Loading...
HomeMy WebLinkAbout20141228 Ver 1_Approval Letter_20141211Dear Mr. Garrett: In accordance with your application dated November 20, 2014: received on December 4, 2014, approval has been granted for the impacts listed in the table below. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and any additional conditions listed below. Project impacts are covered by the attached Water Quality GeneraLCertification Number 3898 and the conditions listed below. This certification is associated with the use of General Permit Number 30 issued by the U.S. Army Corps of Engineers. Please note that you should obtain or otherwise comply with any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Erosion and Sediment Control, Water Supply Watershed and Trout Buffer regulations. IMPACTS APPROVED The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification, General Permit and /or Buffer Rules are met.. No other impacts are approved, including incidental impacts. Type of Impact Amount Approved Permanent ;Above Open Waters Pool F0.0023 Below Pool (acres) 0.0046 acres) NCDENR 77 -' t° ': North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III - Governor Secretary - December 11, 2014 DWR# 14 -1228 Jackson County David Garrett 978 Wessington Manor Lane _ Fort Mill, SC 29715 Subject: - APPROVAL OF 401 WATER QUALITY CERTIFICATION Garrett Lakeside Village Lot 1 Shoreline Stabilization Dear Mr. Garrett: In accordance with your application dated November 20, 2014: received on December 4, 2014, approval has been granted for the impacts listed in the table below. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and any additional conditions listed below. Project impacts are covered by the attached Water Quality GeneraLCertification Number 3898 and the conditions listed below. This certification is associated with the use of General Permit Number 30 issued by the U.S. Army Corps of Engineers. Please note that you should obtain or otherwise comply with any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Erosion and Sediment Control, Water Supply Watershed and Trout Buffer regulations. IMPACTS APPROVED The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification, General Permit and /or Buffer Rules are met.. No other impacts are approved, including incidental impacts. Type of Impact Amount Approved Permanent ;Above Open Waters Pool F0.0023 Below Pool (acres) 0.0046 acres) ADDITIONAL CONDITIONS 1. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification/Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval. Water Quality Regional operations— Asheville Regional0fce 2090 US Hwy, 70, Swannenoe, NC 28778 Phone: 828 - 296-05001 FAX: 828- 299 -7043 Internee htlpalportel.ncoencorawehWglws An Equal Opportunity 1 Affirmative Action Employer David() rtew 12/11/14 Page 2 0£3 letter and General Certification (s) /Pennit/Authoriza£ion and is responsible for complying with all conditions. 2. Rip -rap must be placed along the base of all dry stacks with a minimum depth of one foot and a slope of 2 to 1 with a three foot base at the lakebed dry stack interface. Per Exhibit 3 of the Duke Shoreline Management Guidelines. 3. Replant or allow the re- establishment of native vegetation in areas within the project - - -- boundary where it has been removed. Per Exhibit I of the Duke Shoreline Management - Guidelines. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form maybe obtained from the OAH at httn: / /www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431 -3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:OOam and S:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431 -3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the fazed transmission. Mailing address for the OAH: - Ifsending via US Postal Service: If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699 -6714 Raleigh, NC 27609 -6285 One (1) copy of the petition must also be served to DENR: Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699 -1601 David Gartett 12/11/14 - Page3 of3 This letter completes the review of the Division under section 401 of the Clean Water Act as described in 15A NCAC 02H 0.500. Please contact Tim Fox at 828 - 296 -4664 or tim.foxp—ncdem. eov if you have any questions _ or concerns. Sincerely. G. Landon Davidson, P.G., Regional Supervisor Water Quality Regional Operations Asheville Regional Office Enclosures: GC 3898 Certificate of Completion cc: DWR ARO 401 files - cc: Kevin Holland — Duke Energy David Brown - USACE Asheville Regulatory Field Office DoGdWR \WQVackson \40ls\Nan -LO 1O nett Lakeside Village L t 1\APRVL.401Gan !uAesideVillageLotl 12- 11- 14.daccamen2 L