Loading...
HomeMy WebLinkAbout20221535 Ver 1_Site Plan_20221102Fuff Pond/ Norrnty r e Shl,r Lake (A: FLIi Pond/ Normal Way Leyd} d - I JEW"f s' fib' .A43�-, Nl:-- Q V!Z. N'b -Fe 00s R twd p) RANI �UTA L I)ISruf-&�h 3u ,z- UUNJ 6 Zvi gcCA-V)'rF60. d-- 15 C Please approximately sketch the fbilowing information on thi's plan item, SUCK as 10 ft x 100 ft f *_ (p�vlde dJmensior�s for each i. All proposed vegetation clearing Z. Location of rip rap or flil to be placed above the Full Pond/'Norma! Water Level elevation I Location of rip rap or fill to be Placed below tine Full Pandf Normal Water Level elevation 4. Location of any proposed structures such as buildings.. 5. location of any excavation or dredging below the F Pond/ N rmaretaining i! walls,docks, Le el elevation 6. La -Cation of construction acres corridors FOR,+i: SSGP 1[)-2013 Page 3 oa 3