Loading...
HomeMy WebLinkAbout20221533 Ver 1_Site Plan_20221102La Its (At Fe 11 hnd/ Norma& `rUatar Level) -�.' FUil Pr%nro ;�F Norm 3 P�+3c �• I �) , Te i3u q;er� Lk&lP� LONE, FL@kCI< U Please aP proxlmstely sketch tb a fufowing lnfbrr-, adon on this P Ian (pmvlde d1►ri�ru one for,eocf, Item, such as loft x 100 ft)" 1• All aroposed vegetation clearing 2. LoMion of rip rap or Ill to be placed above the Full Pond/'Normal Weyer Level eleva`� on 3• Location of r!o rap or fill to be placed below the Full Pond/ Normal water Level eievatiar, a. Locataan of any any, structures such as buildings, re-talning walls, cocks, etc. S- location ofanv exCavation or dredging below the Full Pond/ Normal water Level elevation 6. Location of construction access corridors FORM: SSGP io.2oi3 Page 3 Cc 3