Loading...
HomeMy WebLinkAbout20221531 Ver 1_Site Plan_20221102Lake (At Full Pond/ Normal Water L evei) go' ru(i ion/ Norma( Water Levv Shorelne Nc� �'reeS r��o�e�1 frl rig mat C\�s4U cbcince, l lo' yew ! w , J P- #( C�ns�rvC}ion � c. c S Please approximately sketch the following information on this plan, leng<fii of shoreline (,provide dimensions for each item, such as loft x 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3