HomeMy WebLinkAboutNCG140514_Site Plan_202211031
2
3
-- R(S
LD 421 RD
0-100dYR.Lw!
13)
CONCRETE BATCH PLANT
5± ACRES
IMPERVIOUS AREA = 5 ACRES
I I
I - _
I- t
I
�li
I � •\�
F.pir
O o R
rt
I
�
1 Basin 2A2a `I
t - 99 75 acres
iwPERVIOUS
AREA-84.8
ACRES
WETLAND —
RISER SEDIMENT
BASIN (RB-2A2a)
DISCHARGE FROM SEDIMENT BASIN
-AREA DRAINING FROM CONCRETE
BATCH PLANT
CLEAN WATER DIVERSION
DITCH DRAINING AREA TO
`THE SOUTH TOWARDS
DODSONS LAKE
FLOOD PLAIN BOUNDARY
BROWNS MEADOW ROAD/US421 INTERSECTION
ENTRANCE INTO SITE. CLOSED AND
OPEN FOR CONSTRUCTION ACCESS ONLY
HDR Engineering Inc.
of the Carolinas
440 S. Church Street, Suite 1000
Charlotte, NC 28202
704.338.6700
N.C-B.ELS. License Number F-0116
ISSUE DATE DESCRIPTION
4
• vJtR Rk
vw,.
MATCHLINE - SEE THIS SHEET FOR CONTINUATION
PROJECT MANAGER VICKIE M. MILLER, AICP, PWS
PROJECT ENGINEER WES TURLEY, PE
DESIGN ENGINEER WES TURLEY, PE
DRAWN BY FRANCES SADLER, EIT
CHECKED BY WES TURLEY, PE
PROJECT NUMBER 110068163
5
6
Rim
1 1°
s r
t
�
s >�
7 8
_ _dHcteanMile Etan
GreEnsbl0
r
nestOWn 1
aleasant""'Ill D
Gd�dQr PROJECT
LOCATION
GUILFORD COUNTY
ale RANDOLPH COUNTY
3n �,
�` I� liberty
Wiv lvlarket
LEGEND
TOYOTA BATTERY MANUFACTURING NORTH
CAROLINA (TBMNC)
GREENSBORO RANDOLPH MEGASITE
RANDOLPH COUNTY, NORTH CAROLINA o 1"
LOCATION MAP
NOT TO SCALE
r4
FLOOD PLAIN BOUNDARY
OVERALL SITE PLAN
2- FILENAME 01C-S01 (1).dwg
9
SCALE 1" = 500'
SIUITC-SU1
(1)
C
B
A