HomeMy WebLinkAbout20201095 Ver 1_Credit Release Request Form - Double Rock Task 1_20221102WILDLANDS
ENGINEERING
November 2, 2022
CREDIT RELEASE REQUEST FORM
To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator
From: Andrea Eckardt, aeckardt&wildlandseng.com, 704-560-2997
Through: Wildlands Holdings VI, LLC
We formally request a credit release for the Double Rock Mitigation Site (2020-10950) for
completion of Tasks 1 and 7 per the approved credit release schedule, which is included in the
Attachments with this request. The following documents have been submitted to NCDWR for Task
1 and are pending review: NCDWR approved UMBI, NCDWR approved Buffer Mitigation Plan,
IRT approved Stream Mitigation Plan, Construction Bond, and recorded Conservation Easement.
Credits requested for release are detailed below:
Credit Type
% Release
Credit Amount
include Units
Notes/Comments
Buffer Restoration
25%
79,770.000 sq ft
Buffer Preservation
25%
5,318.000 sq ft
Buffer Enhancement
Generated Nitrogen Nutrient
Offset
Delivered Nitrogen Nutrient
Offset Jordan sites only)
Generated Nitrogen Nutrient
Offset
Delivered Phosphorus Nutrient
Offset Jordan sites only)
Signature: ouvt� !�' Lk-c��
Attachments: 1) Approved Project Credit Table 2) Approved Credit Release Schedule
1. Approved Project Credit Table—DobeRokM+g6o Site
`8
»}
;}
3
/#
ƒI}7K§
;
]22
!
,
®k.!§!(!/f
k)§2
()
�
-,
,
e+k
$
!o
&amdsEngineering, Inc. M 3*22.354.14+ South Mint Street, Suite 104.aa & « 28203
2. Approved Credit Release Schedule — Double Rock Mitigation Site
UIII, CREDIT RELEASE SCHMULE
A In &anaral, 11pnn £iIhmittad of all arrrrirriara rinriirnantntinn by the rprLncrrri anrd £IItKAriiF3nt
approval by DWR, it is agreed that the Riparian Buffer Credits associated with the Bank Parcels
will become available for sale to a third party in accordance with the Credit Release Schedule in
Table 3.0 below:
Table 3A - Credit ReieasR Schedvic for Riparian huffier Credits
% Credit Aua llable
% Credit Release
for Salt IRestoration
�Cattie
Task
Project MIlestonr
and Preservation)
Exclusbon)
Instrurrtent and Buffer Mitigation Plan Approved by DWR,
Draft Stream Mitigation Plan Appraved by the II$T,
No rattle
t
Conservation Easement Recorded", and Financial
20
exclusion -credits
released
Assurance Posted
All Riparian Earthwork & Mitigation Attrviti2n, Planting and
Ir"talIation [5f M 6rr1t1be'09 DeVlc'�s corr,pk dr easerntret
2
baundarles adequately narked, all applicable permits
20
40
obtalnedr stream mitigation activities completed & a site
visit perforreed by DVVR
Monitoring Financial Assurance Posted and Approval of As-
3
Built Report
10
10
4
Monitoring Report 4Y1: PLWroved by the DWH0* & finatitial
10
10
assurance renewed
5
Monitoring Report #2: Approved by the DWR" & financial
10
10
assurance renewed
6 Monitoring Report 41: Appramd by the DUI A financial 10 20
assurance renewal
Item B (I) of Section X in this Instrument has been 5
7 completed and approved by DWR 5
N-D remaining credits wild bE released until Task 7has been sarA ed, assigning the renversatiun eusemeat to
an Approved land trust ar lwwg-term steward.
Monitoring Report 44: App roved by the D R * * & financial
5
8
assurance renewed 5
Monitoring Report #$: Approved by the QWR*i arid final
9
site visit byr DR has been conducted
1p
1a
Tutal
100%
100%
For specification, please see Section V in this Instrument
+• DWR Appr*vad provided upon a 4Jetermirlati4n that the site iS rneeting perl`Q mance standards
contained with in th e a pproved huffier Mitigation Plan
Wildlands Engineering, Inc. (P) 704.332.7754 + 1430 South Mint Street, Suite 104 + Charlotte, NC 28203