HomeMy WebLinkAboutNC0023299_Staff Report_19960110CC:
Permits and Engineering
Technical Support Branch
County Health Dept.
Central Files
WSRO
SOC PRIORITY PROJECT: Yes No X
If Yes, SOC No.
To: Permits and Engineering Unit
Water Quality Section
Attention: Jeannette Powell (Review Engineer)
Date: 960110
NPDES STAFF REPORT AND RECOMMENDATION
County Guilford
Permit No. NC0023299
PART I - GENERAL INFORMATION
1. Facility and Address: Ms. Barbara Norcom, Director of
Operations
Oakwood Land Dev. Corp.
7025 Albert Pick Rd. Suite 301
Greensboro, NC 27409
2. Date of Investigation: 960110
3. Report Prepared by: Ron Linville
4. Persons Contacted and Telephone Number:
Richard Jenkins 910/656-7100
Barbara Norcom 910/855-2526
5. Directions to Site: From Greensboro I-85/40 take Randleman
Rd south then left on Sheraton Park Rd. WWTP will be on
left approx. 3/4 mile just before large lake.
6. Discharge Points(s), List for all discharge points:
Latitude: 35058'12" Longitude: 79047'43"
U.S.G.S. Quad No. D19NE U..S.G.S.,Quad Name Pleasant Gdn.
7. Site size and expansion area consistent with application ?
X Yes No If No, explain:
8. Topography (relationship to flood plain included):
Not in floodplain but adjacent to discharge from lake.
9. Location of nearest dwelling:
None known within 1000'.
10. Receiving stream or affected surface waters:
UT Polecat Creek
a. Classification: WS-III
b. River Basin and Subbasin No: CPF 0306
c. Describe receiving stream features and pertinent
downstream uses: Stream has very little flow during
dry weather and has a history of appearing black and
having eutrophic conditions probably from solids
escaping the WWTP. Mats of material and bubbles are
often observed arising from the bottom of the stream
near the WWTP. Noxious conditions have been alleviated
by stream pumping by the ORC at the direction of the
Permittee.
Part II
DESCRIPTION OF DISCHARGE AND TREATMENT WORKS
1. a. Volume of Wastewater to be permitted: 0.070 MGD
(Ultimate Design Capacity)
b. What is the current permitted capacity of the Waste
Water Treatment facility? Same.
c. Actual treatment capacity of the current facility
(current design capacity)? 0.070 MGD with sandfilters
activated.
d. Date(s) and construction activities allowed by previous
Authorizations to Construct issued in the previous two
years. A2C issued in March, 1994 for construction of
dual tertiary sand filters and a UV disinfection unit.
The Region understands that the above construction has
been postponed until a determination has been made as
to a possible connection to a POTW in Greensboro.
e. Please provide a description of existing or
substantially constructed wastewater treatment
facilities: Extended aeration treatment plant with
influent pump station and two parallel aeration systems
with diffused aeration, aerated sludge holding tank,
continuous flow recorder measuring device and standby
power and gas chlorinator. System may not always be
operated as a parallel system and old sandfilters are
not utilized.
f. Please provide a description of proposed wastewater
treatment facilities. See A2C above.
g Possible toxic impacts to surface waters: BOD concerns
and public water supply concerns.
NPDES Permit Staff Report
Version 10/92
Page 2
h. Pretreatment Program (POTWs only):
in development approved
•
should be required not needed
2. Residuals handling and utilization/disposal scheme:
a. If residuals are being land applied, please specify DEM
Permit No. NA .
Residuals Contractor: Richard Jenkins
Telephone No. Same as above.
b. Residuals stabilization: PSRP PFRP
Other
c. Landfill:
d. Other died tolPOTWlination GreensboroeasSneeded): Pumped
and ha
3. Treatment plant classification (attach completed rating
sheet). II
4. SIC Code(s) : 6515
Primary 08 Secondary _
Main Treatment Unit Code: 060 8
PART III - OTHER PERTINENT INFORMATION.
1. Is this facility being constructed with Construction Grant
Funds or are any public monies involved. (municipals only)?
2. Special monitoring or limitations (including toxicity)
requests: None.
3. Important SOC, JOC or Compliance Schedule dates: (Please
indicate)
Submission of Plans and Specifications
Begin Construction
Complete Construction
4. Alternative Analysis Evaluation: Has the facility evaluated
all of the non -discharge options available. Please provide
regional perspective for each option evaluated.
Date
NPDES Permit Staff Report
Version 10/92
Page 3
Spray Irrigation: Not enough land withoututilizing
developable, property.
Connection to Regional Sewer System: Connection is being
pursued by Oakwood and may be possible within three years.
Subsurface: Not enough land without using developable
property.
Other disposal options:
5. Other Special Items: Associated creek conditions are not
good and complaints have been investigated by the WSRO due
to the water supply concerns. Recommend that the Water
Supply Section also be allowed to comment on this discharge
as well as the City of Randleman. An alternatives analysis
was submitted to the Division on October 12, 1993. This
alternatives study should be reevaluated prior to Dec. 31,
1996 due to- the enhanced potential for public sewer in the
Pleasant Garden community and reported recent discussions
between the City of Greensboro and Oakwood Land Development
Corp (owners of the Woodlake MHP WWTP). Conditions in the
creek may be somewhat due to low flows during summer months
and backed up waters; however, the Region still believes
that solids are likely to be escaping into the stream from
time to time.
PART IV - EVALUATION AND RECOMMENDATIONS
The WSRO recommends that the permit be reissued with a
stipulation that the sandfilters and ultraviolet
disinfection be installed withintwo years of permit
issuance or connect to the public sewer. The facility
should also be required to connect to the POTW.within 180
days of economically feasible availability regardless of any
upgrades. This recommendation is based on Part II Section
B.2. and Section 4.13. of the existing NPDES Permit.
S}rgnature of report preparer
-7
QualitRegional Supervisor
e
NPDES Permit Staff Report
Version 10/92
/ 99,6
Page 4
11
' At-4E a
859, \--ZV7
1
vilTs
a 8: