Loading...
HomeMy WebLinkAboutNCC223762_Site Plan or Location Map_20221103DocuSign Envelope ID: 02844B25-5F84-4FA2-8354-AAB87CC9CF53 VICINITY MAP 1 "=4500' i r o ' Q 0 i J I E cw* ood P1 I �I JI 5 °I SITE Maadhali Ct - S Tricenter Blvd M. uard pi p Y W it W JI C� U w 5 ~ L I SITE DATA TABLE OWNER NAME: TWO INVESTMENTS LLC OWNER ADDRESS: 4040 SOUTH ALSTON, DURHAM, NC 27713 DEVELOPER/CLIENT NAME: T.D. GOODWIN CONSTRUCTION, LLC DEVELOPER ADDRESS: P.O. BOX 3462 GREENVILLE, NC 27834 PIN: PID: ZONING: DEVELOPMENT PLAN DESIGNATION OVERLAY DISTRICTS: DEVELOPMENT TIER: LOT ACREAGE: RIGHT-OF-WAY DEDICATION: TOTAL SITE ACREAGE: EXISTING USE: PROPOSED USE: EXISTING IMPERVIOUS: PROPOSED IMPERVIOUS: BUILDING SETBACKS (UDO 6.10.1.13.2): STREET YARD: SIDE YARD: REAR YARD: 0738-29-74-6535 157211 IL(D) P91-22 N/A SUBURBAN TIER 4.77 ACRES 0.10 ACRES 4.67 ACRES LIGHT INDUSTRIALIWAREHOUSE LIGHT INDUSTRIALIWAREHOUSE 62,011 SF 109,450 SF 40' 20' (30' REQUIRED, REDUCED BY 10', ADJACENT TO INDUSTRIAL ZONE PER UDO 6.10.1.B.2.B) 12.5' (25' REQUIRED, REDUCED BY 50% PER UDO 6.10.1.13.2.C, ADJACENT TO RAILROAD R/W) PROJECT BOUNDARY BUFFERS (UDO 9.4.3.13 & 9.4.5.B.1) FRONT BUFFER: NONE REQUIRED (UDO 9.4.1.G.1) REAR BUFFER: NONE REQUIRED (UDO 9.4.1.G.1) NORTH BUFFER: 25' (0.4 OPACTIY) (50' - 0.8 OPACITY REQUIRED, REDUCED BY 50% PER UDO 9.4.3.C.3) SOUTHBUFFER: ...»«..»«.».«........ ............................., EXISTING BUILDING AREA: 25,716 SF TOTAL PROPOSED BUILDING AREA (EXISTING + PROPOSED): 55,716 SF PROPOSED WAREHOUSE AREA: 28,520 SF PROPOSED OFFICE AREA: 1,480 SF PROPOSED BUILDING COVERAGE: 27.4% MAX BUILDING COVERAGE: 60% REQUIRED PARKING: 12 SPACES (1 SPACE PER 5,000 S.F. WAREHOUSE + 1 SPACE PER 250 S.F. OFFICE) PROPOSED PARKING: 21 SPACES REQUIRED BIKE PARKING: 2 (2% OF MV PARKING, MIN 2.) PROPOSED BIKE PARKING: 2 WATERSHED: NORTHEAST CREEK RIVER BASIN: CAPE FEAR THIS SITE LIES WITHIN A TYPE "X" FLOOD HAZARD AREA PER MAP# 3720073800K, EFFECTIVE DATE 10/19/2018. DISTURBED AREA: 2.8 ACRES TOTAL TREE COVERAGE REQUIRED WHEN 8%-10% IS PRESERVED: 13% PRESERVED TREE COVER AREA PROVIDED: 8.2% REPLACEMENT TREE COVER AREA PROVIDED: 4.9% TOTAL TREE COVER PROVIDED: 13.1% 1 1 I 1 1 I 1 1 I 1 1 TRIANGLE BEVERAGE (P91-22) DEVELOPMENT PLAN NOTES 1. (PHASE 1) THE BUILDING FACADE OF THE WAREHOUSING FACING S, ALSTON AVENUE SHALL BE CONSTRUCTED OF BRICK AND GLASS BUILDING MATERIALS. 2. (PHASE 2) THE S ALSTON AVENUE FRONT FACADE(S) OF THE ADDITIONAL BUILDING)S_ IN THE SPECIALITY RETAIL AREA SHALL BE CONSTRUCTED OF QUALITY BUILDING MATERIALS SUCH AS BRICK, GLASS, OR MASONRY, THE OVERALL DESIGN OF THE BUILDING(S) IN PHASE 2 SHALL BE COMPATIBLE WITH THE PHASE 1 DEVELOPMENT AND CONSTRUCTION WITH RESPECT TO LAYOUT, COLOR, BUILDING MATERIALS, LANDSCAPING, GENERAL ROOF DESIGN AND PITCH, GENERAL ARCHITECTURAL STYLE, AND OVERALL APPEARANCE. 3. THE PHASE 2 BUILDING AND PARKING FOOTPRINT ARE ILLUSTRATIVE, ONE OR MORE BUILDING MAY BE CONSTRUCTED IN THE PHASE 2 AREA AND THE PARKING MAY BE ALLOCATED IN ONE OR MORE AREAS. BUILDING AND PARKING LOCATION SHALL BE APPROVED AT THE SITE PLAN STAGE. 4. THE REQUIRED BUFFER FOR THE DOCK(S) IN PHASE 1 SHALL MEET THE ZONING ORDINANCE REQUIREMENTS ARE CONSTRUCTION OF PHASE 1. THE PHASE 1 REQUIRED BUFFER MAY BE ALTERED AND/OR REDUCED IN ACCORDANCE WITH THE ZONING ORDINANCE WHEN THE PHASE 2 BUILDING(S) IS (ARE) CONSTRUCTED AND THE VISUAL BLOCK REQUIRED BY THE ZONING ORDINANCE IS THEREBY OBTAINED. 