Loading...
HomeMy WebLinkAbout310191_Application_20221025 (2)State of North Carolina Department of Environment and Natural Resources Division of Water Quality Animal Feeding Operations Permit Application Form (THIS FOR1tf MAY BE PHOTOCOPIED FOR USE AS AN ORIGINAL) State General Permit - Existing Animal Waste Operations 1. GENERAL INFORMATION: 1.1 Facility name: Thomas & Donna Smith Farm 1.2 Print Land Owner's name: Donna Smith 1.3 Mailing address: 214 Tapp Farm Rd. City, State: Pink Hill, NC Zip: 28508 Telephone number (include area code): (252 ) 560 - 6 33 P. 1.4 Physical address: 214 Tapp Farm Rd. City, State: Pink Hill, NC Zip: 285 a, Telephone number (include area code): ( ) 1.5 County where facility is located: Duplin 1.6 Facility location (directions from nearest major highway, using SR numbers for state roads): 214 Tapp Fann Rd 1.7 Farm Manager's name (if different from Land Owner): 1.8 Lessee's / Integrator's name (if applicable; circle which type is listed): Smithfield HP 1.9 Facility's original start-up date: Date(s) of facility expansion(s) (if applicable): 2. OPERATION INFORMATION: 2.1 Facility number: 31-0191 2.2 Operation Description: Please enter the Design Capacity of the system. The "No. of Animals" should be the maximum number for which the waste management structures were designed. Type of Swine No. of Animals Type of Poultry No. of Animals Type of Cattle No. of Animals ❑ Wean to Feeder ❑ Layer ['Beef Brood Cow +{i Feeder to Finish 3140 ❑ Non -Layer ❑ Beef Feeder ❑ Farrow to Wean (# sow) ❑ Turkey- ❑ Beef Stocker Calf ❑ Farrow to Feeder (# sow) ❑ Turkey Poults ❑ Dairy Calf ❑ Farrow to Finish (# sow) ❑ Dairy- Heifer ❑ Wean to Finish (# sow) ❑ Dry Cow ❑ Gilts ❑ Milk Cow ❑ Boar/Stud ❑ Other Type of Livestock on the farm: No. of Animals: FORM: AWO-STATE-G-E 1/10/06 Page 1 of 5 2.3 Acreage cleared and available for application (excluding all required buffers and areas not covered by the application system): 43.78 Required Acreage (as listed in the CAWMP): 43.78 2.4 Number of lagoons: 2 Total Capacity (cubic feet): 1 19823 Required Capacity (cubic feet): 521.215 Number of Storage Ponds: Total Capacity (cubic feet): Required Capacity (cubic feet): 2.5 Are subsurface drains present within 100' of any of the application fields? 2.6 Are subsurface drains present in the vicinity or under the waste management system? 2.7 Does this facility meet all applicable siting requirements? 3. REQUIRED ITEMS CHECKLIST: YES or YES or circle one) (circle one) or NO (circle one) Please indicate that you have included the following required items by signing your initials in the space provided next to each item. 3.1 One completed and signed original and two copies of the application for State General Permit - Animal Waste Operations; 3.2 Three copies of a general location map indicating the location of the animal waste facilities and field locations where animal waste is land applied and a county road map with the location of the facility indicated; 3.3 Three copies of the entire Certified Animal Waste Management Plan (CAWMP). if the facility does not have a CAWMP, it must be completed prior to submittal of a permit application for animal waste operations. A ants Initials J-tt The CAWMP must include the following components. Some of these components may not have been required at the time the facility was certified but should be added to the CAWMP for permitting purposes: 3.3.1 The Waste Utilization Plan (WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility 3.3.2 The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) 3.3.3 A map of every field used for land application 3.3.4 The soil series present on every land application field 3.3.5 The crops grown on every land application field 3.3.6 The Realistic Yield Expectation (RYE) for every' crop shown in the WUP 3.3.7 The PAN applied to every land application field 3.3.8 The waste application windows for every crop utilized in the WUP 3.3.9 The required NRCS Standard specifications 3.3.10 A site schematic 3.3.1 1 Emergency Action Plan 3.3.12 insect Control Checklist with chosen best management practices noted 3.3.13 Odor Control Checklist with chosen best management practices noted 3.3. 14 Mortality Control Checklist with the selected method noted 3.3.15 Lagoon/storage pond capacity documentation (design, calculations, etc.); please be sure to include any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility 3.3.16 Operation and Maintenance Plan If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. (Composting, waste transfers. etc.) 4. APPLICANT'S CERTIFICATION: FORM: AWO-STATE-G-E 1/10/06 Page 2 of 5 (Land Owner's name listed in question 1.2), attest that this application for `A—Nt-) ,c' —' r TAR--5m t je �.� O. C y� (Facility name listed in question 1.1) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be retu> to me as incompl Signature Date) ! D 4 ( \c 5. MANAGER'S CERTIFICATION: (complete only if different from the Land Owner) I, (Manager's name listed in question 1.6), attest that this application for (Facility name listed in question 1 . ] ) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. Signature Date THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER QUALITY AQUIFER PROTECTION SECTION ANIMAL FEEDING OPERATIONS UNIT 1636 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1636 TELEPHONE NUMBER: (919) 733-3221 FAX NUMBER: (919) 715-6048 6. SURFACE WATER CLASSIFICATION: FORM: AWO-STATE-G-E 1/10/06 Page 3 of 5 This form must be completed by the appropriate DWQ regional office and included as a part of the project submittal information. INSTRUCTIONS TO NC PROFESSIONALS: The classification of the downslope surface waters (the surface waters that any overflow from the facility would flow toward) in which this animal waste management system will be operated must be determined by the appropriate DWQ regional office. Therefore, you are required, prior to submittal of the application package, to submit this form, with items I through 6 completed. to the appropriate Division of Water Quality Regional Aquifer Protection Supervisor (see page 6 of 10). At a minimum, you must include an 8.5" by I" copy of the portion of a 7.5 minute USGS Topographic Map which shows the location of this animal waste application system and the downslope surface waters in which they will be located. Identify the closest downslope surface waters on the attached map copy. Once the regional office has completed the classification, reincorporate this completed page and the topographic map into the complete application form and submit the application package. 6.1 Farm Name: 6.2 Name & complete address of engineering firm: Telephone number: ( ) 6.3 Name of closest downslope surface waters: 6.4 County(ies) where the animal waste management system and surface waters are located 6.5 Map name and date: 6.6 NC Professional's Seal (If appropriate), Signature, and Date: TO: REGIONAL, AQUIFER PROTECTION SUPERVISOR Please provide me with the classification of the watershed where this animal waste management facility will be or has been constructed or field located, as identified on the attached map segment(s): Name of surface waters: Classification (as established by the Environmental Management Commission): Proposed classification, if applicable: Signature of regional office personnel: (All attachments must be signed) Date: FORM: AWO-STATE-G-E 1/10/06 Page 4 of 5 DIVISION OF WATER QUALITY REGIONAL OFFICES (9/05) Asheville Regional APS Supervisor 2090 U.S. Highway 70 Swannanoa, NC 28778 (828) 296-4500 Fax (828) 299-7043 Avery Macon Buncombe Madison Burke McDowell Caldwell Mitchell Cherokee Polk Clay Rutherford Graham Swain Haywood Transylvania Henderson Yancey Jackson Fayetteville Regional APS Supervisor 225 Green Street, Suite 714 Fayetteville, NC 28301-5094 (910)486-1541 Fax (910) 486-0707 Anson Moore Bladen Richmond Cumberland Robeson Harnett Sampson Hoke Scotland Montgomery Winston-Salem Regional APS Supervisor 585 Waughtown Street Winston-Salem, NC 27107 (336) 771-5000 Fax (336) 771-463 l Alamance Alleghany Ashe Caswell Davidson Davie Forsyth Guilford Rockingham Randolph Stokes Surry Watauga Wilkes Yadkin Washington Regional APS Supervisor 943 Washington Square Mall Washington, NC 27889 (252) 946-6481 Fax (252) 975-3716 Beaufort Jones Bertie Lenoir Camden Martin Chowan Pamlico Craven