Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC223587_Site Plan or Location Map_20221104
DocuSign Envelope ID: 0ED0138713-95E14A78-8245-81312AD73E3FD Sitework Plans for AP D 6-10 q7 D 111 Phase 1 ODESSA DRIVE STATESVILLE, NC IREDELL COUNTY I 41)L EX © COPYRIGHT 2022 BY BLUE RIDGE ENGINEERING PLLC, NC LICENSE #P-0205, ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE RE -USED, SOLD, LOANED OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLUE RIDGE ENGINEERING PLLC IS PROHIBITED. m Q� z z 0 0 z a a Z� o w 0 � a z O a ° ° ° 00 o = " o U > o vHi Q z a 0 w 0 0 0 Z D N Q z to z O H H d J w O Z 0 w z N z N 0 N 0� Z in 0 p=> N 0 Z p z Q\ w w Z Q N w O > z Q w > w w Z Z 2 0 ~ of w z z 0 0 D of U p w 0 00 00 z z w H w N z in in C7 C7 z z to U O Ln — N N N N N N N N N N N J O (n O O O O O O O O O O Q^ O N M M 00c\-I M c\-I n l\O O Z O (D (n — N N N �O n n 00 00 M M c-I c-I c-I O O O O O O O O w w 7 Ln �o ^ W m cc'c-I N M c-I c-I c-I c-I �� o00000000 � �i o�o�FFCARO 55/0ooi2:�� S oF N9� o SEAL oo = [cuSigd:� 0 oo°O ntl_'_ � 1 41R�. 09/30/2022 U J J a L CYl O I11 O lfl r_j 00 • Z c n W 1 o (Ij L a) O O (n3u O —N M0 o6 - �L Q� S pmp 3 m i 1.0 3: E z m M PROJECT SUMMARY THIS PROJECT CONSISTS OF AN INITIAL PHASE OF DEVELOPMENT OF A 98 ± ACRE TRACT LOCATED AT THE CUL-DE-SAC OF ODESSA DRIVE IN STATESVILLE, NC. THE PROPERTY IS A VACANT PARCEL. THE N INITIAL PHASE OF DEVELOPMENT WILL CONSIST OF MASS GRADING AND INSTALLATION 4Cf 0 STORMWATER INFRASTRUCTURE TO PREPARE FOR DEVELOPMENT OF A DISTRIBUTION CENTER Q o O1 CAMPUS CONSISTING OF THREE INDUSTRIAL BUILDINGS WITH ENTRANCE DRIVES/ROADS, TRUCK COURTS, TRAILER PARKING, EMPLOYEE PARKING AREA, STORMWATER INFRASTRUCTURE AND PUBLIC UTILITIES. ACCESS WILL BE PROVIDED VIA A NEW DRIVEWAY FROM THE ODESSA DRIVE CUL-DE-SAC. (1) o THE PROPERTY IS IN THE CITY OF STATESVILLE ZONING JURISDICTION. o _0 Y 0 _0 (D EROSION AND SEDIMENT CONTROL MEASURES HAVE BEEN DESIGNED WITH SKIMMER AND a� L CL SEDIMENT BASINS AS THE PRIMARY SEDIMENT CONTROL DEVICE. THE PRIMARY CONSTRUCTION ENTRANCE FOR THE PROJECT WILL BE ON ODESSA DRIVE. THE PROJECT IS LOCATED IN THE YADKIN PEE-DEE RIVER BASIN DRAWING INDEX CHAPTER 1 x C-1.0 Cover Sheet a) CL C-1.1- C-1.2 General Notes / NCGO1 Notes E O C-1.3 Infrastructure Summary U C-1.4 Existing Conditions C: O CHAPTER 2 - EROSION & SEDIMENT CONTROL Z' C-2.0 Overall ESC Plan C-2.1a - C-2.1d ESC, Initial Phase N C-2.2a - C-2.2d ESC, Intermediate Phase 0) ow-0 z CHAPTER 4 - GRADING PLANS cry N " a) C-4.0 Overall Grading Plan v Q0 N C-4.1-4.4 Grading Plan O 4- -0 V 6- O cn CHAPTER 5 - STORM DRAINAGE PLANS SHEET C-5.0 Overall Storm Drainage Plan C-5.1-5.5 Detailed Storm Drainage Plan C-100 CHAPTER D - DETAILS D-1.1-1.2 Erosion & Sediment Control Details