HomeMy WebLinkAbout20220861 Ver 1_Stream Impact Table with Culvert Lengths_20220912Section C.3. Stream Impacts
Stream impact
number
Permanent (P) or
Temporary (T)
Type of impact
Stream name
Perennial
(PER) or
in
(INT)?
Type of
jurisdiction
Average
stream
width (feet)
Existing
culvert
length (feet)
New culvert
length (feet)
Impact
length
(linear
feet)
Stream
impact
area
(Acres)
S1
P
Fill
SM (UT to Thickety Creek)
Per
Corps
2.5
n/a
n/a
31
0.0018
S2
P
Culvert
SL (UT to Thickety Creek)
Per
Corps
1.9
n/a
90
19.5
0.0009
S3
P
Culvert Replacement
SE (UT to Thickety Creek)
Per
Corps
2.9
40
147
127.5
0.0085
S4
P
Culvert Replacement
SP (UT to Thickety Creek)
Per
Corps
1.8
47
68
30
0.0012
S6
P
Culvert Replacement
SE (UT to Thickety Creek)
Per
Corps
1.7
30
48
28.5
0.0011
S7
P
Culvert Replacement
SP (UT to Thickety Creek)
Per
Corps
2.9
21
27
7.6
0.0005
S8
P
Culvert Replacement
SK (UT to Thickety Creek)
Per
Corps
3.0
34
55
33.4
0.0023
S9
P
Bank Stabilization
SK (UT to Thickety Creek)
Per
Corps
n/a
n/a
8
S10
P
Bank Stabilization
SE (UT to Thickety Creek)
Per
Corps
n/a
n/a
8
S11
P
Bank Stabilization
SP (UT to Thickety Creek)
Per
Corps
n/a
n/a
8
S12
P
Bank Stabilization
SP (UT to Thickety Creek)
Per
Corps
n/a
n/a
8
S13
P
Bank Stabilization
SS (UT to Thickety Creek)
Per
Corps
n/a
n/a
8
Total Permanent (Road Crossing)
Total Permanent (Bank Stabilization)
Total
278
0.017
40
n/a
318
0.017