HomeMy WebLinkAbout20221531 Ver 1_Site Plan_20221102Lake
(At Full Pond/ Normal Water L evei)
go'
ru(i ion/
Norma( Water Levv
Shorelne
Nc� �'reeS r��o�e�1
frl rig mat C\�s4U cbcince,
l lo'
yew
! w , J P-
#( C�ns�rvC}ion �
c.
c
S
Please approximately sketch the following information on this plan, leng<fii of shoreline
(,provide dimensions for each item, such as loft x 100 ft)*:
1. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining walls, docks, etc.
5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
6. Location of construction access corridors
FORM: SSGP 10-2013 Page 3 of 3