Loading...
HomeMy WebLinkAbout20201095 Ver 1_Credit Release Request Form - Double Rock Task 1_20221102WILDLANDS ENGINEERING November 2, 2022 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Andrea Eckardt, aeckardt&wildlandseng.com, 704-560-2997 Through: Wildlands Holdings VI, LLC We formally request a credit release for the Double Rock Mitigation Site (2020-10950) for completion of Tasks 1 and 7 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to NCDWR for Task 1 and are pending review: NCDWR approved UMBI, NCDWR approved Buffer Mitigation Plan, IRT approved Stream Mitigation Plan, Construction Bond, and recorded Conservation Easement. Credits requested for release are detailed below: Credit Type % Release Credit Amount include Units Notes/Comments Buffer Restoration 25% 79,770.000 sq ft Buffer Preservation 25% 5,318.000 sq ft Buffer Enhancement Generated Nitrogen Nutrient Offset Delivered Nitrogen Nutrient Offset Jordan sites only) Generated Nitrogen Nutrient Offset Delivered Phosphorus Nutrient Offset Jordan sites only) Signature: ouvt� !�' Lk-c�� Attachments: 1) Approved Project Credit Table 2) Approved Credit Release Schedule 1. Approved Project Credit Table—DobeRokM+g6o Site `8 »} ;} 3 /# ƒI}7K§ ; ]22 ! , ®k.!§!(!/f k)§2 () � -, , e+k $ !o &amdsEngineering, Inc. M 3*22.354.14+ South Mint Street, Suite 104.aa & « 28203 2. Approved Credit Release Schedule — Double Rock Mitigation Site UIII, CREDIT RELEASE SCHMULE A In &anaral, 11pnn £iIhmittad of all arrrrirriara rinriirnantntinn by the rprLncrrri anrd £IItKAriiF3nt approval by DWR, it is agreed that the Riparian Buffer Credits associated with the Bank Parcels will become available for sale to a third party in accordance with the Credit Release Schedule in Table 3.0 below: Table 3A - Credit ReieasR Schedvic for Riparian huffier Credits % Credit Aua llable % Credit Release for Salt IRestoration �Cattie Task Project MIlestonr and Preservation) Exclusbon) Instrurrtent and Buffer Mitigation Plan Approved by DWR, Draft Stream Mitigation Plan Appraved by the II$T, No rattle t Conservation Easement Recorded", and Financial 20 exclusion -credits released Assurance Posted All Riparian Earthwork & Mitigation Attrviti2n, Planting and Ir"talIation [5f M 6rr1t1be'09 DeVlc'�s corr,pk dr easerntret 2 baundarles adequately narked, all applicable permits 20 40 obtalnedr stream mitigation activities completed & a site visit perforreed by DVVR Monitoring Financial Assurance Posted and Approval of As- 3 Built Report 10 10 4 Monitoring Report 4Y1: PLWroved by the DWH0* & finatitial 10 10 assurance renewed 5 Monitoring Report #2: Approved by the DWR" & financial 10 10 assurance renewed 6 Monitoring Report 41: Appramd by the DUI A financial 10 20 assurance renewal Item B (I) of Section X in this Instrument has been 5 7 completed and approved by DWR 5 N-D remaining credits wild bE released until Task 7has been sarA ed, assigning the renversatiun eusemeat to an Approved land trust ar lwwg-term steward. Monitoring Report 44: App roved by the D R * * & financial 5 8 assurance renewed 5 Monitoring Report #$: Approved by the QWR*i arid final 9 site visit byr DR has been conducted 1p 1a Tutal 100% 100% For specification, please see Section V in this Instrument +• DWR Appr*vad provided upon a 4Jetermirlati4n that the site iS rneeting perl`Q mance standards contained with in th e a pproved huffier Mitigation Plan Wildlands Engineering, Inc. (P) 704.332.7754 + 1430 South Mint Street, Suite 104 + Charlotte, NC 28203