Loading...
HomeMy WebLinkAbout20141286 Ver 1_Shoreline Stabilization_201412132 0 1 4 1 2 8 8 State of North Carolina Department of Environment and Natural Resources Division of water Resources 15A NCAC 02H USCG — water Quaht1 Certification, Shoreline Stabilization L,I it o-� of tr;s FORM SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to, [1 M 1� n Division of Dilater Resources 401 &r Suffer Permitting Unit ID14 i "ET1 1617 Mail Service Center Raleigh, NC 27699 -1617 _WATERRESOURCES F R ERMITTING � L I. Applicant Information [15A N AC 02H 0502 DENR - wAl ER RESOURC 1 Owner Information 401 &BUFFERPERMITV Name W,a..Y Mailing Address Telephone Number S e- i 1515 Fax Nurnber E-mail Address a'T r.1 2 Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here It /ftiv,�� _ ,� �is�c� ar,7i �_n�il,�I' i �ls 59fclecs /�E �latorylreclucs /E cr,n�tsj5� iNPLc /?GEIJT AiETEI ORIZATION FORM pdf) must be attached if the Agent has signed this application form Name < Company Affiliation Mailing Address Telephone Number 41A 3 <z)-17-3 Fax Number E -mail Address .\s����v�� nrn Person to receive the Certification Approval TY II. Project Information [15A NCAC 1 Attach a vicinity map (i e street map) clearly showing the location of the property with respect to focal landmarks such as towns, rivers, and roads 2 Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM SSGP 10 -2013 Page 1 of f etc,), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors You may use the diagram provided at the end of this application form 3 Attacti a photograph of the shoreline/ buffer proposed to be stabilized (Include a scale of some sort a yard stick, shovel handle, etc ) 4 Location of the property (where work is to be conducted) County ��<- (5`�t' "t Nearest Town �wttv-C.. Subdivision name or site address (include phase /lot number) L c44 Directions to site please include road names and numbers, landmarks, etc kle C/ Latitude (,n dermal degrees) �S • % ?� Longitude (dearnai degrees) 'Y Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc ) �'CS ,,� It 6 Property size (acres) y„)y 7 Lake/ river/ ocean adjacent to property _L1"C 8 Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary) tn54� It >c� f4 C) N��F� l F'- 6r/-� 9 Will work be conducted from land? ❑ From water? [� 10 Total amount of disturbance (including all excavation, backfill, rip rap, retaining wails, etc ) below the normal pool lake level/ Normal Water Level in square feet or acres 11 Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc ) above the normal pool lake level/ Not mal Water Level and 50 feet land -ward in square feet or acres '7S :;�q P 12 Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance) S(Jvfwt )5 Afl-z-s Owner /Agent's S gnature" [15A NCPC 01H 0502010 gate Agent's signoture is volid only if on ourhorization letterfrorn the owner is provided FORM SSGP 10 -2013 Page 2 of 3 Normal dater Level St)oreline t La ke 1 (VQ ""laiW3t; -�P�:a Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *. 1 All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM SSGP 10 -2013 Page 3 of 3 G C� r 0 C r I mac' G r_ 'r < ,rc f �. X t r oo ° = by j �pj � �O Y Nay y� ay _ ` xx �I li �n7 Ai� i ryo 6p,G It ,, ;y im itB �I ; r ,,S�BZ•4c.t ,19911 \ \\` 'l\ y' 3 i I o �4� a ��a n r\ ,`\� IMI N / o + , c % b A, r toy IG r� I or 46 40V 46V � 44 Arp AV . At AV, 4W OL AIP AIF- &VIP