HomeMy WebLinkAboutCredit Release Request Form - OBerry Road Task 1WILDLANDS ENGINEERING November 2, 2022 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Andrea Eckardt, aeckardt&wildlandseng.com, 704-560-2997 Through: Wildlands Holdings III, LLC We formally request a credit release for the O'Berry Road Mitigation Bank Parcel (2021-0019v2) for completion of Tasks 1 and 7 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to NCDWR for Task 1 and are pending review: NCDWR approved MBI, NCDWR approved BPDP, Construction Bond, and recorded Conservation Easement. Credits requested for release are detailed below: Credit Type % Release Credit Amount include Units Notes/Comments Buffer Restoration 25% 65,503.750 sq ft Buffer Preservation 25% 2,183.450 sq ft Buffer Enhancement Generated Nitrogen Nutrient Offset 25% 6,938.519 lbs. N Delivered Nitrogen Nutrient Offset Jordan sites only) Generated Phosphorus Nutrient Offset Delivered Phosphorus Nutrient Offset Jordan sites only) Signature: ouvt� !�' Lk-c�� Attachments: 1) Approved Project Credit Table 2) Approved Credit Release Schedule t Approved Project CreditTa Q — O'Serry Road Mitigation Sant Parcel | \ \ \ \ Ln § ] g % o u \ R R CN � t< U z o m 9 2 r ) di 0 ° \ QJ m rl� j e _ e § 2 J ) m E § } / § 5 ) § G ® \ \ k 5 / . s 2 ) g / \ . ) e / U � ® & E / 2 &amdsEngineering, Inc. M 3*22.354.14+ »ahEw keet,e& 104.aa & « 2z 2. Approved Credit Release Schedule — O'Berry Road Mitigation Bank Parcel VII I. CREDIT RELEASE SCHEDULE A. In general, upon submittal of all appropriate documentation by the Sponsor, and subsequent approval by DWR, it is agreed that Riparian Buffer Credits and Nutrient Offset Credits associated with the Cox Pond, O'Berry Road, and Little River Weaver Bank Parcels will become available for sale to a third party in accordance with a Credit Release Schedule similarto that which is provided in Table 3.0 below: Table 3,0 - Credit Release Schedule for Riparian Suffer Credits and Nutrient Offset Credits % Credit Available for Task Project Milestone Sale Instrument and BPDP Approved by DWR, Conservation Easement 1 Recorded*, and Financial Assurance Posted 20 All mitigation activities including riparian earthwork, Planting and Installation of Monitoring Devices Completed; easement 20 boundaries adequately marked, and all applicable permits obtained, site visit performed by DWR Monitoring Financial Assurance Posted and Approval of As -Built 3 Report 10 Monitoring Report#1: Approved by the DWR** & financial 4 assurance renewed 10 Monitoring Report#2: Approved by the DWR** & financial 5 assurance renewed 10 Monitoring Report#3: Approved by the DWR** & financial C assurance renewed 10 Item B (1) of Section X Pn this Instrument has been completed and 7 approved by DWR 5 No remaining credits wilf be released until Task T has been satisfied, assigning the conversation easement to an approved land trust or long-term steward. Monitoring Report #41: Approved by the DWR** & financial 8 assurance renewed 5 Monitoring Report #5: Approved by the DWR** and final site visit 9 by DWR has been conducted 10 Total 100% * For specification, please see Section V in this Instrument ** DWR Approval provided upon a determination that the site is meeting performance standards contained within the approved BPDP WiIdIan ds Engineering, Inc. (P) 704.332.7754 • 1430 South Mint Street, Suite 104 • Charlotte, NC 28203