HomeMy WebLinkAbout20221539 Ver 1_Shoreline Stabilization_20221103Shoreline Stabilization Application Form
NORTH CAROLINA
Environmental Quality
15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization
FORM: SSGP 10-2013
DRAFT -NOT FOR USE AT THIS TIME
Submission Form
I. Applicant Information [15A NCAC 02H .0502(a)]
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all
mandatory questions are answered.
Primary Contact Email*
jackson4833041@aol.com
Please provide an email address for payment and requests for more information here.
Pre -Filing Meeting Date Request was 10/30/2022
submitted on: *
Owner Information:
Name: *
Email: *
Phone Number:
Mailing Address: *
David Jackson
jackson4833041@aol.com
(704)564-4664
(xxx)xxx-xxxx
Street Address
2910 Lake Shore Rd S
Address Line 2
City
Denver
Postal / Zip Code
28037
Is there an agent working on the project? * Yes
No
Project Information [15A NCAC 02H .0502(a) & (b)]
State / Province / Region
NC
Country
usa
Project Name: * 3074 lot 151
If your project has a formal name please use this. If your project does not have a formal name, please identify your project
by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses
any other names that have been used to identify the project in the past.
1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to
local landmarks such as towns, rivers, and roads. *
Upload File
Look up address
Property Address Lookup: *
Latitude: *
35.498200
Street Address
3074 Lake Shore Rd S
Address Line 2
City State / Province / Region
Denver NC
Postal / Zip Code Country
28037 USA
Longitude: *-80.978690
2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing,
structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below
Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under
section 12.normal pool lake level/normal water level*
SITE DIAGRAM 151.pdf 415.08KB
Please use the diagram at the link below:
https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard
stick, shovel handle, etc.)
BUFFER ZONE PHOTO 151.pdf 626.99KB
SHORELINE PHOTO 151.pdf 626.32KB
4. Location of the property (where work is to be conducted)
Nearest Town: * Denver
County: * Lincoln
Lake/ river/ ocean adjacent to Lake Norman
property:
Subdivisions name or site address: *
3074 Lake Shore Road S
Include phase/lot number
Directions to site: *
Hwy. 16 North, right on Lake Shore Rd S., Lot 151 is 1.5 miles on right
Please include road names and numbers, landmarks etc.
5. Describe the existing land use or condition of the site at the time of this application: *
New single family home on property
Residential, undeveloped, etc.
6. Property Size .487
Acres
7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or
why it is necessary):
Add additional rip rap to existing rip rap
8. How will the work be done? *
From Land
From Water
9. Total amount of disturbance below the normal pool lake level/ normal water level: *
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
none
square feet
10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land-
ward: *
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
550
square feet
11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to
be impacted:*
(number of trees, for instance)
No trees or vegetation to be impacted.
Only adding rip rap to existing rip rap
Sketch: SITE DIAGRAM 151.pdf 415.08KB
RIPARIAN BUFFER FORM 151.pdf 603.27KB
Application Fee:
Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The
application fee is as follows (pursuant to G.S. 143-215.3D):
o $240.00 for impacts to lake (below normal water level) of less than 1 acre
o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre
By digitally signing below, I certify that:
a I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best
of my knowledge and belief
a I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
a I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of
the NC General Statutes (the "Uniform Electronic Transactions Act");
a I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act");
a I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
o I intend to electronically sign and submit the Shoreline Stabilization online form.
Full Name:* David Jackson
Signature:
ee
Submittal Date: 10/30/2022
Initial Review
Is this accepted into the review process?* Yes No
Project Number:* 20221539 Version:* 1
Select Reviewer: * Alan Johnson:eads\adjohnsonl
Select Reviewing Office: Mooresville Regional Office - (704) 663-1699
Has payment been received?* No Payment Needed
Fee Received
Need Fee - send electronic notification
What amount is owed?* $240.00
$570.00
■
s
I
fi E ,
Lo{. 51l_3074L4kcyho,e{�a
? <,-r-Fe.r20)/ c.
3
F
y #
■
s
I
CATAWBA RIPARIAN BUFFER NOTIFICATION FORM
Project Name/address:'�_�')-t
iicksov\ Ca w s
Owner:
Print
Contractor/agent: _
C1G0 r C
[ure
County: llmca[ k-\
Print Signature
The approval is for the purpose and design described in your application. Impacts not indicated in the
application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC
02H ,0506 and 15A NCAC 02B .0243(8)]
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless
approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed.
Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)]
Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243
(6)]
Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved
by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)]
Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The
work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction
material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)]
Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater
discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)]
Acknowledgement of Notification
/y V-� , hereby state that I have been informed of the Catawba
Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved
by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be
taken such that the construction will be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting
materials.
Signature (owner): Date: l(/ , �� ` 2