Pasquotank Currituck Perquimans Dare Pitt Gates Tyre11 Greene Washington Hertford Wayne Hyde Mooresville Regional APS Supervisor 610 East Center Avenue Mooresville, NC 28115 (704) 663-1699 Fax (704) 663-6040 Alexander Lincoln Cabarrus Mecklenburg Catawba Rowan Cleveland Stanly Gaston Union Iredell Raleigh Regional APS Supervisor 1628 Mail Service Center Raleigh, NC 27699-1628 (919) 791-4200 Fax (919) 571-4718 Chatham Nash Durham Northampton Edgecombe Orange Franklin Person Granville Vance Halifax Wake Johnston Warren Lee Wilson Wilmington Region APS Supervisor 127 Cardinal Drive Extension Wilmington, NC 28405-3845 (910) 796-7215 Fax (910) 350-2004 Brunswick Carteret Columbus Duplin New Hanover Onslow Pender FORM: AWO-STATE-G-E 1/10/06 Page 5 of 5 Animal Waste Management Plan Certification (Please type or print all information that does not require a signature) 'Existing for New or Expanded (please circle one) General Information: Name of Farm: Owner(s) Name: Donna Smith Mailing Address: 214 Tapp Farm Rd Pink Hill Farm Location Thomas & Donna Smith Farm al 5 "i ce County Farm is located in: Facility No: 31-191 Phone No: 252-560-6332 Duplin Latitude and Longitude: 35 01' 15" / 77 48' 31" Integrator: Murphy Brown Please attach a copy of a county road map with location identified and described below (Be specific: road names, directions, milepost, etc.): 214 Tapp Farm Rd. Pink Hill Operation Description: Type of Swine No. of Animals Type of Poultry [] Wean to Feeder 0 Layer Feeder to Finish 3140 Pullets 0 Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Finish Gilts Boars No. of Animals Type of Cattle No. of Animals n Dairy 0 Beef Expand►rrg Operation ,Only Previous Design Capacity Additional Design Capacity Total Design Capacity Acreage Available for Application: Number of Lagoons / Storage Ponds: Are subsurface drains present on the farm: 43.78 2 Yes Required Acreage: 43.78 Total Capacity: 119,823 Cubic Feet (ft3) or No (please circle one) If YES: are subsurface drains present in the area of the LAGOON or SPRAY FIELD (please circle one) Owner / Manager Agreement (we) verify that all the above information is correct and will be updated upon changing. I (we) understand the operation and maintenance procedures established in the approved animal waste management plan for the farm named above and will implement these procedures. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental Management before the new animals are stocked. I (we) understand that there must be no discharge of animal waste from the storage or application system to surface waters of the state either directly through a man-made conveyance or from a storm event Tess severe than the 25 - year, 24 - hour storm and there must not be run-off from the application of animal waste. I (we) understand that run-off of pollutants from lounging and heavy use areas must be minimized using technical standards developed by the Natural Resources Conservation Service. The approved plan will be filed at the farm and at the office of the local Soil and Water Conservation District. I (we) know that any modification must be approved by a technical specialist and submitted to the Soil and Water Conservation District prior to implementation. A change in land ownership requires written notification to DEM or a new certification (if the approved plan is changed) within 60 days of a title transfer. Name of Land er: Donna ith Signature: I Date: X f�J� 1 Name of Manager (if different from owner): Signature: Date AWC -- August 1, 1997 1 Technical Specialist Certification I. As a technical specialist designated by the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 6F .0005. I certify that the animal waste management system for this farm named above has an animal waste management plan that meets or exceeds standards and specifications of the Division of Environmental Management (DEM) as specified in 15A NCAC 2H.201 and the USDA -Natural Resources Conservation Service (NRCS) and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2H.0217 and 15A NCAC 6F .0001.0005. The following elements are included in the plan as applicable. While each category designates a technical specialist who may sign each certification (SD, SI, WUP, RC, I), the technical specialist should only certify parts for which they are technically competent. 11. Certification of Design A) Collection. Storage, Treatment System Check fhe�appropriate box I vl/ Existing facility without retrofit (SD or WUP) Storage volume is adequate for operation capacity: storage capability consistent with waste utilization requirements. New, expanded or retrofitted facility (SD) Animal waste storage and treatment structures, such as but not limited to collection systems, lagoons and ponds, have been designed to meet or exceed the minimum standards and specifications. Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy -Brown, LLC Date Work Completed: Address (Agencl(): P.O. Box 856, Warsaw, NC 2839€ Phone No.: (910) 293-3434 Signature: k s ,� Date: B) Land Application Site (WUP) The plan provides for minimum separations (buffers); adequate amount of land for waste utilization; chosen crop is suitable for waste management hydraulic and nutrient loading rates. Name of Technical Specialist (Please Print): Toni King Affiliation Murphy -Brown, LLC Date Work Completed: Address (Ag n ): P.O. Box 856 Warsaw, NC 2839E Phone No.: (910) 293-3434 Signature: n,;Date: VC) C) Runoff Controls from Exterior Lots Check the appropriate box Facility without exterior lots (SD or WUP or RC) This facility does not contain any exterior lots. 0 Facility with exterior lots (RC) Methods to minimize the run off of pollutants from lounging and heavy use areas have been designed in accordance with technical standards developed by NRCS. Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy -Brown, LLC Date Work Completed: Address (Agen ): P.O. Box 56, Warsaw, NC 2839E Phone No. (910) 293-3434 Signature: Date: \�- \y- AWC -- August 1, 1997 2 D). Application and Handling Equipment Check th appropriate box Existing or expanding facility with existing waste application equipment (WUP or I) Animal waste application equipment specified in the plan has been either field calibrated or evaluated in accordance with existing design charts and tables and is able to apply waste as necessary to accommodate the waste management plan: (existing application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates. A schedule for timing of applications has been established; required buffers can be maintained and calibration and adjustment guidance are contained as part of the plan). New, expanded or existing facility without existing waste application equipment for spray irrigation. (I) Animal waste application equipment specified in the plan has been designed to apply waste as necessary to accommodate the waste management plan: (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates; a schedule for timing of applications has been established: required buffers can be maintained: calibration and adjustment guidance are contained as part of the plan). New, expanded or existing facility without existing waste application equipment for land spreading not using spray irrigation. (WUP or I) Animal waste application equipment specified in the plan has been selected to apply waste as necessary to accommodate the waste management plan: (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates: a schedule for timing of applications has been established; required buffers can be maintained: calibration and adjustment guidance are contained as a part of the plan). Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy -Brown, LLC Date Work Completed: Address (Agency6 P.O. Box 856, Warsaw, NC 2839€ Phone No.: (910) 293-3434 Signature: ` evv: . , Date: y �Z—L E) Odor Control, Insect Control, Mortality Mt7n—a4rnent and Emergency Action Plan (SD. SI, WUP, RC or I) The waste management plan for this facility includes a Waste Management Odor Control Checklist, an Insect Control Checklist, a Mortality Management Checklist and an Emergency Action Plan. Sources of both odors and insects have been evaluated with respect to this site and Best Management Practices to Minimize Odors and Best Management Practices to Control Insects have been selected and included in the waste management plan. Both the Mortality Management Plan and the Emergency Action Plan are complete and can be implemented by this facility. Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy -Brown, LLC Date Work Completed: Address (AgencyjQ P.O. Box 856, Wa saw, NC 2839E Phone No.: (910) 293-3434 Signature: J Q� Date: 1 F) Written Notice of New or Expanding Swine Fa The following signature block is only to be used for new or expanding swine farms that begin construction after June 21, 1996. If the facility was built before June 21, 1996, when was it constructed or last expanded I (we) certify that I (we) have attempted to contact by certified mail all adjoining property owners and all property owners who own property located across a public road, street or highway from this new or expanding swine farm. The notice was in compliance with the requirements of NCGS 106-805. A copy of the notice and a list of property owners notified is attached. Name of Land Owner: Signature: Date: Name of Manager (if different from owner): Signature: Date AWC -- August 1, 1997 3 Address (Agency): Signature: 111. Certification of Installation A) Collection, Storage, Treatment Installation New, expanded or retrofitted facility (SI) Animal waste storage and treatment structures, such as but not limited to lagoons and ponds, have been installed in accordance with the approved plan to meet or exceed the minimum standards and specifications. For existing facilities without retrofits, no certification is necessary. Name of Technical Specialist (Please Print): Affiliation Date Work Completed: Phone No.: Date: B) Land Application Site (WUP) Check the appropriate box The cropping system is in place on all land as specified in the animal waste management plan. Conditional Approval: all required land as specified in the plan is cleared for planting: the cropping system as specified in the waste utilization plan has not been established and the owner has committed to establish the vegetation as specified in the plan by (month/day/year); the proposed cover crop is appropriate for compliance with the waste utilization plan. Also check this box if appropriate If the cropping system as specified in the plan can not be established on newly cleared land within 30 days of this certification, the owner has committed to establish an interim crop for erosion control: Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy -Brown, LLC Date Work Completed: Address (Agen): P.O. Box 856, Warsaw, NC 2839E Phone No.: (910) 293-3434 Signature: ��in� ) Date: 1 0 - This following signature block is only to be used when the box for conditional approval in III. B I (we) certify that I (we) have committed to establish the cropping system as specified in my (our) waste utilization plan, and if appropriate to establish the interim crop for erosion control, and will submit to DEM a verification of completion from a Technical Specialist within 15 calendar days following the date specified in the conditional certification. I (we) realize that failure to submit this verification is a violation of the waste management plan and will subject me (us) to an enforcement action from DEM. Name of Land Owner: Signature: Date: Name of Manager (if different from owner): Signature: Date AWC -- August 1, 1997 4 C) Runoff Controls from Exterior Lots (RC) Facility with exterior lots Methods to minimize the run off of pollutants from lounging and heavy use area have been installed as specified in the plan. For facilities without exterior lots, no certification is necessary. Name of Technical Specialist (Please Print): Affiliation Date Work Completed: Address (Agency): Signature: Phone No.: Date: D) Application and Handling Equipment Installation (WUP or I) Check the appropriate b Animal waste application and handling equipment specified in the plan is on site and ready for use; calibration and adjustment materials have been provided to the owners and are contained as part of the plan. Animal waste application and handling equipment specified in the plan has not been installed but the owner has produced leasing or third party application and has provided a signed contract: equipment specified in the contract agrees with the requirements of the plan: required buffers can be maintained: calibration and adjustment guidance have been provided to the owners and are continued as part of the plan. 0 Conditional approval: Animal waste application and handling equipment specified in the plan has been purchased and will be on site and installed by (month/day/year); there is adequate storage to hold the waste until the equipment is installed and until the waste can be land applied in accordance with the cropping system contained in the plan; and calibration and adjustment guidance have been provided to the owners and are contained as part of the plan. Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy -Brown, LLC Date Work Completed: Address (Agency): P.O. Box 856, Warsaw, NC 2839E Phone No. (910)293-3434 Signature: � � Date: 1,0 - 1 L►` -Z�- The following signature block is only use hen the box for conditional approval in III D above has been checked. I (we) certify that I (we) have committed to purchase the animal waste application and handling equipment as specified in my (our) waste management plan and will submit to DEM a verification of delivery and installation from a Technical Specialist within 15 days following the date specified in the conditional certification. I (we) realize that failure to submit this verification is a violation of the waste management plan and will subject me (us) to an enforcement action from DEM. Name of Land Owner: Signature: Date: Name of Manager (if different from owner): Signature: Date E) Odor Control, Insect Control and Mortality Management (SD, SI, WUP, RC or I) Methods to control odors and insects as specified in the Plan have been installed and are operational. The mortality management system in the Plan has also been installed and is operational. Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy -Brown, LLC Date Work Completed: Address (Agen ): P.O. Box 85 arsaw, NC 2839E Phone No.: (910)293-3434 Signature: tZ) . Date: 13- `- AWC -- August 1, 1997 5 Please return the completed form to the Division of Water Quality at the following Address: Department of Environment Health and Natural Resources Division oil Water Quality Water Quality Section, Compliance Group P.O. Box 29535 Raleigh, NC 27626-0535 Please remember to submit a copy of this form along with the complete Animal Waste Management Plan to the local Soil and Water Conservation District Office and to keep a copy in your files with your Animal Waste Management Plan. AWC -- August 1, 1997 6 Murphy -Brown, LLC 10/14/2022 NUTRIENT UTILIZATION PLAN 2822 Hwy 24 West P.O. Box 856 Warsaw, NC 28398 Grower(s): Donna Smith Farm Name: Thomas & Donna Smith Farm Facility 31-191 County: Dublin Permit Capacity: Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder Wean to Finish Feeder to Finish Gilts Boars 3140 Storage Structure: Storage Period: Application Method: Anaerobic Lagoon >180 clays Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWR regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1 of 11 This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, ft3, tons, etc.): Capacity Type Waste Produced per Animal Total 3140 Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder Wean to Finish Feeder to Finish Gilts Boars 3203 gal/yr 3861 gallyr 10478 gallyr 191 gallyr 776 gal/yr 927 gal/yr 1015 gal/yr 2959 gallyr gal/yr gal/yr gal/yr gal/yr gal/yr 2,910,780 gallyr gallyr gallyr Total 2,910,780 gallyr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (Ibs): Capacity Type Nitrogen Produced per Animal Total 3140 Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder Wean to Finish Feeder to Finish Gilts Boars 3.84 lbs/yr 6.95 lbs/yr 18.86 lbs/yr 0.34 Ibslyr 1.4 lbs/yr 1.67 lbs/yr 1.83 lbs/yr 5.33 lbs/yr lbs/yr lbs/yr lbs/yr lbs/yr lbs/yr 5,244 lbs/yr lbs/yr lbs/yr Total 5,244 Ibslyr Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: Total N Required 1st Year: Total N Required 2nd Year: Average Annual Nitrogen Requirement of Crops: Total Nitrogen Produced by Farm: Nitrogen Balance for Crops: 43.76 11233.76 0.00 11,233.76 5,243.80 (5,989.96) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility. 