HomeMy WebLinkAboutCredit Release Request Form - OBerry Road Task 1WILDLANDS
ENGINEERING
November 2, 2022
CREDIT RELEASE REQUEST FORM
To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator
From: Andrea Eckardt, aeckardt&wildlandseng.com, 704-560-2997
Through: Wildlands Holdings III, LLC
We formally request a credit release for the O'Berry Road Mitigation Bank Parcel (2021-0019v2)
for completion of Tasks 1 and 7 per the approved credit release schedule, which is included in the
Attachments with this request. The following documents have been submitted to NCDWR for Task
1 and are pending review: NCDWR approved MBI, NCDWR approved BPDP, Construction Bond,
and recorded Conservation Easement.
Credits requested for release are detailed below:
Credit Type
% Release
Credit Amount
include Units
Notes/Comments
Buffer Restoration
25%
65,503.750 sq ft
Buffer Preservation
25%
2,183.450 sq ft
Buffer Enhancement
Generated Nitrogen Nutrient
Offset
25%
6,938.519 lbs. N
Delivered Nitrogen Nutrient
Offset Jordan sites only)
Generated Phosphorus Nutrient
Offset
Delivered Phosphorus Nutrient
Offset Jordan sites only)
Signature: ouvt� !�' Lk-c��
Attachments: 1) Approved Project Credit Table 2) Approved Credit Release Schedule
t Approved Project CreditTa Q — O'Serry Road Mitigation Sant Parcel
|
\
\
\
\
Ln
§
]
g
%
o
u
\
R
R
CN
�
t<
U
z
o
m
9
2
r
)
di 0
°
\
QJ
m
rl�
j
e
_
e
§
2
J
)
m
E §
}
/
§
5
) §
G
®
\
\
k
5
/
.
s
2
)
g
/
\
.
)
e
/
U
�
®
&
E
/
2
&amdsEngineering, Inc. M 3*22.354.14+ »ahEw keet,e& 104.aa & « 2z
2. Approved Credit Release Schedule — O'Berry Road Mitigation Bank Parcel
VII I. CREDIT RELEASE SCHEDULE
A. In general, upon submittal of all appropriate documentation by the Sponsor, and subsequent
approval by DWR, it is agreed that Riparian Buffer Credits and Nutrient Offset Credits associated
with the Cox Pond, O'Berry Road, and Little River Weaver Bank Parcels will become available for
sale to a third party in accordance with a Credit Release Schedule similarto that which is provided
in Table 3.0 below:
Table 3,0 - Credit Release Schedule for Riparian Suffer Credits and Nutrient Offset Credits
% Credit
Available for
Task
Project Milestone
Sale
Instrument and BPDP Approved by DWR, Conservation Easement
1
Recorded*, and Financial Assurance Posted
20
All mitigation activities including riparian earthwork, Planting and
Installation of Monitoring Devices Completed; easement
20
boundaries adequately marked, and all applicable permits
obtained, site visit performed by DWR
Monitoring Financial Assurance Posted and Approval of As -Built
3
Report
10
Monitoring Report#1: Approved by the DWR** & financial
4
assurance renewed
10
Monitoring Report#2: Approved by the DWR** & financial
5
assurance renewed
10
Monitoring Report#3: Approved by the DWR** & financial
C
assurance renewed
10
Item B (1) of Section X Pn this Instrument has been completed and
7
approved by DWR
5
No remaining credits wilf be released until Task T has been satisfied, assigning the
conversation easement to an approved land trust or long-term steward.
Monitoring Report #41: Approved by the DWR** & financial
8
assurance renewed
5
Monitoring Report #5: Approved by the DWR** and final site visit
9
by DWR has been conducted
10
Total
100%
* For specification, please see Section V in this Instrument
** DWR Approval provided upon a determination that the site is meeting performance
standards contained within the approved BPDP
WiIdIan ds Engineering, Inc. (P) 704.332.7754 • 1430 South Mint Street, Suite 104 • Charlotte, NC 28203