Loading...
HomeMy WebLinkAboutNC0047384_Staff Comments_20170615Grzyb, Julie A/c oo�73'‘.4 From: Sent: To: Cc: Subject: Attachments: John — Templeton, Mike Thursday, June 15, 2017 12:59 PM Hennessy, John Grzyb, Julie; Rodriguez, Teresa greensboro soc calcs 47384 alt SOC calcs.xlsx (`Z C�s}�orh� G c ce 1,,,s Loco I didn't find the modeling files for TZO nor any of the historic WLAs (which seem to be missing entirely from the permit files). So we would have to reconstruct a model to evaluate the discharge in any detail. That's not likely to happen anytime soon. However, the limits we set for 56 MGD represent the same ultimate BOD load as the limits for 40 MGD. So we can calculate the equivalent limits using the City's actual WW flows for an SOC. The attached spreadsheet does that. I modified Martie's spreadsheet to include the revised calculations. Parts of her sheet (rows for NB and for her totals) that aren't used in the new calcs are hidden, just to clean up the page, and the new calcs are shown as green text. The resulting limits for BOD and ammonia are lower than what Martie proposed. The BOD limits are about 3/4 of hers, and the ammonia limits are about 1/3 of hers. Limits for TSS and fecals would not change. Basis of the Calculations In modeling water quality impacts of oxygen -demanding wastes, the allowable loads are evaluated in terms of ultimate BOD (BODu) and are then converted back to the equivalent BODs and NH3-N concentrations (or masses) before applying as limits. The following conversion factors are involved, and you can see can see them in the formulas for individual cells in the spreadsheet: Units of NBOD exerted per unit of NH3-N = 4.5 (displayed as c.NBOD.NH3N in the formulas) (NBOD is ultimate nitrogenous BOD) Ratio of BODu to BODs = 2.0 (c.BODu.BODS) Ratio of BODs to CBODs = 30/25 = 1.2 (c.BOD5.CBOD5) So, putting it all together, BODu = [ CBODs * (BODs/CBODs) * (BODu/BODs) ] + [ NH3-N * NBOD/ NH3-N Flows I looked at the plants' flow records from 2012 on to see if the last five months are suitable for these calculations. In that time period, January through April have had the highest combined flows, so using Jan -Apr 2017 (or Jan -May 2017, as Martie proposes) to calculate interim limits seems reasonable. Let me know if you have any questions. — Mike T Michael E. Templeton, P.E. Wastewater Permitting Section Division of Water Resources Department of Environmental Quality Office: 9ch Floor, Archdale Building 512 North Salisbury Street, Raleigh, NC 27604 Mailing Address: 1617 Mail Service Center, Raleigh, NC 27699-1617 Office: 919-807-6402 mike.templeton(alncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 City of Greensboro POTWs - WA Bubble Permit Limit Calculations using Actual Flows Bubble limit (mg/I)_ _ 13.0 POTW Parameter Permitted Flow WA Permit Limit (MGD) Summer (mg/I) Permitted Pounds Equivalent BODu Actual Combined (lb/d) Flow (MGD) TZO CBOD 40 6.0 2,002 4,804 ENTER BELOW T20' CBOD 56.0 6.0 2,802 6,725 33.35 10.1 POTW Parameter Permitted Flow (MGD) WA Permit Limit Winter (mg/I) Permitted Pounds Equivalent BODu (Ib/d) TZ0 CBOD 40 12.0. 4,003 9,608 25.9 TZO' CBOD 56.0 12.0 5,604 13,451 20.1 POTW Parameter Permitted Flow (MGD) WA Permit Limit Summer (mg/I) Permitted Pounds Equivalent BODu (lb/d) TZO NH3-N 40 6.0 2,002 9,007 13.0 TZO' NH3-N 56.0 2.46 1,149 5,170 4.1 Permitted Flow (MGD) POTW Parameter WA Permit Limit Winter (mg/I) Permitted Equivalent BODu Pounds (Ib/d) TZ0 NH3-N 40 12.0 4,003 18,014 25.9 TZO' NH3-N 56.0 4.92 2,298 10,340 8.3 Summer Loads TZO BODu 40 13,811 TZO' BODu 56 11,896 Winter Loads TZO BODu 40 27,622 TZO' BODu 56 23,791 POTW Parameter Permitted Flow (MGD) WA Permit Limit Year- Round (mg/I) Permitted Pounds TZ0 TSS _ 40 45 15,012 75.6 TZO' TSS 56.0 415.0 WA Permit Limit Year -Round (col/100) 45.0 POTW Parameter Permitted Flow (MGD) Permitted Pounds TZO Fecal 40 400 N/A TZO' Fecal Actual Flow (MGD) 56.0 400.0 400.0 Combined Flow (MGD) POTW NB 6.907 TZO 27.598 Jan 2017 34.505 NB 6.916 TZO 23.987 Feb 2017 30.903 NB 6.770 TZO 24.875 Mar 2017 31.645 NB 6.907 TZO 29.22 Apr 2017 36.127 NB 7.17 TZO 26.39 May 2017 33.56 AVG 33.348 1/1 47384 alt SOC calcs.xlsx, WA Limits 8/1/2017, 3:44 PM City of Greensboro POTWs - MA Bubble Permit Limit Calculations using Actual Flows POTW Parameter Permitted Flow (MGD) MA Permit Limit Summer (mg/I) Permitted Pounds Equivalent BODu (Ib/d) Actual Combined Flow (MGD) Bubble limit (mg/I) TZO CBOD 40 4.0 1,334 3,203 ENTER BELOW 8.6 TZO' CBOD 56.0 4.0 1,868 4,484 33.35 6.7 POTW Parameter Permitted Flow (MGD) MA Permit Limit Winter (mg/l) Permitted Pounds Equivalent BODu (lb/d) TZO CBOD 40 8.0 2,669 6,405 17.3 TZO' CBOD 56.0 8.0 3,736 8,967 __ 13.4 POTW Parameter Permitted Flow MA Permit Limit (MGD) Summer (mg/I) Permitted Equivalent BODu Pounds (lb/d) TZO NH3-N 40 2.0 667 3,002 4.3 _ 1.4 TZO' NH3-N 56.0 0.82 383 1,723 POTW Parameter Permitted Flow (MGD) MA Permit Limit Winter (mg/I) Permitted Pounds Equivalent BODu (Ib/d) TZ0 NH3-N 40 4.0 1,334 6,005 _ 8.6 TZO' NH3-N 56.0 1.64 766 3,447 _ 2.8 Summer Loads - Comparison TZO BODu 40 6,205 TZO' BODu 56 6,207 Winter Loads - Comparison TZ0 BODu 40 12,410 TZO' BODu 56 12,414 POTW Parameter Permitted Flow (MGD) MA Permit Limit Year- Round (mg/I) Permitted Pounds TZO TSS 40 30 10,008 50.4 TZO' TSS 56.0 30.0 30.0 POTW Parameter Permitted Flow (MGD) MA Permit Limit Year -Round (col/100) Permitted Pounds TZ0 Fecal 40 200 N/A TZO' Fecal 56.0 200.0 200.0 T Actual Flow (MGD) Combined Flow (MGD) POTW NB 6.907 TZ0 27.598 - Jan 2017 34.505 NB 6.916 TZ0 23.987 Feb 2017 30.903 NB 6.770 TZ0 24.875 Mar 2017 31.645 NB 6.907 TZ0 29.22 Apr 2017 36.127 NB 7.17 TZO May 2017 26.39 33.56 1/1 47384 alt SOC calcs.xlsx, MA Limits 8/1/2017, 3:44 PM