2 of 11 Reception Area Specifications Total Ibs N Utilized a(ommnm m Nuim rrWrNrr m a -ni66c6 N to m Totals: 43.78 9044. 764 2189 11233.761 • ry N N N N N 2nd Crop Time to 2nd Crop 2nd Crop Lbs N1Ac Lbs N Total Ibs N Code Apply Yield Ibs N/Unit Residual /Ac Utilized r N N M N a (0 (0 (() N N N 0 0 0 a N N M a N 0 0 10 4n 0 0 0 ul ul (n 0 0 10 0 0 (0 4l 000000000 ( ( 4l 4l 47 0 In (n In as ¢ n a W 0 Sept -April Sept -April Sept -April Sept -April Sept -April Sept -April Sept -April YYNCYYYYY Tract Held Irrigated Soil 1st Crop Time to 1st Crop lst Crop Lbs NIAc Lbs N Total Ibs N Acreage Type Code Apply Yield Ibs NlUnit Residual /Ac Utilized M a n a 0) m om-rco o rl (n m r CDXiOD 0) m r .a v (ri (0 m m r - CO(h (n N 0 0 O N N n 0 0 0 N N r 0 N 0 0 0 0 N N 0 0 0 0 N N ul M u) (n .1 (0(0 u) (n mom 41 41 (n o 60666666 o a o 0 0 0 0 a m m m m Mar -Sept Mar -Sept Mar -Sept as v m W N Mar -Sept Mar -Sept mmmmmmmmm m o ¢ LL 0 0 LL LL 0 LL 0 sa a Z m m Z Z ONWWV,Frnrg W a )0 a M M a ( (0 4 O N GO (0 1n N N0)a a a a a u)(0Am a a a a n. (n (n m m m(0(o(10((0(nmm (n 0 (n (n w m in 4) m u) (n v m m (n u) a a 0 10 (n (n Reception Area Specifications UIdz O ij 1 2nd Crop Time to 2nd Crop 2nd Crop Lbs NIAc Lbs N Total Ibs N Code Apply Yield Ibs N)Unit Residual IAc Utilized O O O a 12 Time to 1st Crop 1st Crop Lbs NIAc Lbs N Total Ibs N Apply Yield Ibs NlUnit Residual IAc Utilized cl This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. in the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definitely interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fail. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code A B C B/C D E F G H J K L M N 0 P S CC Crop Barley Grazed Hybrid Bermudagrass Hybrid Bermudagrass Hay Comb. Hybrid Bermudagrass Corn - Grain Corn - Silage Cotton Grazed Fescue Fescue Hay Oats Rye Grazed Overseed Overseed Hay Grain Sorghum Wheat Soybean Pine Trees Small Grain Cover Crop Description -Harvested As Grain Crop Pasture/Grazed Hay Graze/Hay Combination Grain Crop Silage Cotton Lint Pasture/Grazed Hay Grain Crop Grain Crop Pasture/Grazed (Seeded in Bermudagrass) Hay (Seeded in Bermudagrass) Grain Crop Grain Crop Grain Crop Pine Trees Grain Crop/ Hay (After Grain Crop) Not Harvested; Burned/Disked In Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4 of 11 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder Wean to Finish 3140 Feeder to Finish Gilts Boars PAN/yr/animal Farm Total/yr 0.8 0.96 3.9 0.07 0.27 0.34 0.39 0.55 1067.6 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 1067.6 pounds of plant available nitrogen per year and will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 5338 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 17 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre, you will need 42.704 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. *This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5 of 11 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type Crop inlhr * inches T5685 P1 AuB B 0.6 1 T5685 P2 FoA B 0.5 1 T5685 P3 FoA B 0.5 1 T5685 P4 FoA B 0.5 1 T5685 P5 FoA B 0.5 1 T5685 P6 FoA B 0.5 1 T5684 P7 NbB B 0.4 1 T5684 P8 NbB B 0.4 1 T5684 P9 NbB B 0.4 1 6 of 11 Additional Comments: 10/14/2022 This NUP has been revised to show the sale of what was originally the Donna Smith Farm. P1 through P9 will stay with this facility and P10 through P13 will be on the other facility. P14 through P17 will be under a waste agreement with the new owner. Any/all fields listed as "Optional Fields" are not required to be in any of the crops listed in this plan unless they are actively being applied to or will be applied to. 7 of 11 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: Owner: Manager: Owner/Manager Agreement: Thomas & Donna Smith Farm Facility 31-191 Donna Smith I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWR before the new animals are stocked. I/we understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWR upon request. Name of Facility Owner: Signature: Donna Smith Name of Manager (if different from owner): Signature: A �-r /.plat iqk ate Name of Technical Specialist: Affiliation: Address: Signature: Date Toni W. King Smithfield Hog Production Division 2822 Hwy 24 West, PO Drawer 856 Warsaw, NC 28398 Telephone: (910) 293-3434 \C)-- Z Date 8 of 11 NUTRIENT UTILIZATION PLAN 1 2 3 REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recieving crop type, or available land. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5 6 7 8 Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See "Weather and Climate in North Carolina" for guidance). Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9of11 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. 13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 10 of 11 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18 If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 60 days of utilization and soil shall be tested at least once every three yeares at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 11 of 11 , co 476 FT. 3.63 PO 7175 PI 8 04 Operator: = Leland Smith TS2 County:=Duplin Date: = 11/27/05 Dist.to nearest residence (other than owner): 1500 ft. sows (farrow to finish):=== sows (farrow to feeder): eder): head (finishing only): 1000 sows (farrow to wean):----- '- > head (wean to feeder): Ave. Live Weight for other operations(Ibs.)=> Storage volume for sludge accum. (cu. ft.):=> Treatment Volume (min, 1 cu. ft./lb.) > 1.0 25 Year - 24 Hour Rainfall (in.) > 0.0 Rainfall in excess of evaporation (in.).- > 0.0 Drainage area of buildings & lots (sq. ft.)=> Volume of wash water (gallons/day) Temporary storage period (days) > 180 Freeboard (ft.): 1.0 Side slopes (inside lagoon):— > 1.5 : 1 Inside top length (ft.). > 200.0 inside top width (ft.): 141.6 Top of dike elevation (ft.): > 56.0 Bottom of lagoon elevation (ft.): > 43.9 Seasonal high water table(SHWT) elev.(ft.):=> 38.0 Total required volume: - 167968 cu. ft. Actual design volume: - 245156 cu. ft. Pas e ermovi Tee.-fInc44 Slitj� / inE At.E tri 3.If- Ic-F tric slvdJe fo b, rem. b ver,160A4 rLED -A-1- pet 116 01-4- tpexhvte,11- 1-Y- Mee„4lid—rAic,k4afi No - -1e4- Mai lai Atgi no( 7-0 Have. 1 1� t/w L aL�'mahSir) (aye- vome, g-r IA�� nf-tcy e- 1 Operator. = Leland Smith TS1 S+aJ e -2-- County: Duplin Date: : 11/27/05 Dist.to nearest residence (other than owner): 1500 ft. sows (farrow to finish):=== sows (farrow to feeder): eder):--r > head (finishing only): - 1000 sows (farrow to wean): > head (wean to feeder): Ave. Live Weight for other operations(Ibs.)=> Storage volume for sludge accum. (cu. ft.):=> Treatment Volume (min. 1 cu. ft,/lb.) > 0.0 25 Year - 24 Hour Rainfall (in.) > 7.5 Rainfall in excess of evaporation (in.) > 7.0 Drainage area of buildings & lots (sq. ft.)=> 28320.0 Volume of wash water (gallons/day)--- > Temporary storage period (days) > 180 Freeboard (ft.): > 1.0 Side slopes (inside lagoon): > 1.5 ; 1 inside top length (ft.): 200.0 Inside top width (ft.): > 74.1 Top of dike elevation (ft.): > 56.0 Bottom of lagoon elevation (ft.): > 43.3 Seasonal high watertable(SHWT) elev.(ft.):=> 38.0 Total required volume:==== - 85095 cu. ft. i^h Actual design volume: - 113633 cu_ ft. Stop pumping el.(> or = to 38.0 ft.SHWT)> 49.0 ft. (> or = to 49.3 ft.Min.) Required minimum treatment volume: 0 cu. ft. Volume at stop pumping elevation: 43422 cu. ft. Start pumping elev.: > 54.3 ft. Volume at start pumping elevation: 104024 cu. ft. Actual volume less 25yr-24hr rain: 86670 cu. ft. NOTE: Verify that temp. storage is adequate: Req. volume to be pumped:====> 58133 cu. ft. Actual volume to be pumped:==> 60602 cu. ft. A I a f y TA; -efJ o-f vob e. I —a yr G 04 E)CC 2L� � i n /� S=t` - Al gipf - ? e /4o rA+a cAe.o 1 0 jtv AdeGftwit I em jod Pa P7 S+o / -f. f v A4 e. `�fJ CI�001 rho r Operator: -Thomas E Smith County: = Duplin Date: -- 02J16/04 Dist.to nearest residence (other than owner): 0 ft. sows (farrow to finish): =_ sows (farrow to feeder): eder):=== > head (finishing only): - 2140 sows (farrow to wean): head (wean to feeder): Ave. Live Weight for other operations(ibs.)=> Storage volume for sludge accum. (cu. ft.):=> Treatment Volume (min. 1 cu. ft./lb.) > 1.0 25 Year - 24 Hour Rainfall (in.) > 7.5 Rainfall in excess of evaporation (in.) > 7.0 Drainage area of buildings & lots (sq. ft.)