Loading...
HomeMy WebLinkAboutNC0047384_Authorization to Construct_20141010*VA ,AP NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Steven D. Drew Director of Water Resources P. O. Box 3136 Greensboro, North Carolina 27402-3136 Dear Mr. Drew: John E. Skvarla, III Secretary October 10, 2014 Subject: CORRECTED Authorization to Construct A to C No. 047384A04 City of Greensboro T. Z. Osborne WRF During a recent file audit, errors were noted in the T. Z. Osborne WRF description narratives in the Authorization to Construct permit 047384A04 issued July 30, 2014. Attached is a CORRECTED Authorization to Construct permit 047384A04 and a CORRECTED Engineer Certificate form. Please replace and discard the July 2014 documents with the attached CORRECTED versions. The CORRECTED copies did not alter any construction and/or design details approved in the July permit. Thank you for your assistance in this matter. If you have any question contact Ron Berry at (919) 807 — 6396 or ron.berry@ncdenr,gov. Sincerely, Pe", Ron Berry, Engineer Division of Water Resources/NCDENR cc: Patricia Drummey Stiegel, P.E. Hazen and Sawyer, P.C. 4011 WestChase Boulevard Suite 500 Raleigh, NC 27607 DWR/Winston-Salem Regional Office, Water Quality Programs Central Files NPDES File Without Engineer's Certificate attached: Guilford County Health Department 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Phone: 919-807-6300 Internet www.ncwaterquality.org An Equal OpportunityWffirmalve Action Employer NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III Governor Secretary October 10, 2014 Steven D. Drew Director of Water Resources P. O. Box 3136 Greensboro, North Carolina 27402-3136 CORRECTED SUBJECT: Authorization to Construct A to C No. 047384A04 City of Greensboro T. Z. Osborne WRF Dear Mr. Drew: A letter of request for an Authorization to Construct was received June 3, 2014, by the Division of Water Resources (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 40 MGD T. Z. Osborne WRF, with discharge of treated wastewater into the South Buffalo Creek in the Cape Fear River Basin. This authorization is for Phase II of partial upgrades to support a future increase in capacity to 56 MGD but does not results in an increase in design or permitted capacity of the existing 40 MGD at this time. This authorization is awarded for the construction of the following specific modifications: Installation of new aeration/diffuser systems in aeration basins 1-12, two (2) new 21,650 CFM blowers, piping, and controls; addition of three (3) new 160 ft diameter secondary clarifiers with individual 100 GPM vertical wet well chopper scum pumps and two (2) additional 100 GPM vertical wet well chopper scum pumps (one as replacement scum pump for existing Secondary Clarifier#7 and one as in house spare), piping, and controls; new RAS Pump Station (designated as #4) consisting of three (3) new 5,100 GPM horizontal non -clog pumps with variable frequency drive, one (1) new 1,880 GPM horizontal self -priming drain pump, a new duplex sump pump system consisting of two ('new 30 GPM submersible pumps, piping, and controls; upgrade of existing RAS Pump Station#2 with installation of one (1) replacement 400 GPM horizontal non -clog pump with variable speed drive, piping, and controls; upgrade of existing RAS Pump Station#3 with the addition of one (1) new 5,100 GPM horizontal non -clog pump with variable speed drive, piping, and controls; addition of one (1) new 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Phone: 919.807-63001 Internet: www.ncwaterquality.org An Equal OpportunityWifirmative Action Employer Steven D. Drew, Director of Water Resources October 10, 2014 CORRECTED Page 2 of 3 • 3,250 KW 4160 V 3 PH stand-by generator with sufficient fuel capacity to operate 24 hrs under full load, containment, and controls; in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0047384 issued effective July 1, 2014, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0047384. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston Salem Regional Office, telephone number (336) 771 - 5000, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: NPDES Unit, DWR/DENR, 1617 Mail Service Center, Raleigh, NC 27699-1617. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. Steven D. Drew, Director of Water Resources October 10, 2014 CORRECTED Page 3 of 3 During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions or need additional information, please contact Ron Berry at telephone number (919) 807-6396. Sincerely, ThomA. Reeder, Director Division of Water Resources/NCDENR cc: Patricia Drummey Stiegel, P.E. Hazen and Sawyer, P.C. 4011 WestChase Boulevard Suite 500 Raleigh, NC 27607 DWR/Winston-Salem Regional Office, Water Quality Programs Central Files NPDES File Without Engineer's Certificate attached: Guilford County Health Department City of Greensboro T. Z. Osborne WRF Authorization to Construct No. 047384A04 Issued July 30, 2014 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the T. Z. Osborne Wastewater Reclamation Facility, located in Guilford County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of new aeration/diffuser systems in aeration basins 1-12, two (2) new 21,650 CFM blowers, piping, and controls; addition of three (3) new 160 ft diameter secondary clarifiers with individual 100 GPM vertical wet well chopper scum pumps and two (2) additional 100 GPM vertical