5. PARKING FOR EACH PHASE SHALL BE PROVIDED AT THE RATE REQUIRED BY THE CITY ZONING ORDINANCE ROAD AND SIDEWALK IMPROVEMENTS, DEDICATION 1. THE DEVELOPER SHALL DEDICATE 10 FEET ALONG S. ALSTON AVENUE FOR THE STREET WIDENING AND INSTALLATION OF A BIKE LANE BY THE CITY. THE DEVELOPER SHALL CONSTRUCT A SIDEWALK ALONG THE S ALSTON AVENUE FRONTAGE OF THE PROPERTY. THE SIDEWALK SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY STANDARDS. THE SIDEWALK FOR EACH PHASE SHALL BE CONSTRUCTED AS A PART OF THE INITIAL BUILDING DEVELOPMENT OF THE PHASE. 2. THE ACCESS DRIVE FOR THE DEVELOPMENT SHALL COORDINATE WITH THE DRIVE FOR THE RESEARCH TRI-CENTER PROJECT (P 91-17) TO THE NORTHEAST BY HAVING THE DRIVEWAYS ALIGNED OR SUFFICIENTLY OFFSET. BIKE LAKES SHALL BE CLEARLY MARKED AT THE VEHICULAR ENTRANCES AND EXITS. LAKE DRAINAGE THE LAKE AT THE NORTHERN PORTION OF THE PROPERLY SHALL BE DRAINED TO PERMIT CONSTRUCTION OF THE SPECIALTY RETAILED BUILDINGS. DRAINAGE OF THE THE LAKE DOES NOT REQUIRE APPROVAL BY THE CORDS OF ENGINEERS UNDER PRESENT REGULATIONS AND STANDARDS. r 0 w a CONSTRUCTION DRAWINGS 4040 S. ALSTON AVE. DURHAM, NORTH CAROLI NA 27713 OCTOBER 26, 2022 i z w i L I -C ~ CO o Q o I I x -�- S TRICENTER BLVD, /\ ' 0 I 100, DEVELOPER/CLIENT SEAL T. D. 0 0 0 D W I N CONSTRUCTION, LLC °°°us�b°°°°°°° ,� r A R eoeoee °O P.O. BOX 3462 /per%�/°° I" iT °e � 66B E6B04494... o 0 o GREENVILLE, NC 27834 a a SEAL 8 e a a 049219 a g PHONE: (252) 321-7732 �00 �'°°0oOONGINE��''o �0° A ooeeooe°° ° °°°® oil D Ev °800000p0p4o ATTN: JUSTIN LANE, PM 6/20220 PREPARED BY: WithersRavenel Engineers I Planners 137 S Wilmington Street I Suite 200 1 Raleigh, NC 27601 1 t: 919.469.3340 1 license #: F-1479 1 www.withersravenel.com 200' INDEX OF SHEETS Sheet Number Sheet Title C0.00 COVER C0.01 GENERAL NOTES C0.02 SIGNED SURVEY C1.00 EXISTING CONDITIONS & DEMOLITION C2.00 SITE PLAN C3.00 UTILITY PLAN C4.00 STORM DRAINAGE & GRADING PLAN C4.01 EROSION CONTROL STAGE 1 C4.02 EROSION CONTROL STAGE 2 C4.03 EROSION CONTROL DETAILS C4.04 EROSION CONTROL DETAILS & NARRATIVE C4.05 NCG01 DETAILS C5.00 SCM 1 PLAN AND PROFILE C5.01 SCM DETAILS C6.00 SITE DETAILS C6.01 WATER DETAILS C6.02 SEWER DETAILS C6.03 STORM DRAINAGE DETAILS 1-1.00 LANDSCAPE PLAN 1-1.01 SCM LANDSCAPE PLAN L2.00 LANDSCAPE DETAILS L3.00 TREE CONSERVATION PLAN L4.00 LAND DISTURBANCE TREE SURVEY SL1.00 LIGHTING PLAN DURHAM SPECIAL CONDITIONS OF APPROVAL PRIOR TO THE ISSUANCE OF A BUILDING PERMIT: 1. DEDICATE 10 FT. OF ADDITIONAL RIGHT-OF-WAY FOR THE FRONTAGE OF THE SITE ALONG S. ALSTON AVENUE. A COPY OF THE RECORDED PLAT MUST BE SUBMITTED WITH THE BUILDING PERMIT GENERAL NOTES 11. SOLID WASTE CONTAINMENT CAPACITY AND COLLECTION FREQUENCY WILL BE SUFFICIENT TO PREVENT THE ILLEGAL PLACEMENT OF TRASH RECYCLABLE& 12. SEE SHEET C0.1 FOR ADDITIONAL NOTES INCLUDING: DURHAM COUNTY GENERAL CONDITIONS OF APPROVAL, DURHAM PUBLIC WORKS CONDITIONS OF APPROVAL & GRADING & STORM DRAINAGE NOTES (izo C7 0 7 < 0- �x� p w o z� pLU0 LU �UiU �z� cn 0 0 zF:ry m �ry Cn 0 J N ry U Q nl IPPANA r.r)i InITY Revisions COMMENTS 1 FIRST CONSTRUCTION 7/29/2022 DRAWING SUBMITTAL 2 SECOND CONSTRUCTION 9/16/2022 DRAWING SUBMITTAL 3 DURHAM COUNTY 10/26/202 COMMENTS SEE SHEET 13.00 FOR ADDITIONAL TREE COVERAGE INFORMATION