Loading...
HomeMy WebLinkAbout20220861 Ver 1_Stream Impact Table with Culvert Lengths_20220912Section C.3. Stream Impacts Stream impact number Permanent (P) or Temporary (T) Type of impact Stream name Perennial (PER) or in (INT)? Type of jurisdiction Average stream width (feet) Existing culvert length (feet) New culvert length (feet) Impact length (linear feet) Stream impact area (Acres) S1 P Fill SM (UT to Thickety Creek) Per Corps 2.5 n/a n/a 31 0.0018 S2 P Culvert SL (UT to Thickety Creek) Per Corps 1.9 n/a 90 19.5 0.0009 S3 P Culvert Replacement SE (UT to Thickety Creek) Per Corps 2.9 40 147 127.5 0.0085 S4 P Culvert Replacement SP (UT to Thickety Creek) Per Corps 1.8 47 68 30 0.0012 S6 P Culvert Replacement SE (UT to Thickety Creek) Per Corps 1.7 30 48 28.5 0.0011 S7 P Culvert Replacement SP (UT to Thickety Creek) Per Corps 2.9 21 27 7.6 0.0005 S8 P Culvert Replacement SK (UT to Thickety Creek) Per Corps 3.0 34 55 33.4 0.0023 S9 P Bank Stabilization SK (UT to Thickety Creek) Per Corps n/a n/a 8 S10 P Bank Stabilization SE (UT to Thickety Creek) Per Corps n/a n/a 8 S11 P Bank Stabilization SP (UT to Thickety Creek) Per Corps n/a n/a 8 S12 P Bank Stabilization SP (UT to Thickety Creek) Per Corps n/a n/a 8 S13 P Bank Stabilization SS (UT to Thickety Creek) Per Corps n/a n/a 8 Total Permanent (Road Crossing) Total Permanent (Bank Stabilization) Total 278 0.017 40 n/a 318 0.017