06 Form DCM MP-4 (Structures, Page 3 of 4) n Is the marina /d king facility proposed within or adjacent to any shellfish harvesting area? ❑Yes o o Is the marina /docking facility proposed within or adjacent to coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SIB), or other wetlands 5 If any boxes are checked, provide the number of square feet affected ❑CW ❑ ❑SB - - - OWL None p Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes eNo If yes, give the name and address of the leaseholder(s), and give the proximity to the lease a (i) Is the boathouse structure(s) ❑Commercial ❑Public/Government ❑Private /Community (i) Number (m) Length (iv) Width Af—. — O—F 4 nrnnn orn nnln..Inlnrl frnm rlrvnl.no rlimenernnc a (i) Number (u) Length I ... N XA /irlfh a Length b Average distance from NHW, NWL, or wetlands c Maximum distance beyond NHW, NWL or wetlands a Is the structure(s) b Number ❑Commercial ❑Public/Government ❑Private /Community c Distance to be placed beyond shoreline d Description of buoy (color, inscription, size, anchor, etc) Note This should be measured from marsh edge, If present e Arc of the swing VV 1LMI1\1U 1 UIN, 252-808-2808 :: 1-888- 4RCOAST :: wwv&f.nccoastaimanag-ea -gn-.. yet revised: 12/27/06 Foam DCM MP -4 (Structures, Page 4 of 4) a Proximity of structure(s to adjacent riparian property lines > L--:> Note For buoy or mooring piling, use arc of swing including length of vessel b Proximity of structure(s) to adjacent docking facilities "> 15 - c - Width cif water �ody — – - - -d Water deptr at wat erward end of structure at NLW or NWL 7- - Co A/L- e (i) Will naviga al aids be required as a result of the project? ❑Yes No ❑NA (u) if yes, explain what type and how they will be implemented a Give complete description RECEIVED DCM V",]VAINGTON, NC OF 0 11 1014 252- 808 -2808 :: 1- 888- 4ROOAST :: vvvvw.nccoastalrnanagernent.net revised: 12/27/06 �' Y _� __ „___L__ _�,_,_�._�.. .. ..�_._ Yd,�+j¢ } i ( �— r � ._ � mow_ J��- _..r -r��- nom.... _ `.. �. d -� .�_ _ y � 4 t i � � , � i 1 i f F 1 � , _ l � f -- � —t F _— �.r —�-° t 1 ! ! � t s t � J a � s ,I )iik DC'Ivl MIi_M;NGTON NkC r V � t9- h10 rl P V Ld Y r 1 — 1 1 Pew tell' 0�/ 211 ��� � SITE �0' WRIGHTSVILLE BEACH NORTH CAROLINA NEW HANOVER LOUNTY RIGHT OF WAY 1 L SCOTTBAGGIE CERTIFY T HAT THIS SURVEY PLANWAS DRAWN UNDER Mf SUPERVISION FROM AN ACTUAL SURVEY MADE UNDERMYSUPERVISION COMPUTED POINT DESCRIPTION RECORDED IN DEED BOOK 1305 PAGE 1479 FENCING PLOTTED FROM INFORMATION REFERENCED THAT THIS PIAT WAS NOT UTILITY POLE PREPARED IN ACCORDANCE WITH G S 4730 AS AMENDED WITNESS SPOT ELEVAIION'-, MY ORIGINAL SIGNATURE REGISTRATION NUMBERANDSFALTHIS 11 rIbAYOF L SCOTT BAGGIE PLS REGISTRATION NUMBER L-3450 /f) //y Ali. h It �- VICINITY MAP —3 I�- � osc AVLw AT c� Q,cl'�6, Ir LOT 24 ill-ko V {�G r I M NMI A f ' � c� I 72 >e 0 7 n J' Y � 1 Napo _ bu t4 LO-T 25 9,3 0 8 s ft _ I .. fie li DECK III DECK � 2 -3.F D/ / tST. I- S.BRICK Ik 4 4 � DUPLEX NOIE -A SUBJECT PROPERTY REFERENCED Al DEED BOOK 1305 PAGE 1479 AND MAP BOOK 9 11f6GE 27 ' THIS PROPERTY IS LOCATED WITH IN A FLOOD HAZARD AREA, PER FIRM 37203167 f DATED 4/3/06, ZONE VE, BFE 15' mm ►� ��; THIS SURVEY IS OF AN EXISTING PARCEL 0 ,7 ® r PROPERTY AND DOES NOT CREATE A SUBDIVISION Q AREA IS COMPUTED BY COORDINATES d d 1 LEGEND R/W — I RIGHT OF WAY O IRON PIPE FOUND ® COMPUTED POINT FENCING J o UTILITY POLE SPOT ELEVAIION'-, --3 1 Ad t. sf 7 7V CONCRETE HEADWALL 0 0 u-� Un s' co LOT 26 r'„')LXe, I I 2- S.F.D. [S-ztcec-t- 4y SURVEY FOR JIM & TAMMY RA , , LITT 30 PELICAN DRIVI LOT 25 - CHANNEL ACRES WRIGIITSVILLE BEACH - NEW HANOVER COUNTY - NORTH CARODIVA NOVEMBER 6, 2014 JOR No.0306 -2014 — )GRESSIVE LAN[) DEVELOPMENT CONSULTANTS, PLLC J ^ SCALE I " = 20' 1 112 PALM BREEZED DRIVE CAROLINA BEACH, NORTH CAROLINA 28428 TELE (910) 707 -0168 0 '"'To 20 40 ' 6C Isbaggle®pldcpa com (P -0874) __