Loading...
HomeMy WebLinkAbout20221039 Ver 1_Add Info_20220920Annino, Amy M From: Michael Romanello <MRoma nello@smeinc.com> Sent: Tuesday, September 20, 2022 2:36 PM To: Annino, Amy M Cc: Joey Lawler; Jeff Cloer Subject: [External] RE: DWR # 202201039 Nantahala River Crossing Improvements - Additional Information Request Attachments: Tate Cove Rd-Nantahala River Crossing Improvements - S&ME IFC 2022.09.20.pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon, Please find attached the revised engineering plans which provide the information requested in Item #1 below. The plans revisions detail a segmental block cofferdam system to divert a significant portion of flow away from the working section of the crossing. Turbidity monitoring has been included as a means to adhere to surface water quality standards. Please confirm receipt of this email and let me know if you have any immediate questions as this project is still pursuing completion by October 15, 2022. Thank you, Michael T. Romanello, P.E. Project Engineer S&ME, Inc. _ • ® 44 Buck Shoals Road, Suite C-3 Arden, NC 28704 III E M:614.403.04 6x11839 www.smeinc.com BUILT FOR Linkedln I Twitter I Facebook VERSATILITY This electronic message is subject to the terms of use set forth at www.smeinc.com/email. If you received this message in error please advise the sender by reply and delete this electronic message and any attachments. From: Annino, Amy M <amy.annino@ncdenr.gov> Sent: Wednesday, September 14, 2022 5:41 PM To: Joey Lawler <JLawler@smeinc.com>; Michael Romanello <MRoma nello@smeinc.com> Subject: DWR # 202201039 Nantahala River Crossing Improvements - Additional Information Request 1 On August 1, 2022, the Division of Water Resources (Division) received your application requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. Please provide more details regarding avoidance and minimization of in -stream impacts to install the articulated block concrete mat for this project. Please discuss how flows will be diverted / pumped around in -stream work areas. This information should be included in your construction sequence and on the plan/profile sheet within the plan set. [15A NCAC 02H .0506(b)(1)] Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please provide your response by October 14, 2022. If all of the requested information is not received, the Division will be unable to approve the application and it will be denied as incomplete. The denial of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Amy Annino Environmental Specialist — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 828 296 4656 office 984 232 1222 mobile amy.anninoa-ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time.