Loading...
HomeMy WebLinkAbout20140347 Ver 3_Application_20141215Hand Existing Existing Permanent Temp. ExcavationMechanized ClearingPermanent Temp. ChannelChannelNatural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts ImpactsStream No.(From/To)Size / Type Wetlands Wetlands Wetlandsin Wetlands Wetlands impacts impactsPermanentTemp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) -L- 13+90.14 TO 14+06.23 BANK STABILIZATION <0.01 0.01 120 -L- 13+95.17 TO 14+13.62 CAUSEWAY 1 (*)< 0.01 0.02 44 -L- 14+33.02 TO 14+73.88 CAUSEWAY 2 (*)<0.01 0.03 41 -L- 14+66.54 TO 14+78.90 BANK STABILIZATION <0.01 <0.01 60 35 TOTALS:<0.01 < 0.01 0.01 0.05 180 120 ATN Revised 3/31/05 DURHAM COUNTY PROJECT: SF-310008 If Causeways 1 and 2 are in place at the same time, they cannot block moe than 50% of the channnel. Causeways are to be placed one at a time to allow flow through remainder of channel. Total temporary channel impacts along the centerline of Flat River for Causeways 1 and 2 and bank stabilization is approximately 0 linear feet. Total permanent channel impacts along the centerline of Flat River for bank stabilization is approximately 120 linear feet. Total impacts from proposed piers is 180 square feet. SURFACE WATER IMPACTSWETLAND IMPACTS NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS SHEET 3 12/8/2014 * ** *** **** WETLAND PERMIT IMPACT SUMMARY