=> Volume of wash water (gallonsfday) Temporary storage period (days) > 180 Freeboard (ft.):--- > 1.0 Side slopes (inside lagoon): > 1.5 : 1 inside top length (ft.): > 450.0 Inside top width (ft.): > 141.0 Top of dike elevation (ft.). > 46.5 Bottom of lagoon elevation (ft.). > 33.5 Seasonal high water tabfe(SHWT) elev.(ft.):=> 38.0 Total required volume: 436120 cu. ft. Actual design volume: 619056 cu. ft. Stop pumping el.(> or = to 38.0 ft.SHWT)> 42.5 ft. (> or = to 39.5 ft.Min.) Required minimum treatment volume: 288900 cu. ft. Volume at stop pumping elevation: 441815 cu. ft. Start pumping elev.: > 44.5 ft. Volume at start pumping elevation: 576305 cu, ft. Actual volume Tess 25yr-24hr rain: 579400 cu. ft. NOTE: Verify that temp. storage is adequate: Req. volume to be pumped:====> 107564 cu. ft. Actual volume to be pumped:==> 134490 cu. ft. i System Calibration Information presented in manufacturer's charts are based on average operation conditions with relatively new equipment. Discharge rates and application rates change over time as equipment gets older and components wear. In particular, pump wear tends to reduce operating pressure and flow. With continued use, nozzle wear results in an increase in the nozzle opening which will increase the discharge rate while decreasing the wetted diameter. You should be aware that operating the system differently than assumed in the design will alter the application rate, diameter of coverage, and subsequently the application uniformity. For example, operating the system with excessive pressure results in smaller droplets, greater potential for drift, and accelerates wear of the sprinkler nozzle. Clogging of nozzles can result in pressure increase. Plugged intakes or crystallization of mainlines will reduce operating pressure. Operating below design pressure greatly reduces the coverage diameter and application uniformity. For the above reason, you should calibrate your equipment on a regular basis to ensure proper application rates and uniformity. Calibration at least once every three years is recommended. Calibration involves collecting and measuring flow at several locations in the application area. Any number of containers can be used to collect flow and determine the application rate. Rain gauges work best because they already have a graduated scale from which to read the application amount without having to perform additional calculations. However, pans, plastic buckets, jars, or anything with a uniform opening and cross-section can be used provided the liquid collected can be easily transferred to a scaled container for measuring. For stationary sprinklers, collection containers should be located randomly throughout the application area at several distances from sprinklers. For traveling guns, sprinklers should be located along a transect perpendicular to the direction of pull. Set out collection containers 25 feet apart along the transect on both sides of the gun cart. You should compute the average application rate for all nonuniformity of the application. On a windless day, variation between containers of more than 30 percent is cause for concern. You should contact your irrigation dealer or technical specialist for assistance. *Reprinted for Certification Training for Operations of Animal Waste Management Systems Manual OPERATION & MAINTENANCE PLAN Proper lagoon management should be a year-round priority. It is especially important to manage levels so that you do not have problems during extended rainy and wet periods. Maximum storage capacity should be available in the lagoon for periods when the receiving crop is dormant (such as wintertime for bermudagrass) or when there are extended rainy spells such as a thunderstorm season in the summertime. This means that at the first sign of plant growth in the later winter / early spring, irrigation according to a farm waste management plan should be done whenever the land in dry enough to receive lagoon liquid. This will make storage space available in the lagoon for future wet periods. In the late summer / early fall the lagoon should be pumped down to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made to maintain the lagoon close to the minimum liquid level as long as the weather and waste utilization plan will allow it. Waiting until the lagoon has reached its maximum storage capacity before starting to irrigated does not leave room for storing excess water during extended wet periods. Overflow from the lagoon for any reason except a 25-year, 24-hour storm is a violation of state law and subject to penalty action. The routine maintenance of a lagoon involves the following: • Maintenance of a vegetative cover for the dam. Fescue or common bermudagrass are the most common vegetative covers. The vegetation should be fertilized each year, if needed, to maintain a vigorous stand. The amount of fertilized applied should be based on a soils test, but in the event that it is not practical to obtain a soils test each year, the lagoon embankment and surrounding areas should be fertilized with 800 pounds per acre of 10-10-10, or equivalent. • Brush and trees on the embankment must be controlled. This may be done by mowing, spraying, grazing, chopping, or a combination of these practices. This should be done at least once a year and possibly twice in years that weather conditions are favorable for heavy vegetative growth. NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter the lagoon water. Such chemicals could harm the bacteria in the lagoon that are treating the waste. Maintenance inspections of the entire lagoon should be made during the initial filling of the lagoon and at least monthly and after major rainfall and storm events. Items to be checked should include, as a minimum, the following: Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes -- look for: 1. separation of joints 2. cracks or breaks 3. accumulation of salts or minerals 4. overall condition of pipes 2 Lagoon surface -- look for: 1. undesirable vegetative growth 2. floating or lodged debris Embankment -- look for: 1. settlement, cracking, or "jug" holes 2. side slope stability -- slumps or bulges 3. wet or damp areas on the back slope 4. erosion due to lack or vegetation or as a result of wave action 5. rodent damage Larger lagoons may be subject to liner damage due to wave action caused by strong winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam. A good stand of vegetation will reduce the potential damage caused by wave action. If wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be used to reduce the wave impacts. Any of these features could lead to erosion and weakening of the dam. If your lagoon has any of these features, you should call an appropriate expert familiar with design and construction of waste lagoons. You may need to provide a temporary fix if there is a threat of a waste discharge. However, a permanent solution should be reviewed by the technical expert. Any digging into a lagoon dam with heavy equipment is a serious undertaking with potentially serious consequences and should not be conducted unless recommended by an appropriate technical expert. Transfer Pumps -- check for proper operation of: 1. recycling pumps 2. irrigation pumps Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding noise, or a large amount of vibration, may indicate that the pump is in need of repair or replacement. NOTE: Pumping systems should be inspected and operated frequently enough so that you are not completely "surprised" by equipment failure. You should perform your pumping system maintenance at a time when your lagoon is at its low level. This will allow some safety time should major repairs be required. Having a nearly full lagoon is not the time to think about switching, repairing, or borrowing pumps. Probably, if your lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an inventory of spare parts or pumps. • Surface water diversion features are designed to carry all surface drainage waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot runoff) away from your lagoon and other waste treatment or storage structures. The only water that should be coming from your lagoon is that which comes from your flushing (washing) system pipes and the rainfall that hits the lagoon directly. You should inspect your diversion system for the following: 1. adequate vegetation 2. diversion capacity 3. ridge berm height 3 Identified problems should be corrected promptly. It is advisable to inspect your system during or immediately following a heavy rain. If technical assistance is needed to determine proper solutions, consult with appropriate experts. You should record the level of the lagoon just prior to when rain is predicted, and then record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will give you an idea of how much your lagoon level will rise with a certain rainfall amount (you must also be recording your rainfall for this to work). Knowing this should help in planning irrigation applications and storage. If your lagoon rises excessively, you may have an overflow problem from a surface water diversion or there may be seepage into the lagoon from the surrounding land. Lagoon Operation Startup: 1 Immediately after construction establish a complete sod cover on bare soil surfaces to avoid erosion. 