HomeMy WebLinkAboutNC0085812_Report_20221104w
UNIONCOUNTY
WAT E R
Mr. Andrew Pitner
North Carolina Department of Water Resources
Water Quality Regional Operations Section
610 East Center Ave. Suite 301
Mooresville NC 28115
Thursday, November 3, 2022
RE: EMC SOC WQ S20-001 November 2022 Quarterly Progress Report
Mr. Hennessy,
Union County Water receieved the fully excuted SOC for the Grassy Branch WRF on June 21, 2022. As a
requirement of this SOC the County is to submit quarterly progress reports. This letter serves as the
quarterly progress report this month. Below is a summary of items that are underway.
For Collections system permit WQCS00054
• Ongoing inflow and infiltration (I&I) rehabilitation in the Grassy Branch basin.
o Attached is the final I&I report from Hydrostructures.
o Manhole repairs will be performed in-house awaiting materials.
For NPDES Permit NC0085812
• Submit Contract documents for regulatory approval for Grassy Branch WWTP upgrade project.
o Hazen and Sawyer has been selected as the engineering consultant and a master
agreement was executed on September 27, 2022. We are developing a task order with
Hazen and Sawyer for the engineering design, peimitting and bidding services for the
expansion.
If you have any further questions please feel free to contact me.
Sincerely,
Litc.,4
Andrew Neff, PE
Water & Wastewater Division Director
CC: Hyong Yi, Public Works Administrator
John Shutak, Engineering Division Director
Josh Brooks, Assistant Division Director, Water & Wastewater
Greg Morgan, Utility Field Services Superintendent
Jonathan Jordan, WRF Superintendent
Jacob Allen, WRF Supervisor
Union County Water
4600 Goldmine Rd
Monroe, NC 28112
T 704.289.1434
unioncountync.gov/water