wet well chopper scum pumps (one as replacement scum pump for existing Secondary Clarifier#7 and one as in house spare), piping, and controls; new RAS Pump Station (designated as #4) consisting of three (3) new 5,100 GPM horizontal non -clog pumps with variable frequency drive, one (1) new 1,880 GPM horizontal self -priming drain pump, a new duplex sump pump system consisting of two (1) new 30 GPM submersible pumps, piping, and controls; upgrade of existing RAS Pump Station#2 with installation of one (1) replacement 400 GPM horizontal non -clog pump with variable speed drive, piping, and controls; upgrade of existing RAS Pump Station#3 with the addition of one (1) new 5,100 GPM horizontal non -clog pump with variable speed drive, piping, and controls; addition of one (1) new 3,250 KW 4160 V 3 PH stand-by generator with sufficient fuel capacity to operate 24 hrs under full load, containment, and controls; in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Registration No. Date Mail this Certification to: Attn: Ron Berry Complex Permitting Unit DENR/DWR/Water Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617 SEAL ATA. NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Steven D. Drew Director of Water Resources P. O. Box 3136 Greensboro, North Carolina 27402-3136 Dear Mr. Drew: John E. Skvarla, III Secretary July 30, 2014 CORRECTED: October 10, 2014 SUBJECT: Authorization to Construct A to C No. 047384A04 City of Greensboro T. Z. Osborne WRF A letter of request for an Authorization to Construct was received June 3, 2014, by the Division of Water Resources (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 40 MGD T. Z. Osborne WRF, with discharge of treated wastewater into the South Buffalo Creek in the Cape Fear River Basin. This authorization is for Phase II of partial upgrades to support a future increase in capacity to 56 MGD but does not results in an increase in design or permitted capacity of the existing 40 MGD at this time. This authorization is awarded for the construction of the following specific modifications: Installation of new aeration/diffuser systems in aeration basins 1-12, two (2) new 21,650 CFM blowers, piping, and controls; addition of three (3) new 160 ft diameter secondary clarifiers with individual 100 GPM vertical wet well chopper scum pumps and two (2) additional 100 GPM vertical wet well chopper scum pumps (one as replacement scum pump for existing Secondary Clarifier#7 and one as in house spare), piping, and controls; new RAS Pump Station (designated as #4) consisting of three (3) new 5;100 GPM horizontal non -clog pumps with variable frequency drive, one (1) new 1,880 GPM horizontal self -priming drain pump, a new duplex sump pump system consisting of two (1) new 30 GPM submersible pumps, piping, and controls; upgrade of existing RAS Pump Station#2 with installation of one (1) replacement 400 GPM horizontal non -clog pump with variable speed drive, piping, and controls; upgrade of existing RAS Pump Station#3 with the addition of one (1) new 5,100 GPM horizontal non -clog pump with variable speed drive, piping, and controls; addition of one (1) new 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Phone: 919-807-63001 Internet: www.ncwaterquality.org An Equal OpportunityWAffirmative Action Employer Steven D. Drew, Director of Water Resources July 30, 2014 CORRECTED: October 10, 2014 Page 3 of 3 During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications. must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions , or need additional information, please contact Ron Berry at telephone number (919) 807-6396. Sincerely, Thomas A. Reeder, Director Division of Water Resources/NCDENR cc: Patricia Drummey Stiegel, P.E. Hazen and Sawyer, P.C. 4011 WestChase Boulevard Suite 500 Raleigh, NC 27607 DWR/Winston-Salem Regional Office, Water Quality Programs Central Files NPDES File Without Engineer's Certificate attached: Guilford County Health Department City of Greensboro T. Z. Osborne WRF Authorization to Construct No. 047384A04 Issued July 30, 2014 CORRECTED: October 10, 2014 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the T. Z. Osborne Wastewater Reclamation Facility, located in Guilford County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of new aeration/diffuser systems in aeration basins 1-12, two (2) new 21,650 CFM blowers, piping, and controls; addition of three (3) new 160 ft diameter secondary clarifiers with individual 100 GPM vertical wet well chopper scum pumps and two (2) .additional 100 GPM vertical wet well chopper scum pumps (one as replacement scum pump for existing Secondary Clarifier#7 and one as in house spare), piping, and controls; new RAS Pump Station (designated as #4) consisting of three (3) new 5,100 GPM horizontal non -clog pumps with variable frequency drive, one (1) new 1,880 GPM horizontal self -priming drain pump, a new duplex sump pump system consisting of two (1) new 30 GPM submersible pumps, piping, and controls; upgrade of existing RAS Pump Station#2 with installation of one (1) replacement 400 GPM horizontal non -clog pump with variable speed drive, piping, and controls; upgrade of existing RAS Pump Station#3 with the addition of one (1) new 5,100 GPM horizontal non -clog pump with variable speed drive, piping, and controls; addition of one (1) new 3,250 KW .4160 V 3 PH stand-by generator with sufficient fuel capacity to operate 24 hrs