2. Fill new lagoon design treatment volume at least half full of water before waste loading begins, taking care not to erode lining or bank slopes. 3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the pipe to discharge near the bottom of the lagoon during initial filling or another means of slowing the incoming water to avoid erosion of the lining. 4. When possible, begin loading new lagoons in the spring to maximize bacterial establishment (due to warmer weather). 5. It is recommended that a new lagoon be seeded with sludge from a healthy working swine lagoon in the amount of 0.25 percent of the full lagoon liquid volume. This seeding should occur at least two weeks prior to the addition of wastewater. 6. Maintain a periodic check an the lagoon liquid pH. If the pH falls below 7.0, add agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume until the pH rises above 7.0. Optimum lagoon liquid pH is between 7.5 and 8.0. 7. A dark color, lack of bubbling, and excessive odor signals inadequate biological activity. Consultation with a technical specialist is recommended if these conditions occur for prolonged periods, especially during the warm season. Loading: The more frequently and regularly that wastewater is added to a lagoon, the better the lagoon will function. Flush systems that wash waste into the lagoon several times daily are optimum for treatment. Pit recharge systems, in which one or more buildings are drained and recharged each day, also work well. 4 • Practice water conservation --- minimize building water usage and spillage from leaking waterers, broken pipes and washdown through proper maintenance and water conservation. • Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the amount of solids entering the lagoon. Management: • Maintain lagoon liquid level between the permanent storage level and the full temporary storage level. • Place visible markers or stakes on the lagoon bank to show the minimum liquid level and the maximum liquid level. (Figure 2-1). • Start irrigating at the earliest possible date in the spring based on nutrient requirements and soil moisture so that temporary storage will be maximized for the summer thunderstorm season. Similarly, irrigate in the late summer / early fall to provide maximum lagoon storage for the winter. • The lagoon liquid level should never be closer than 1 foot to the lowest point of the dam or embankment, • Don not pump the lagoon liquid level lower than the permanent storage level unless you are removing sludge. • Locate float pump intakes approximately 18 inches underneath the liquid surface and as far away from the drainpipe inlets as possible. • Prevent additions of bedding materials, long-stemmed forage or vegetation, molded feed, plastic syringes, or other foreign materials into the lagoon. • Frequently remove solids from catch basins at end of confinement houses or wherever they are installed. • Maintain strict vegetation, rodent, and varmint control near lagoon edges. • Do not allow trees or large bushes to grow on lagoon dam or embankment. • Remove sludge from the lagoon either when the sludge storage capacity is full or before it fills 50 percent of the permanent storage volume. • If animal production is to be terminated, the owner is responsible for obtaining and implementing a closure plan to eliminate the possibility of a pollutant discharge. Sludge Removal: Rate of lagoon sludge buildup can be reduced by: 5 • proper lagoon sizing, • mechanical solids separation of flushed waste, • gravity settling of flushed waste solids in an appropriately designed basin, or • minimizing feed wastage and spillage. Lagoon sludge that is removed annually rather than stored long term will: • have more nutrients, • have more odor, and • require more land to properly use the nutrients. Removal techniques: • Hire a custom applicator. • Mix the sludge and lagoon liquid with a chopper - agitator impeller pump through large - bore sprinkler irrigation system onto nearby cropland; and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix remaining sludge; pump into liquid sludge applicator; haul and spread onto cropland or forageland; and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon to receive the sludge so that liquids can drain back into lagoon; allow sludge to dewater; haul and spread with manure spreader onto cropland or forageland; and soil incorporate. Regardless of the method, you must have the sludge material analyzed for waste constituents just as you would your lagoon water. The sludge will contain different nutrient and metal values from the liquid. The application of the sludge to fields will be limited by these nutrients as well as any previous waste applications to that field and crop requirement. Waste application rates will be discussed in detail in Chapter 3. When removing sludge, you must also pay attention to the liner to prevent damage. Close attention by the pumper or drag -line operator will ensure that the lagoon liner remains intact. If you see soil material or the synthetic liner material being disturbed, you should stop the activity immediately and not resume until you are sure that the sludge can be removed without liner injury. If the liner is damaged it must be repaired as soon as possible. Sludge removed from the lagoon has a much higher phosphorus and heavy metal content than liquid. Because of this it should probably be applied to land with low phosphorus and metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion. Note that if the sludge is applied to fields with very high soil -test phosphors, it should be applied only at rates equal to the crop removal of phosphorus. As with other wastes, always have your lagoon sludge analyzed for its nutrient value. 6 The application of sludge will increase the amount of odor at the waste application site. Extra precaution should be used to observe the wind direction and other conditions which could increase the concern of neighbors. Possible Causes of Lagoon Failure Lagoon failures result in the unplanned discharge of wastewater from the structure. Types of failures include leakage through the bottom or sides, overtopping, and breach of the dam. Assuming proper design and construction, the owner has the responsibility for ensuring structure safety. Items which may lead to lagoon failures include: • Modification of the lagoon structure -- an example is the placement of a pipe in the dam without proper design and construction. (Consult an expert in lagoon design before placing any pipes in dams.) • Lagoon liquid levers -- high levels are a safety risk. • Failure to inspect and maintain the dam. • Excess surface water flowing into the lagoon. • Liner integrity — protect from inlet pipe scouring, damage during sludge removal, or rupture from lowering lagoon liquid level below groundwater table. NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause gullies to form in the dam. Once this damage starts, it can quickly cause a large discharge of wastewater and possible dam failure. 