HomeMy WebLinkAboutNC0046809_Staff Report_19950728NORTH CAROLINA DEPARTMENT OF ENVIRONMENT
HEALTH AND NATURAL RESOURCES
DIVISION OF ENVIRONMENTAL MANAGEMENT
July 28, 1995
MEMORANDUM
TO: Jay Lucas
THROUGH: Steve Mauney
FROM: Ron Linville A/
SUBJECT: Permit Renewal Request
Pentacostal Holiness Church/NC0046809
Guilford County
Please be advised that the WSRO is unaware of any changes
associated with this proposed discharge since the previous staff
report (see attached).
The classification of the tributary to Benaga Creek is
incorrect on the previous staff report however. The correct
classification is "C-NSW". Additionally, the WSRO does not see a
need to have two sets of limits pages based on anticipated flow
volumes. The flow should be limited throughout the year at 0.020
MGD unless there is some advantage provided to the permittee in
sampling or limits.
The Region recommends reissuance of the NPDES Permit.
cc: WSRO
Central Files
Technical Support
Guilford County EHLTH
a:\pentcost.rnw
cc: Permits and Engineering (NPDES)
Technical Support
Guilford County Emergency Management
Guilford County Plan. & Dev. Dept.
Central Files
WSRO 1/--'
Date July 27, 1990
Page 1 of 3
NPDES STAFF REPORT AND RECOMMENDATIONS
County Guilford
NPDES Permit No..NC0046809
PART I - GENERAL INFORMATION (Renewal)
1. Facility and Address:
Western N.C. Conference Center - Pentecostal Holiness
Church located at 7545 Highway 29 North, Greensboro,
N.C. Mailing Address: Rev. Tommy Fuquay, Conference
Superintendent, The Pentecostal Holiness Church,
Western North Carolina Conference Center, P. O. Box
150, Browns Summit, N.C. 27214-150
2. Date of Investigation: July 18, 1990
3. Report Prepared by: Arthur R. Hagstrom, Environmental
Engineer, DEM, WSRO, WQ
Persons Contacted and Telephone Number: -253 6
Tommy—Fuquay, Conference Superintendent: 910 - 6 5 6-7-3-8—
Russell Radford, Environmental Consultant:
919-996-3598
4.
5. Directions to Site:
From the Junction of US 29 North and NC 150 go north on
US 29 approximately .5 mile and the Conference Center
is on the left (west) at 7545 Highway 29 north.
6. Discharge Point - Latitude: 36° 13' 45"
Longitude: 79° 41' 30"
Attach a USGS Map Extract and indicated treatment plant
site and discharge point on map.
USGS Quad No. C2ONW or USGS Quad Name Browns Summit
7. Size (land available for expansion and upgrading):
Approximately 100 acres. Adequate for expansion as may
be needed.
8. Topography (relationship to flood plain included):
In and around the WWTP the land has been graded to suit
the plant and the discharge line. Not in a flood plain
- slope varies from 2% to 10%.
Page 2 of 3
NC0046809
July 27, 1990
9. Location of nearest dwelling: Off -site dwellings and
on -site dwellings are over 1000 feet from the WWTP.
10. Receiving stream or affected surface waters: The
discharge enters a small U.T. to Beneja Creek.
a. Classification: WS III, NSW
b. River Basin and Subbasin No.: Cape Fear; 03-06-01
c. Describe receiving stream features and pertinent
downstream uses: The receiving stream always has
had flow during CEI's and CSI's since 1985.
Downstream the stream flows through rural
underdeveloped areas. Per the USGS map much of the
downstream is swampy.
PART II - DESCRIPTION OF DISCHARGE AND TREATMENT WORKS
1. Type of wastewater: 100% Domestic
0% Industrial
a. Volume of Wastewater: 1. June 1 through August
31, Monthly Average is .020 MGD
2. September 1 through May 31, Monthly Average is
.004 MGD
b. Types and quantities of industrial wastewater: N/A
c. Prevalent toxic constituents in wastewater: N/A
d. Pretreatment Program (POTWs only): N/A
in development approved
should be required not needed
2. Production rates (industrial discharges only) in
pounds: N/A
a. highest month in the last 12 months
b. highest year in last 5 years
3. Description of industrial process (for industries only)
and applicable CFR Part and Subpart: N/A
4. Type of treatment (specify whether proposed or
existing): Collection system, splitter box, bar screen,
dual (parallel) aeration tanks, dual (parallel)
clarifiers, tertiary filters (2), tablet chlorination,
C1 contact chamber, rectangular wier/water supply
meter, and discharge line.
Page 3 of 3
NC0046809
July 27, 1990
5. Sludge handling and disposal scheme:
Contract Pumping to North Buffalo WWTP (Greensboro)
6. Treatment plant classification: Class II
7. SIC Code(s) 7033 and 8661
Wastewater Code(s) 13 This is a meeting and
conference center and facilities include a camping area
and group homes on the site and a large meeting hall
plus a cafeteria.
PART III - OTHER PERTINENT INFORMATION
1. Is this facility being constructed with Construction
Grants Funds (municipals only)? N/A
2. Special monitoring requests: Phosphorous monitoring
3. Additional effluent limits requests: None
4. Other: This facility has wide swings in use and for
years the off season flows have been reported at less
than 500 GPD. Based upon a recent study of levels of
usage, the facility's flows appear to be changing so
that the off-season flows will be higher (.004 MGD from
September 1 through May 31) and the high -use season
flows will drop (.020 MGD from June 1 through August
31). The receiving stream, though fairly small, has
always had a flow when on -site inspections have been
made since 1985.
PART IV - EVALUATION AND RECOMMENDATIONS
The WSRO recommends that the Permit be re -issued in
accordance with current DEM policy and include the seasonal
flows requested.
OJI-42A
Signature of re
-7
Date
1
t preparer
790
Water Quality Supervisor
7— ;i/% y/)
Date