under full load, containment, and controls; in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Registration No. Date Mail this Certification to: Attn: Ron Berry Complex Permitting Unit DENR/DWR/Water Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617 \ SEAL ATA NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory John E. Skvarla, III Governor Secretary July 30, 2014 Steven D. Drew Director of Water Resources P. O. Box 3136 Greensboro, North Carolina 27402-3136 SUBJECT: Authorization to Construct A to C No. 047384A04 City of Greensboro T. Z. Osborne WWTP Dear Mr. Drew: A letter of request for an Authorization to Construct was received June 3, 2014, by the Division of Water Resources (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 40 MGD T. Z. Osborne WWTP, with discharge of treated wastewater into the South Buffalo Creek in the Cape Fear River Basin. This authorization is for Phase II of partial upgrades to support a future increase in capacity to 56 MGD but does not results in an increase in design or permitted capacity of the existing 40 MGD at this time. This authorization is awarded for the construction of the following specific modifications: Installation of new aeration/diffuser systems in aeration basins 1-12, two (2) new 21,650 CFM blowers, piping, and controls; addition of three (3) new 160 ft diameter secondary clarifiers with individual 100 GPM vertical wet well chopper scum pumps and two (2) additional 100 GPM vertical wet well chopper scum pumps (one as replacement scum pump for existing Secondary Clarifier#7 and one as in house spare), piping, and controls; new RAS Pump Station (designated as #4) consisting of three (3) new 5,100 GPM horizontal non -clog pumps with variable frequency drive, one (1) new 1,880 GPM horizontal self -priming drain pump, a new duplex sump pump system consisting of two (1) new 30 GPM submersible pumps, piping, and controls; upgrade of existing RAS Pump Station#2 with installation of one (1) replacement 400 GPM horizontal non -clog pump with variable speed drive, piping, and controls; upgrade of existing RAS Pump Station#3 with the addition of one (1) new 5,100 GPM horizontal non -clog pump with variable speed drive, piping, and controls; addition of one (1) new 3,250 KW 4160 V 3 PH stand-by generator with sufficient fuel capacity to operate 24 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Phone: 919-807-63001 Internet: www.ncwaterquality.org An Equal OpportunityWffirmative Action Employer Steven D. Drew, Director of Water Resources July 30, 2014 Page 2 of 3 hrs under full load, containment, and controls; in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0047384 issued effective July 1, 2014, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0047384. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Office, telephone number (336) 771 - 5000, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: NPDES Unit, DWR/DENR, 1617 Mail Service Center, Raleigh, NC 27699-1617. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. Steven D. Drew, Director of Water Resources July 30, 2014 Page 3 of 3 During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions or need additional information, please contact Ron Berry at telephone number (919) 807-6396. Sincerely,' 4/1 Thomas A. Reeder, Director Division of Water Resources/NCDENR cc: Patricia Drummey Stiegel, P.E. Hazen and Sawyer, P.C. 4011 WestChase Boulevard Suite 500 Raleigh, NC 27607 DWR/Winston-Salem Regional Office, Water Quality Programs Central Files NPDES File Without Engineer's Certificate attached: Guilford County Health Department � r City of Greensboro T. Z. Osborne WWTP Authorization to Construct No. 047384A04 Issued July 30, 2014 Engineer's Certification I, , as a duly registered Professional Engineer in - the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Click here to enter facility. Wastewater Treatment Plant, located in Click here to enter facility. County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of new aeration/diffuser systems in aeration basins 1-12, two (2) new 21,650 CFM blowers, piping, and controls; addition of three (3) new 160 ft diameter secondary clarifiers with individual 100 GPM vertical wet well chopper scum pumps and two (2) additional 100 GPM vertical wet well chopper scum pumps (one as replacement scum pump for existing Secondary Clarifier#7 and one as in house spare), piping, and controls; new RAS Pump Station (designated as #4) consisting of three (3) new 5,100 GPM horizontal non -clog pumps with variable frequency drive, one (1) new 1,880 GPM horizontal self -priming drain pump, a new duplex sump pump system consisting of two (1) new 30 GPM submersible pumps, piping, and controls; upgrade of existing RAS Pump Station#2 with installation of one (1) replacement 400 GPM horizontal non -clog pump with variable speed drive, piping, and controls; upgrade of existing RAS Pump Station#3 with the addition of one (1) new 5,100 GPM horizontal non -clog pump with variable speed drive, piping, and controls; addition of one (1) new 3,250 KW 4160 V 3. PH stand-by generator with sufficient fuel capacity to operate 24 hrs under full load, containment, and controls; in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Registration No. Date Mail this Certification to: Attn: Ron Berry Complex Permitting Unit DENR/DWR/Water Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617 SEAL