7 EMERGENCY ACTION PLAN PHONE NUMBERS DIVISION OF WATER QUALITY (DWQ) EMERGENCY MANAGEMENT SERVICES (EMS) SOIL AND WATER CONSERVATION DISTRICT (SWCD) NATURAL RESOURCES CONSERVATION SERVICE (NRCS) COOPERATIVE EXTENSION SERVICE (CES) c b-2c r� iat- t5— °tto — Qg_a,tata cotg9[� at�k3 This plan will be implemented in the event that wastes from your operation are leaking, overflowing or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow - possible solutions are: a) Add soil to berm to increase elevation of dam. b) Pump wastes to fields at an acceptable rate. c) Stop all flow to the lagoon immediately. d) Call a pumping contractor. e) Make sure no surface water is entering lagoon. B. Runoff from waste application field -actions include: a) Immediately stop waste application. b) Create a temporary diversion to contain waste. c) Incorporate waste to reduce runoff. d) Evaluate and eliminate the reason(s) that cause the runoff. e) Evaluate the application rates for the fields where runoff occurred. C. Leakage from the waste pipes and sprinklers - action include: a) Stop recycle pump. b) Stop irrigation pump. c) Close valves to eliminate further discharge. d) Repair all leaks prior to restarting pumps. D. Leakage from flush systems, houses, solid separators - action include: a) Stop recycle pump. b) Stop irrigation pump. c) Make sure siphon occurs. d) Stop all flow in the house, flush systems, or solid separators. E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks - possible action: a) Dig a small sump or ditch from the embankment to catch all seepage, put in a submersible pump, and pump back to lagoon. b) If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. c) Have a professional evaluate the condition of the side walls and the lagoon bottom as soon as possible. 8 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach surface waters? b. Approximately how much was released and for what duration? c. Any damage notes, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off the property)? h. How much reached surface waters? 3. Contact appropriate agencies. a. During normal business hours call your DWQ regional office; Phone #, After hours, emergency number: (919) 733-3942. Your phone call should include: your name, facility number, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of the movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If the spill leaves property or enters surface waters, call local EMS phone number. c. Instruct EMS to contact local Health Department. d. Contact CE's phone number, local SWCD office phone number and the local NRCS office for advice / technical assistance phone number. 4. If none of the above works call 911 or the Sheriffs Department and explain your problem to them and ask the person to contact the proper agencies for you. 5. Contact the contractor of your choice to begin repair or problem to minimize offsite damage. a. Contractors Name: Murphy Brown, LLC b. Contractors Address: P.O. Box 856, Warsaw, NC 28398 c . Contractors Phone: (910)293-3434 6. Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.) a. Name: Kraig Westerbeek b. Phone: (910) 293 - 5330 7. Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. 9 INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS Source Cause BMP's to Minimize Odor Site Specific Practices (Liquid Systems) Flush Gutters Accumulation of solids (./) Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed. ( ) Remove bridging of accumulated solids at discharge Lagoons and Pits Crusted Solids (✓) Maintain lagoons, settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6-8 inches over more than 30% of surface. Excessive Decaying vegetation (I)Maintain vegetative control along banks of Vegetative Growth lagoons and other impoundment's to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. (Dry Systems) Feeders Feed Spillage () Design, operate and maintain feed systems (e.g.. bunkers and troughs) to minimize the accumulation of decaying wastage. () Clean up spillage on a routine basis (e.g. 7-10 day interval during summer; 15-30 day interval during winter). Feed Storage Accumulation of feed residues () Reduce moisture accumulation within and around immediate perimeter of feed storage areas by insuring drainage away from site and/or providing adequate containment (e.g., covered bin for brewer's grain and similar high moisture grain products). () Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed. Animal Holding Accumulation of animal () Eliminate low area that trap moisture along fences Areas wastes and feed wastage and other locations where waste accumulates and disturbance by animals is minimal. () Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (Le. inspect for and remove or break up accumulated solids as needed). MIC — November 11, 1996 10 Dry Manure Handling Accumulations of animal () Remove spillage on a routine basis (e.g. 7-10 day Systems wastes interval during summer; 15-30 days interval during winter) where manure is loaded for land application or disposal. O Provide for adequate drainage around manure stockpiles () Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed. — The issues checked () pertain to this operation. The landowner / integrator agrees to use sound judgment in applying insect control measures as practical. I certify the aforementioned insect control Best Management Practices have been reviewed with me. Ngirn (Landowner Signature) For more information contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC 27695-7613. AMIC -- November 11, 1996 11 Swine Farm Waste Management — Odor Control Checklist INSTRUCTIONS FOR USE • Odor Control Checklist is required by General Statute 143-215.10C(e){1) ♦ Check any/all the BMPs you will implement on this facility. Items checked/selected become a requirement of the CAWMP. • Items in bold or pre -selected are required. ♦ Add any site -specific details related to the selected BMPs • Include any other odor control measures not listed • NOTE: Not all BMPs may be cost-effective for every facility. Evaluate each BMP prior to selecting for your facility. Permit No.: 3 t - 1O1' ate: D - 4- )- Owner Signature: Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices FARMSTEAD • Swine Production ❑ Maintain vegetative or wooded buffers at or near property boundary • Improper drainage ❑ Grade and landscape so water drains away from facilities and prevent ponding ❑ Maintain farm access roads and prevent traffic in waste application area ❑ Other BMPs — please describe • Traps dust and gases, provides dilution and visual screening • May require third party input/approval • Reduce odors and vectors that occur with stagnant conditions • Prevents spillage during transport and tracking of waste onto public roads MORTALITY MANAGEMENT • Carcass ® Dispose of mortality using method approved • Required by statute and permit Decomposition by NCDA&CS State Veterinarian. Manage • May require third party input/approval According to CAWMP (Mortality Management Checklist) and permits). O Put carcasses in refrigerated or freezer) dead boxes within 24 hours for short-term mortality Storage. • Incomplete Incineration D Use incinerators with secondary burners for • Reduce odors by complete incineration complete combustion. ❑ Other BMPs — please describe Swine AMOC Page 1 of 6 APPROVED—7/25/2019 Swine Farm Waste Management — Odor Control Checklist Permit No.: 3 1 - k o11 Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices HOUSE / BARN — WASTE HANDLING • Flush tanks • Odorous Gases + Partial microbial decomposition • Agitation of wastes • Ammonia ❑ Install flush tank covers ❑ Flush pits at least 4 times per day ❑ Empty pits at least once every 7 days ❑ Underfloor flush with pit ventilation ❑ Install/extend fill lines to near bottom of tanks with anti -siphon vents ❑ Install covers on outside waste collection or junction box ❑ Install sump tank covers for lift stations ❑ Flush/recharge with treated effluent ❑ Treat waste in pits with proven biological or chemical additive ❑ Other BMPs — please describe • Pit -flush systems • Pit -flush systems • Pit -recharge or "pull -plug" systems • Monitor for any solids accumulation in pit HOUSE / BARN — FLOOR AND INDOOR SURFACES • Manure covered floors ❑ Scrape manure from alleys into pens daily ❑ Install fully slotted floor system ❑ Install waterers over slotted floor area ❑ Install feeders at high end of solid floors • Odorous Gases 0 Scrape manure buildup from floors and walls ❑ Keep floors dry ❑ Install underfloor ventilation for drying ❑ Replace bedding/scrape at frequency to keep bedding dry ❑ Other BMPs —please describe • Will move with other manure via pits • Where applicable • Aids in animal cleanliness • Aids in animal cleanliness • Solid floor/bedding systems Swine AMOC Page 2 of 6 APPROVED — 7/25/2019 Swine Farm Waste Management — Odor Control Checklist Permit No.: 3 - ko11 Cause/Source 8MP Option to Minimize Odor Comments Site Specific Practices HOUSE / BARN — VENTILATION • Dust • Volatile/odorous gases O Clean fans regularly— specify Frequency ❑ Efficient air movement ❑ Install temperature and humidity sensors to control ventilation ❑ Treat barn exhaust 0 Other BMPs — please describe • Examples: biofilters, wet scrubbing, windbreaks • May reduce ventilation rate depending on method HOUSE / BARN — FEED • Oust • Adsorbed Gases • Ammonia ❑ Install feed covers ® Keep outdoor feed storage covered except When necessary to add/remove feed D Minimize free -fall height of dry feed ❑ Install feed delivery downspout extenders to the feed covers ❑ Remove spoiled/unusable feed on regular basis ❑ Feed pellets instead of dry meal ❑ Use feed additives ❑ Use feed -reduced crude protein diet 0 Other BMPs — please describe • Required by rule 15A NCAC 02D .1802 • May require third party input/approval • May require third party input/approval • May require third party input/approval HOUSE/BARN --GENERAL • Dust • Odorous Gases 0 Install temperature and humidity sensors to control ventilation ❑ Use ultraviolet light to treat indoor air ❑ Use indoor or outdoor electrostatic space charge system ❑ Other BMPs — please describe • Maintain relative humidity at 40 to 65% • Can be used to treat exhaust air Swine AMOC Page 3 of 6 APPROVED — 7/25/2019 Swine Farm Waste Management —Odor Control Checklist Permit No.: 3 -- 1°k1 Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices LAGOON / WASTE STORAGE STRUCTURE • Volatile Gases ® Maintain proper lagoon volume • Sufficient liquid volume/depth is required for proper anaerobic treatment ❑ Minimize free -fall height of waste from discharge pipe to lagoon surface ❑ Extend discharge point of pipe to below lagoon • Use caution not to scour or damage lagoon liner liquid level ❑ Maintain proper surface area -to -volume ratio 0 Use correct lagoon start-up procedures ❑ Aerate for odor control ® Manage sludge levels based on annual sludge survey as required by permit ❑ Keep spilled feed or foreign debris out of lagoon to prevent excess sludge accumulation ❑ Install/use solids separation system ❑ Use proven biological or chemical additives ❑ Use permeable lagoon covers {not a digester} ❑ Use impermeable lagoon cover or • Methane can be flared if not utilized anaerobic digester ❑ Other BMPs — please describe • Monitor for any increase in rate of solids accumulation LAND APPLICATION • Odorous gases • Wind drift ® Perform land application in accordance with CAWMP ® Pump intake near lagoon surface ❑ Pump from second stage lagoon ❑ Follow good neighbor policy ❑ Operate at minimum recommended pressure O Increase setbacks beyond those required by statute, rule, or permit • Required by rule 15A NCAC 02D .1802 • Avoid application on known weekends, special days, or holidays/eves if possible Swine AMOC Page 4 of 6 APPROVED — 7/25/2019 Swine Farm Waste Management —Odor Control Checklist Permit No.: 3 `— \S \ Cause/Source BMP Option to Minimize Odor Comments Site Specific Practices LAND APPLICATION (CONTINUED) ❑ Apply during favorable wind conditions, (especially for traveling guns or impact sprinklers) ❑ When practical, apply waste on sunny days rather than cool, overcast days ❑ When possible, apply waste mid -morning to late -afternoon ❑ For traveling guns, use taper -ring or taper -bore nozzles ❑ For traveling guns, use largest -available nozzle that provides acceptable application uniformity ❑ Replace impact sprinklers with low -drift nozzles on center pivots and linear move systems. ❑ Use hose -drag system ❑ Use injection method for waste application ❑ Other BMPs — please describe • Recommend checking predicted average hourly wind speed within 24 hours prior to anticipated start • Allows for vertical dissipation of odor • Allows for better vertical dissipation of odor • Less odor and drift than ring nozzles SLUDGE DISPOSAL • Odorous gases ❑ Transport sludge in covered vehicles or tankers ❑ Apply in thin, uniform layers ❑ Incorporate land -applied sludge as soon as practical after application, and in accordance with permit. ❑ Use injection method for sludge application ❑ Dewater sludge prior to application ❑ Use alternatives to land application, such as compost, gasification, energy generation, etc. ❑ Other BMPs — please describe • Speeds drying and prevents ponding • Required within 48 hours or prior to next rain event, whichever is first, for conventionally tilled bare sails Swine AMOC Page 5 of 6 APPROVED — 7/25/2019 ADDITIONAL INFORMATION AVAILABLE FROM: Air Management Practices Assessment Tool (AMPAT) AHG-538-A Certification Training for Animal Waste Management Systems: Type A EBAE 103-83 — Lagoon Design and Management for Livestock Manure Treatment and Storage EBAE 128-88 — Swine Production Facility Manure Management: Pit Recharge -Lagoon Treatment EBAE 129-88 — Swine Production Facility Manure Management: Underfloor Flush -Lagoon Treatment EBAE Fact Sheet — Calibration of Manure and Wastewater Application Equipment EBAE Fact Sheet — Swine Production Farm Potential Odor Sources and Remedies NC NRCS Standard 359 — Waste Treatment Lagoon NC NRCS Standard 380 — Windbreak/Shelterbelt Establishment NC NRCS Standard 422 — Hedgerow Planting NC NRCS Standard 442 — Sprinkler System Nuisance Concerns in Animal Manure Management: Odors and Flies; PRO107 1995 Conference Proceedings Options for Managing Odor: A Report from the Swine Odor Task Force www.extension.iastate.edu/ampat/ NC Division of Water Resources www.bae.ncsu.edu www.bae.ncsu.edu www.bae.ncsu.edu www.bae.ncsu.edu www.bae.ncsu.edu www.nres.udsa.gov www.nres.udsa.gov www.nres.udsa.gov www.nres.udsa.gov Florida Cooperative Extension Service NC State University Swine AMOC Page 6 of 6 APPROVED — 7/25/2019 Version —November 26, 2018 Mortality Management Methods Indicate which method(s) will be implemented. When selecting multiple methods indicate a primary versus secondary option. Methods other than those listed must be approved by the State Veterinarian. Primary Secondary Routine Mortality El El Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal death. The burial must be at least 300 feet from any flowing stream or public body of water (G.S.106-403). The bottom of the burial pit should be at least one foot above the seasonal high water table. Attach burial location map and plan. El El Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC 13B .0200. Rendering at a rendering plant licensed under G.S. 106-168.7. ElEl Complete incineration according to 02 NCAC 52C .0102. a A composting system approved and permitted by the NC Department of Agriculture & Con- sumer Services Veterinary Division (attach copy of permit). If compost is distributed off -farm, additional requirements must be met and a permit is required from NC DEQ. El El In the case of dead poultry only, placing in a disposal pit of a size and design approved by the NC Department of Agriculture & Consumer Services (G.S. 106-549.70). El El Any method which, in the professional opinion of the State Veterinarian, would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval by the State Veterinarian must be attached). Mass Mortality Plan Mass mortality plans are required for farms covered by an NPDES permit. These plans are also recommended for all animal operations. This plan outlines farm -specific mortality man- agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup- ports a variety of emergency mortality disposal options; contact the Division for guidance. • A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated when numbers of dead animals exceed normal mortality rates as specified by the State Veterinarian. • Burial must be done in accordance with NC General Statutes and NCDA&CS Veterinary Division regulations and guidance. • Mass burial sites are subject to additional permit conditions (refer to facility's animal waste management system permit). • In the event of imminent threat of a disease emergency, the State Veterinarian may enact additional temporary procedures or measures for disposal according to G.S. 106-399.4. Signature of Farm Owner/Manager Date 3 0,\„:_, \ c - 1 y - Z-z- Signature of Technical Specialist \ Date